Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The first main objective of this proposal is to determine topological and Floer-theoretic obstructions to the existence of embedded Maslov-zero Lagrangian desingularizations of special Lagrangian (SL) cones. In particular, several such obstructions are expected to arise from the application of Contact homology techniques to the boundary of a neighbourhood of the singular point.The second main obje ...
Read Project

 1

 FINISHED 
Celem nadrzędnym podejmowanego działania jest zwiększenie konkurencyjności obszaru przygranicznego poprzez rozwój infrastruktury drogowej na terenie Powiatu Lwóweckiego. Przedmiotem wniosku o dofinansowanie jest odcinek drogi powiatowej nr 2494D Rębiszów-Kłopotnica, który obejmuje działania na odcinku 1674 m, będący częścią układu drogowego Gryfów Śl.–Chmieleń. Jego modernizacja poprawi jakość dro ...
Read Project

 2

 FINISHED 
For the Deaf, the availability of quality Sign Language (SL) interpretation services isdecisive in empowering them to manage their own interests and assuring opportunitiesfor equal participation in the multicultural European society. The objective of this projectis to develop SL interpreter education for interpreting in international settings and raiseawareness of the good professional practices t ...
Read Project

 5

 FINISHED 

KOMPETENCJE TRENERSKIE NA MIARĘ SL BENFICA

Start date: Jul 1, 2014, End date: Jun 30, 2015,

The project represents a further stage in the development of regional football coaches' skills. Since July 1, 2013 the project promoter has been carrying out the project in the framework of the programme "Lifelong Learning Programme" - a sectoral programme financed under "Leonardo da Vinci" which is intended to offer support for 30 football coaches/instructors from the region of Lower Silesia, whe ...
Read Project

 2

 FINISHED 
Our project "Beruflichkeit Bleibt (im) Zentrum (unserer) Schulischen Leistungsfähigkeit (BBZ SL)" (translation: Vocational Identity at the Centre of our Academic Achievement") describes the core of our successful (German) dual Vocational Education and Training (VET) System. We don't (have to) hide from the purely academic (general) education system. Rather, we emphasize our vocational background. ...
Read Project

 4

 FINISHED 
Dynamics on polygonal billiard tables is best understood by unfolding the table and studying the resulting flat surface. The moduli space of flat surfaces carries a natural action of SL(2,R) and all the questions about Lie group actions on homogeneous spaces reappear in thisnon-homogeneous setting in an even more interesting way.Closed SL(2,R)-orbits give rise to totally geodesicsubvarieties of th ...
Read Project

 1

 FINISHED 
The project aims to improve the quality of life for residents of urbanized areas, thus improving the attractiveness of the area, which must come from the concrete and actual needs of residents for the proper guidance of medical and social services. ...
Read Project

 10

 FINISHED 
The project falls within the context of the entry of Slovenia in the European Union and the corresponding dismantling of the border between Italy and Slovenia, and aims at identifying useful instruments to coordinate territorial management and planning and, in turn, territorial planning with a medium-long period approach in order to develop the economy of the interested area. Specifically, the pro ...
Read Project

 1

 FINISHED 
The project is designed to evaluate the local cultural heritage collections in the border region between the Alps and the Slovenian Karst and Italy. Cultural Heritage in collaboration with collectors, locals and experts presented to the general public. Local and national collections will be inventoried, cataloged and described in the guide book, the leaflets and website. Set the new collections an ...
Read Project

 11

 FINISHED 

Charter Boat Skipper 

Start date: Feb 29, 2004, End date: Nov 29, 2004,

The Italian, Slovenian and Croatian coasts in the Eastern part of the Upper Adriatic are becoming more and popular as tourist destinations for yachting, sailing and nautical activities in all sizes and forms. On the one hand there is mass tourism, possessing little or no specific knowledge but an eagerness to experiment nautical tourism. On the other there are large cruise ships and mega-yachts re ...
Read Project

