Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Mobil beléptető kapu tervezése forgóajtóval

Start date: Jul 1, 2015, End date: Jun 30, 2016,

...ms during two lessons a week at grade 11. Design with AutoCAD and INVENTOR programs are taught at our school. The actual aim of the project is to make students become familiar with a 3D engineering software, they do not have access to at our school, but which is used by plants located near their place of residence (One Space Designer Version 18.1). Within the framework of the project after getting ...
Read Project

 2

 FINISHED 

Nachhaltiger Hochwasserschutz

Start date: Apr 17, 2007, End date: Dec 30, 2010,

...st, konnte das Rechenmodeil wesenilich weiterentwickelt und für den kommerziellen Einsatz ,ffig*brrt *erd"n. Die software steht kostenlos zur verfügung und kann aus dem lnternet von der vAW ETH Ztiii.n bezogen werden. Neuartig waren auch die BerÜcksichtigung unterschiedlicher Einzeluntersuchungen und deren ZusammenfÜhrung im Zuge der simulationsberechnungen. so wurden Ergebnisse aus.den seegrunoau ...
Read Project

 2

 FINISHED 
... und installiert.Das Verwaltungsgebäude im Drawa-Park wurde behindertengerecht umgebaut, u.a. durch Montage desTreppenlifts. Ausserdem wurden Infoterminals mit entsprechender Software beschafft. Der Partner hat auch das Buch "Auf den Spuren der ehemaligen Bewohner des Drawska-Urwaldes" in drei Sprachen veröffentlicht.Stadt Biesenthal (Partner 2):Die Sanierung des Schlossbergareals in Biesenthal wu ...
Read Project

 3

 FINISHED 
...training enterprises such as Merck, Deutsche Bahn AG, Entega AG, Evonik, the Forschungseinrichtung Gesellschaft für Schwerionenforschung (GSI), der Technischen Universität Darmstadt, Telekom, Software AG, Fraunhofer Institut, mg.softec and KMU the periods of studying abroad are a significant part of the profile development of the trainee programme and the staff qualification concerning global oper ...
Read Project

 5

 FINISHED 
...ms during two lessons a week at grade 11. Design with AutoCAD and INVENTOR programs are taught at our school. The actual aim of the project is to make students become familiar with a 3D engineering software, they do not have access to at our school, but which is used by plants located near their place of residence (One Space Designer Version 18.1). Within the framework of the project after getting ...
Read Project

 2

 FINISHED 
...rience in the essence and functioning of management systems and resource planning, support and data control at report level. Students will also gain experience in working with specialized software, budget controlling, financial and accounting activities. They will be introduced to the practical fulfillment and monitoring of resources and warehouse management. All these will contribute to the highe ...
Read Project

 2

 FINISHED 

Practica in automatizari Siemens

Start date: Oct 12, 2014, End date: Oct 11, 2015,

...d of automation.             Students worked with Lego-Siemens modules and used specialized software design Comfort.             Students have developed theoretical and practical automation projects, which can not be achieved with existing facilities at our school.
Read Project

 2

 FINISHED 

Zaawansowane umiejętności projektowania w Auto CAD

Start date: Dec 15, 2014, End date: Dec 14, 2015,

...pass Certificates with detailed information about the course and is able to prepare a training for large number of participants offering state-of-the-art equipment and the latest versions of Autodesk software. It owns German and English licence for autodesk. ?l.TZN which in the last decade was a leading school in The Perspektywy and The Rzeczpospolita rankings of schools in Poland, regularly be ...
Read Project

 2

 FINISHED 

E-Learning: Virtual Classroom Training

Start date: Jun 1, 2015, End date: May 31, 2017,

...omputer –Network): to acquire the technical knowledge and learn about the latest developments in the use of electronic means necessary both in terms of hardware (hardware) and software (software) O Expected impact of the project participants includes: Improving knowledge and skills in order to be able to plan, organize & promote effectively e-learning programs. Increase the skills of trainers and ...
Read Project

 2

 FINISHED 
...gies are so important ,their numbers about money became so huge too .Its not official but in many article says more than 500 million Turkish Lira for Turkey.%90 of this money is going to imported software and hardware.Qualified technic staff deficit is so big in this sector. So our aim for this project increase our school’s instutional capacity and improve our students’ and teachers’ perfection a ...
Read Project

