Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 

HEritage Resilience Against CLimate Events on Site (HERACLES)

Start date: May 1, 2016, End date: Apr 30, 2019,

HERACLES main objective is to design, validate and promote responsive systems/solutions for effective resilience of CH against climate change effects, considering as a mandatory premise an holistic, multidisciplinary approach through the involvement of different expertise (end-users, industry/SMEs, scientists, conservators/restorators and social experts, decision, and policy makers). This will be ...
Read Project

 16

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2016, End date: Feb 28, 2018,

HiPEAC is a support action that aims to structure and strengthen the European academic and industrial communities in computing systems: (i) by increasing innovation awareness and by encouraging researchers to engage in innovation activities; (ii) by professionally disseminating program achievements beyond the traditional scientific venues; (iii) by producing a vision document including recommendat ...
Read Project

 12

 FINISHED 

elastic WIreless Networking Experimentation (eWINE)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

The elastic Wireless Networking Experimentation (eWINE) research project will realize elastic networks that can scale to a high number of users in a short timespan through the use of an agile infrastructure (intelligent software and flexible hardware), enabling: (1) dynamic on-demand end-to-end wireless connectivity service provisioning, (2) elastic resource sharing in dense heterogeneous and smal ...
Read Project

 10

 FINISHED 

Online and Mobile Communications for Emergencies (SOTERIA)

Start date: Sep 1, 2014, End date: Feb 28, 2017,

The SOTERIA Project aims to research and develop recommendations and an associated toolbox that leverage the positive impact of social media in emergencies, enabling public safety organisations (PSOs) and citizens using new mobile and online social media technologies to communicate before, during and after an emergency event, and exchange critical information for the PSOs' intervention in emergenc ...
Read Project

 20

 FINISHED 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Read Project

 8

 FINISHED 

Future Internet - Core (FI-Core)

Start date: Sep 1, 2014, End date: Sep 30, 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Read Project

 33

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

CARBON BASED SMART SYSTEMS FOR WIRELESS APPLICATIONS (NANO RF)

Start date: Sep 1, 2012, End date: May 31, 2016,

Description New technologies and new wireless architectures identified as Beyond CMOS and More than Moore From the strategic agendas of ENIAC,EPoSS and ITRS it is evident that wireless applications are gaining more and more importance that results to new requirements in terms of miniaturization an ...
Read Project

 14

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 
Description Packaging and thermal management in an efficient and cost effective way for SiC and GaN-based power devicesFor industrial motor-drive, UPS and solar inverters applications and aerospace or telecom radio frequency applications, new emerging power semiconductor technologies, respectively SiC and GaN, have demonstrated their high ...
Read Project

 15

 FINISHED 

PROactive Safety PERformance for Operations (PROSPERO)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

Whilst a vision of zero deaths for air travel may seem unattainable it could be the goal of all involved in air traffic systems (ATS.) To get closer to this vision requires innovation and a different approach. In Vision 2020 the EU set a goal of reducing the air travel accident rate by 80%. The implementation of PROSPERO will provide an advanced systemic methodology for managing the improvement pr ...
Read Project

 17

 FINISHED 

Cognitive Radio Experimentation World (CREW)

Start date: Oct 1, 2010, End date: Sep 30, 2015,

The main target of CREW is to establish an open federated test platform, which facilitates experimentally-driven research on advanced spectrum sensing, cognitive radio and cognitive networking strategies in view of horizontal and vertical spectrum sharing in licensed and unlicensed bands.The CREW platform incorporates 5 individual wireless testbeds (heterogeneous ISM @ iMinds-Gent, heterogeneous l ...
Read Project

 17

 FINISHED 
RF communication and remote sensing (radar/radiometric) systems are facing the demands ofincreasing complexity/number of frequency bands, increased bandwidths and higher frequencies forhigher data throughput, while at the same time the power consumption, the form factor of the systems,and the overall system costs need to be reduced. Smart micro-/mm-wave systems will have to achieveself-reconfigura ...
Read Project

 17

 FINISHED 
The iSAR+ Project aims to research and develop guidelines and an associated platform that, in emergencies or crises, enables citizens using new mobile and online technologies to actively participate in the response effort, through the bi-directional provision, dissemination, sharing and retrieval of information essential for critical PPDR intervention, in search and rescue, law enforcement and med ...
Read Project

 20

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

Next Generation Hybrid Interfaces for Spintronic Applications (HINTS)