 1

 FINISHED 
EUROPAPRENEURPartners:Opeko, AKOL& The Federation of Finnish Enterprises from Finland Irish Small and Medium Enterprises Association Ltd Ireland DBO Belgium Scalconsult – Consultores, Lda Portugal Instituto de Formación y Estudios Sociales – IFES, SpainCENTRE RECURSOS D’INICIATIVES I AUTOCUPACIÓ SL, Spain SVGB kennis- en opleidingencentrum, Holland; Center Republike Slovenije za poklicno izobražev ...
Read Project

 11

 FINISHED 
Background The treatment and disposal of sludge contaminated by heavy metals, microorganisms and several organic compounds is an increasing problem. Its disposal on farm land creates a potential risk for human health and the environment. However, alternative solutions, such as thermal treatment, are becoming more important in Europe. In Germany, already a ...
Read Project

 3

 FINISHED 
The participating Municipalities, sharing a bond of geographical, physical and tourist similarities, have identified in the underwater world and in their respective natural resources, the starting point for the development of this project, which unwinds around the theme of the sea and its underwater natural and archaeological resources. The common objective consists in the enhancement and promotio ...
Read Project

 1

 FINISHED 

Cave del Predil international geomineral park 

Start date: Jun 30, 2004, End date: Aug 30, 2006,

This project will set up an international, geomineral, historical and environmental route inside the dismantled Raibl mine (at Cave del Predil in the Municipality of Tarvisio) which is unique in the Friuli Venezia Giulia region. Specifically, a route is created inside the mine systems and the Kaiser Franz Erbstollen tunnel (Francesco tunnel) will be renovated as well as the Camerone Santa Barbara ...
Read Project

 1

 FINISHED 
PORTOLANDO aims at consolidating nautical maritime-fluvial tourism by means of targeted actions leading to the retrieval of routes and thematic itineraries that are often unknown, in order to promote the Upper Adriatic territory, its history, culture and natural beauty. As the territory is often characterized by watercourses and navigable lagoons of historical and architectural interest, the proje ...
Read Project

 1

 FINISHED 
The goal of the project is to ensure a critical number of reference cases and market-uptake of a new precast concrete product, called the SL-Deck, thereby overcoming market barriers that has been hampering the market uptake of this innovative product. The SL-Deck is based on a patented new technology, Super-Light Structures (SLS), which originally was developed at the Technical University of Denma ...
Read Project

 2

 FINISHED 

Tradition and innovation in use of animal products (LANATURA)

Start date: Jul 31, 2011, End date: Jun 29, 2014,

The project aims to increase the amount of processed wool and to reduce the amount of wool waste. The activities are aimed to revive the traditional uses and to explore and introduce modern use of sheep wool, hides and skins and animal fat in the handicrafts and the economy. ...
Read Project

 12

 FINISHED 

Festival 

Start date: Mar 31, 2005, End date: Jul 30, 2008,

The “Cello & Music” Festival was held for the first time in 2000, and cello and chamber music courses were organized. The success of this initiative led to the continuation of this experience, giving rise to a project that, through the music, intensifies the relationship between border peoples thanks to music and cultural meetings in Trieste, Gorizia, Udine, Nova Gorica and Tolmin. This project ai ...
Read Project

 1

 FINISHED 
The global aim of the CoMeIn projects is to contribute to prevention of school leaving at secondary education level in Bulgaria, France, Poland, Slovenia and Turkey. Our idea is to equip teachers in the countries involved with the necessary knowledge, skills and tools to motivate and inspire students for learning by development and pilot testing of Coaching Methodology. The Methodology will allow ...
Read Project

 6

 FINISHED 

„Europejskie kompetencje szansą na sukces”

Start date: Jun 1, 2015, End date: May 31, 2017,

The aim of the project is to acquire vocational skills during students' trainings in firms working in the catering and hotel trade that cooperate with Vitalis and EME SL in Leipzig ( The Adler Hotel, The Royal International Hotel , The Regency Hotel, The Amadeo Hotel , The Admiral Hotel ) also in Valencia (The Las Arenas Hotel, The Best Western Albufera Hotel, The Villareal Hotel, The 50 Flats Ho ...
Read Project