 2

 FINISHED 

MAsk less lithoGraphy for IC manufacturing (MAGIC) (MAGIC)

Start date: Jan 1, 2008, End date: Dec 31, 2010,

...n with this activity, the program will develop the required infrastructure for the usage of this tools in an industrial environment. Among the tasks to be addressed, there is a delivery of a reliable software platform to treat the data base preparation and to provide solutions for ML2 related electron proximity effects. The last concern of this project will be to demonstrate the ability to integra ...
Read Project

 19

 FINISHED 
...ir professional knowledge and skills in computer networks and Web- design in accordance with modern requirements for training in the profession, and mastered the knowledge of working with various software. Experience Partner assessment of learning outcomes was used in the evaluation through cards with elements of ESVET. The practice program was divided into five teaching units, three of them f ...
Read Project

 2

 FINISHED 

Experienta profesionala europeana in Webdesign& IT Networking

Start date: Oct 1, 2015, End date: Sep 30, 2016,

...training of 30 participants, students of the school, with intensive computer science specialization who, at the end of high-school, receive a ’’Competente to make customer –oriented software design and structure (software applications, database, web pages), adaptation customer information systems” certificate, and who will participate in two streams at a traineeship in Germany at the host organiza ...
Read Project

 2

 FINISHED 
...ities. Participants of the first internship focused on Automation technology will gain professional skills in the field of connections and hardware settings in the Programme Logic Automat (PLC), software setting „Logo! Soft Comfort“ and configuration of various applications of PLC Siemens Logo. At the end of the internship they will plan and independently implement their own project with the use ...
Read Project

 2

 FINISHED 
...fication) and detection of EGFR mutations in tumour DNA by means of gold and silver-nanoparticles (Ag and Au-nanoprobes). Furthermore a microfluidic chip analyser with an integrated user-friendly software to report genotyping results will be developed.
Read Project

 7

 FINISHED 
...rther goal of LOCOBOT is the improvement of ergonomics in industrial production processes. A group of key players in the automotive industry, in automation components, advanced robots and engineering software will be supported by a group of excellent researchers to solve the technical and scientific challenges in LOCOBOT. The results will be demonstrated by setting up 3 typical and highly relevant ...
Read Project

 10

 FINISHED 
"The 24-month ELEVATE project proposes a hybrid training and certification environment, which integrates the application software to be taught in the pedagogical-documented educational process, allowing the software development SMEs to deliver innovative e-training services and to address (more than adequately) the needs of their business partners and customers. Thus, the ELEVATE project addresses ...
Read Project

 9

 FINISHED 
...ce both partner research capabilities in the high-frequency vibro-acoustic region, iii) create a more flexible mid-frequency technique needed by the automotive industry, and iv) enhance the SME’s software product capability in the mid- and high-frequency regions."
Read Project

 2

 FINISHED 
...TE as a platform to integrate SysML with a run-time environment for cross-domain verification, (c) the automatic generation of implementable descriptions for both hardware (SystemC/VHDL) and embedded software (C/C++) components of the targeted system, and (d) the integration of different abstraction layers allowing seamless integration at functional and target architecture level. Results are valid ...
Read Project

 9

 FINISHED 
... well as automotive extensions for Nanomech will be developed. An alternator-like demonstrator with and without eNVM is selected for a worst case proof of concept. eNVM will enable "flexibility" to software-configure alternator systems for multiple car platforms. Valeo Electrical Systems will provide system specifications, system development and system evaluation. The other research partners cont ...
Read Project

 8

 FINISHED 
The manufacturing industry is entering a new era in which new ICT technologies and collaboration applications are integrated with traditional manufacturing practices and processes, which brings virtual organisations to factories, i.e. Manufacturing 2.0. Virtual factory to future manufacturing slows the flexible amalgamation of manufacturing resources in multiple organisations to create timely, dem ...
Read Project

 5

 FINISHED 
...ersectoral organisation of the consortium with partners from academia and companies that need these future experts to develop new instruments, screen drugs and chemicals in living systems and develop software to analyse and model medical images. The full training programme is based on an optimal balance between training through research and many network-wide training events, including conferences ...
Read Project