Start date: Jun 1, 2011, End date: May 31, 2014,

The development of conceptually new materials following a “double beyond” trend, that is going “beyond CMOS” with “beyond silicon” materials, is one of the most challenging issues for the next generation of products for Information and Communication applications. Future devices for information processing able to increase the public wealth and occupation require a further material downscaling, toge ...
Read Project

 14

 FINISHED 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Read Project

 41

 FINISHED 
Future wireless systems will have to achieve self-reconfigurable operations for real time efficient optimization of their performances. RF-MEMS switches will allow to face this challenge and open the route towards reconfigurability of high power systems, but their reliability is still nowadays an issue. The aim of NANOCOM project is to develop a new approach for future generation of smart systems ...
Read Project

 13

 FINISHED 

MAnaging System Change in Aviation (MASCA)

Start date: Dec 1, 2010, End date: Nov 30, 2013,

...of partners to address the ‘whole air transport system’ – airlines (SAS and Eurofly) include flight, maintenance and ground operations companies, airport authority (Arlanda), OEM (Thales Avionics) a world leader in aircraft technologies, universities (TCD, KTH), research organisation (NLR), and an SME (KITE) with a strong profile in technology and human factors services to aviation. The eight part ...
Read Project

 9

 FINISHED 
The ENIAC JU project MERCURE is developing advanced semiconductor materials to provide functionality not available before with silicon-based micro- or nanoelectronics. It will enable future ambient intelligence systems to achieve autonomous and self-reconfigurable operations with real-time and efficient self-optimisation of performance. Key applications will include the future wireless communicati ...
Read Project

 9

 FINISHED 
The complete transition from analogue to the digital TV is planned in Europe for 2012. This will release significant amount of valuable spectrum in VHF/UHF bands. In fact, the Digital TV Switchover provides a "once in a lifetime" opportunity for the development of innovative services and the introduction sophisticated new technologies into the VHF/UHF bands.However, despite the grand words about o ...
Read Project

 10

 FINISHED 
Manual work is a crucial and expensive component of manufacturing. Globalization causes companies to reduce manual work costs by offshoring and global outsourcing. This poses problems such as increased lead times, lower quality products and services, and weaker management. Because of the pressure of globalization and the decline of the working age population in Europe, the situation will get worse ...
Read Project

 19

 FINISHED 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper ...
Read Project

 39

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

Due to technology limitations, the domain of high-performance processors is experiencing a radical shift towards parallelism through on-chip multi-cores and chip customization leading to heterogeneous multi-core systems. Furthermore, the commodity market, the supercomputing market and the embedded market are increasingly sharing the same challenges, leading to convergence of the three markets.The ...
Read Project

 14

 FINISHED 

Governing the speed of light (GOSPEL)

Start date: Sep 1, 2008, End date: Dec 31, 2011,

The GOSPEL project aims at developing new, highly effective technologies for enabling slow and fast light propagation as a tunable feature in photonic devices. In fact, controlling the speed of light offers a solution to a necessary, and often missing, functionality in broadband ICT systems: a time-delay/phase-shift line. The proposed research will address three slow and fast light device platform ...
Read Project

 8

 FINISHED 

Materials for Robust Gallium Nitride (MORGaN)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Read Project

 24

 FINISHED 
Description Combining software services is difficult. ALIVE applies techniques from organization theory to software-based services, to make those services easy to assemble and use in complex scenarios. Software-based services can help solving a large variety of problems, but combining them in non- ...
Read Project

 8

 FINISHED 
EU-MESH's goal is to develop, evaluate, and trial a system of software modules for building dependable multi-radio multi-channel mesh networks with QoS support that provide ubiquitous and ultra-high speed broadband access. The system will be based on a converged infrastructure that uses a wireless mesh network to aggregate the capacity from both subscriber broadband access lines and provider fixed ...
Read Project

 9

 FINISHED 
Many pupils as well as parents unfortunately consider Mathematics as a difficult and boring subject. Education systems and teachers have to compete with what students find as fun and enjoyment outside the school system. One way to bring pupils back to the ‘playing field’ of education is to use similar tools (weapons) like the ‘opponents’, that is activities that will enjoy to do but through them ...
Read Project

 13

 FINISHED 
The Cloud is a major technological breakthrough with huge potential for education. It allows students and their tutors/teachers to interact productively in formal and informal education situations. Hosted Cloud communities mean that learners themselves can become creators and developers. Laptops and tablets will be everywhere, eBooks will replace text books as a normal part of classroom learning. ...
Read Project

 57