 3

 FINISHED 
Background Tryggelev Nor is one of several coastal lagoon areas that disgorges into the Baltic Sea. This particular area is located both within an SPA and an SCI on the island of Langeland at the sourthernmost tip of Denmark. Over the years, the lagoon has suffered from increasing eutrophication and stagnation, which has severely negatively affected the c ...
Read Project

 3

 FINISHED 

Food-and-wine and artistic handicraft itineraries (LAND ART & WINE)

Start date: Dec 31, 2005, End date: Aug 30, 2007,

This project follows along the same lines of project The development of an Idrija lace trademark, implemented in 2003-2004 and aimed at the creation of a strong, appraised and recognizable trademark, called Idrija Lace. The early project aimed to ensure the positioning and recognition of this trademark in various sectors, including tourism. In this new framework, a development strategy will be dra ...
Read Project

 1

 FINISHED 

Renovation and re-use of Salzano spinning mill for cultural purposes

Start date: Dec 31, 2002, End date: Sep 29, 2004,

This project stems from the need, voiced by the municipality of Salzano, to renovate the Romanin-Jacur spinning mill (which the municipality has owned since 1979) and the eighteenth-century villa that hosts the town hall, as well as the adjoining English garden. The building is a real architectural, environmental and historical jewel and is a place of interest as example of industrial archeology. ...
Read Project

 1

 FINISHED 
The project aims to improve knowledge of biodiversity in the program area and collect the rich linguistic and cultural heritage. Expected Results: Guides that can be used by blind and visually impaired, and guides to determine ...
Read Project

 11

 FINISHED 
Developing a common system for efficient management of water as required by EU. Expected Results: Elaboration of expertise (guidelines) for the development of a uniform system for the sustainable management of transboundary wa ...
Read Project

 10

 FINISHED 

Renovating the cross-border road network

Start date: Dec 31, 2004, End date: Nov 29, 2006,

The project aims at improving the intermunicipal road network leading to the Ponte Vittorio border crossing and intends to consolidate the cross-border road axes, facilitating the crossing of the border to the nearby Republic of Slovenia. The project focuses on the connecting road system that, from state road n. 356, runs towards the Ponte Vittorio border crossing through the upper section of Nati ...
Read Project

 1

 FINISHED 
The project aims to evaluate the economic situation of small and medium-sized livestock farms and to prepare appropriate strategies and solutions that contribute to their improvement and reintegration into the national and international markets. In doing so, special attention and intensive and extensive/ organic breeding dairy cows. ...
Read Project

 6

 FINISHED 

European project design (Basic level) 

Start date: Apr 30, 2005, End date: Sep 29, 2006,

This training course, divided in a series of themed actions, is aimed at public operators who wish to become more familiar with Structural Funds and the funding of programmes and projects intended to promote the socioeconomic development of the territory. This initiative, falling within the framework of lifelong education for the staff of local institutions to encourage an improvement and a specia ...
Read Project

 1

 FINISHED 

Vinnande val

Start date: May 14, 2008, End date: Nov 29, 2008,

Idrottsrörelsen står bakom den svenska regeringens folkhälsomål nr 11, dvs. att arbeta för att senarelägga alkoholdebuten och att minska alkoholkonsumtionen. Studieförbundet SISU Idrottsutbildarna Jämtland-Härjedalen ska utveckla det drogförebyggande arbetet inom länets idrott, gärna tillsammans med länets IOGT-rörelse och kanske även gränsöverskridande med Tröndelag. Förprojektets målsättning var ...
Read Project

 1

 FINISHED 

Cross-border Echoes (ECHOS)

Start date: Sep 30, 2012, End date: Apr 29, 2015,

The project aims to improve the social and cultural cooperation in cross-border level with the joint development and exchange of artistic productions, while encouraging tourism and cultural heritage of the area. Expected Results: ...
Read Project