 11

 FINISHED 
...or increased security, data protection privacy and vast resource (de)-allocation. Towards this end, and building upon this umbrella concept, the Unicorn vision can be considered two-fold: to enable software developers to design and develop secure and elastic applications and to increase the awareness of all stakeholders, in particular SMEs and Startups. Unicorn will ...
Read Project

 11

 FINISHED 
PrEstoCloud project will make substantial research contributions in the cloud computing and real-time data intensive applications domains, in order to provide a dynamic, distributed, self-adaptive and proactively configurable architecture for processing Big Data streams. In particular, PrEstoCloud aims to combine real-time Big Data, mobile processing and cloud computing research in a unique way th ...
Read Project

 11

 FINISHED 
...ment teams for these platforms and the contributions will be released back to the used platforms as open source. The integrated MELODIC platform will be maintained and exploited by a professional software house, and tested in several demanding real world applications: scalable Customer Relationship Management, real-time optimised traffic routing, and fast and scalable processing of genomic data.
Read Project

 7

 FINISHED 
Current practice is such that a production system is designed and optimized to execute the exact same process over and over again. The planning and control of production systems has become increasingly complex regarding flexibility and productivity, as well as the decreasing predictability of processes. The full potential of open CPS has yet to be fully realized in the context of cognitive autonom ...
Read Project

 16

 FINISHED 
The OPENHYBRID project will overcome the technical and commercial barriers of current hybrid manufacturing systems to deliver a single manufacturing system capable of undertaking a wider range of processes in a seamless automated operation. The new system will offer unrivalled flexibility in terms of materials, including the ability to switch between powder and wire feed-stock within a single part ...
Read Project

 14

 FINISHED 
...N will collaborate to the consolidation of the Hybrid Manufacturing value chain by means of a consortium specially selected for linking research results to technological necessities in the fields of software, monitoring, automation, materials, standardization and end-users.KRAKEN machine will be devoted to the production and reparation of functional parts of any size with dimensional tolerances un ...
Read Project

 15

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 
"Industry 4.0 is the next developmental stage in the organisation of the manufacturing value chain. ICT-based systems will play a major role, mainly by creating a virtual copy of the physical world and facilitating decentralised structures through Cyber-Physical Systems (CPS). Over the IoT, CPS cooperate with each other and humans in real-time. Via the Internet-of-Services, internal and cross-orga ...
Read Project

 9

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Industrial optimal design using adjoint CFD (IODA)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Adjoint-based methods have become the most interesting approach in numerical optimisation using Computational Fluid Dynamics (CFD) due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are member ...
Read Project

 10

 FINISHED 
The objective of the BIG IoT project is to ignite really vibrant Internet of Things (IoT) ecosystems. We will achieve this by bridging the current interoperability gap between the vertically integrated IoT platforms and by creating marketplaces for IoT services and applications. Despite various research and innovation projects working on the Internet of Things, no broadly accepted professional IoT ...
Read Project

 14

 FINISHED 

Holistic Benchmarking of Big Linked Data (HOBBIT)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

... of the BLD lifecycle. In contrast to existing benchmarks, we will provide modular and easily extensible benchmarks for all industry-relevant BLD processing steps that allow to assess whole suites of software that cover more than one step.The infrastructure necessary to run the evaluation campaigns will be made available. Our architecture will rely on web interfaces and cloud infrastructures to en ...
Read Project

 12

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Start date: May 1, 2015, End date: Oct 31, 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Read Project

 19

 FINISHED 
MAYA aims at developing simulation methodologies and multidisciplinary tools for the design, engineering and management of CPS-based (Cyber Physical Systems) Factories, in order to strategically support production-related activities during all the phases of the factory life-cycle, from the integrated design of the product-process- production system, through the optimization of the running factory, ...
Read Project

 11

 FINISHED 

Multi-ObjecTive design Optimization of fluid eneRgy machines (MOTOR)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The MOTOR project focuses on ICT-enabled design optimization technologies for fluid energy machines (FEMs) that transfer mechanical energy to and from the fluid, in particular for aircraft engines, ship propellers, water turbines, and screw machines. The performance of these machines essentially depends on the shape of their geometry, which is described by functional free-form surfaces. Even small ...
Read Project

 11

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47