 3

 FINISHED 

Control systems technician

Start date: Sep 30, 2004, End date: Sep 29, 2006,

This project is implemented by the Consortium for the AREA of scientific and technological research of Trieste, that already participated in three project editions, financed by the ESF (European Social Fund). The professional figure proposed - ISTAT code 3.1.2.4 - is that of a highly qualified and specialised technician, who can function in various professional environments, ranging from the class ...
Read Project

 1

 FINISHED 

Wet area for tourism envir and recreation (WATER)

Start date: Jan 31, 2005, End date: Nov 29, 2006,

The project aims at enhancing a route between wet and transitional environments, to join some interesting naturalistic-environmental areas: the Laghetti di Martellago park, the Nuove Gemme di Spinea park, the former Salzano quarries, the former Luneo quarries (WWF oasis) and a new area included in the urban territory in the municipality of Spinea. Research and studies will be carried out to foster ...
Read Project

 1

 FINISHED 
Background The Danish coastline bordering the North Sea is famed for its long stretches of white sandy beaches and extensive dunes. Substantial tracts are also of high international conservation importance. However, these dune systems have suffered from an array of problems over the years, associated with inappropriate land use and over-stabilisation. ...
Read Project

 1

 FINISHED 

Integrated disruptive componentS for 2um fibre LAsers (ISLA)

Start date: Oct 1, 2011, End date: Jun 30, 2015,

2-micron fibre laser technology has the potential to open a whole new area of ICT & industrial applications. The well-known power scaling advantages, from increased core size & higher non-linear thresholds, offer a tenfold increase in "raw power" compared with current 1-micron technology. Simultaneously, a host of applications specific to this almost unexplored region of the eye-safe spectrum beco ...
Read Project

 9

 FINISHED 
eCult Skills investigated new and emerging jobs in this area in 6 countries (UK, SL, DE, FR, EL, PT), compared them and created national profiles, following the methodology developed in former LLP projects and applied them to the cultural sector. The project analyzed the market needs, the existing trainings available for the different components and competences (objective 1), and defined a profess ...
Read Project

 5

 FINISHED 
The project Trans2Care involves and integrates the expertise of 13 institutes of research, training, health care and technology transfer. It seeks to establish a permanent two-way flow of knowledge transfer between the partners, industrial companies and other stakeholders, aimed at establishing a system that can generate innovative products and services to public health, in particular for the prev ...
Read Project

 13

 FINISHED 
Background The vast quantity of natural stone products used in the construction industry generates significant amounts of slurry deposits - estimated at five million tonnes per year in Europe. These deposits are often toxic as they contain chemicals from the mining processes, yet they are typically disposed of in poorly controlled or un-controlled dumps. ...
Read Project

 4

 FINISHED 
The project aims to define a cross-border tourist offer by joining different types of itineraries in the territorial areas involved. Specifically, the project aims at diversifying and integrating the tourist offer by connecting the three key tourist sectors of nature, culture and sports in one single cross-border context. In the light of the needs expressed by the territory - through a bottom-up a ...
Read Project

 1

 FINISHED 

European project design (advanced level) 

Start date: Apr 30, 2005, End date: Sep 29, 2006,

The project, the continuation of “European Project design - Basic level”, offers a training a refresher course aimed at analysing in depth the issues related to cross-border project making. This initiative, falling within the framework of lifelong education for the staff of local institutions to encourage an improvement and a specialisation of personnel, consists of a large number of classroom act ...
Read Project

 1

 FINISHED 

Land of chestnuts - Prostor kostanja

Start date: Sep 30, 2005, End date: Dec 30, 2007,

This project stems from the need to foster the agricultural and commercial recovery of one of the most representative and typical products of the Natisone Valley: the chestnut. This initiative mirrors a similar project which was financed in Slovenia by Phare-CBC Programme (Small project fund) and intends to increase the visibility of the territory, to contribute to the tourist development of the a ...
Read Project

 1