Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Read Project

 37

 FINISHED 

Sustainable Organic Coatings for Corrosion Protection (SUSTICOAT)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

BACKGROUND / NEED:There is a requirement to improve the sustainability of organic coatings by removal of materials hazardous to human health and by optimal use of raw materials and energy in manufacture and utilisation.AIM / OBJECTIVES:SUSTICOAT is a multidisciplinary project advancing understanding of how to improve the sustainability of organic coatings (paints) for corrosion protection to marke ...
Read Project

 2

 FINISHED 

GrowSmarter

Start date: Jan 1, 2015, End date: Dec 31, 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Read Project

 41

 FINISHED 
Smart-Rail has established the following objectives that are aligned with the requirements of the topic MG 2.2 and the various policy objectives:•Introduce a wide set of innovative measures aiming to improve the freight rail services offered to the shippers, focusing on five key topics: reliability, lead time, costs, flexibility and visibility. •Contribute to a mental-shift of the rail sector towa ...
Read Project

 19

 FINISHED 

Mezinárodní spoluprací ke zvýšení kompetencí

Start date: Sep 1, 2016, End date: Aug 31, 2017,

...al competence of pupils and teachers of the school. Work placements abroad will attend the 12 students of cook, waiter field of studying+ 2 accompanying teachers. The second group will be students of carmechanic field of studying, 12 students + 2 accompanying teachers. The last group will be 5 staff of the school.Students of cook, waiter will go to Milan, Italy to our foreign partner APAF. The mai ...
Read Project

 4

 FINISHED 

Learning E-Mobility

Start date: Sep 1, 2014, End date: Aug 31, 2017,

...oil prices and environmental concerns, the awareness of the need for development of sustainable mobility based on renewable energy is growing. All automobile manufacturers produce models of electric cars, and they, slowly but unstoppably, take their place in traffic especially in urban areas. Through the previous project, Europe Electric Car (Leonardo da Vinci Partnership, 2012-2014), ŠKOLA ZA C ...
Read Project

 8

 FINISHED 

Rozvoj odborných kompetencí v zahraničí

Start date: Jul 1, 2016, End date: Jun 30, 2017,

Sending organization in this project is the Střední průmyslová škola Zlín, which carries the longest tradition of technical vocational education in the region. Currently offers education in four fields of studying - mechanical engineering, electrical engineering, technical lyceum and construction. We would like to convey foreign professional internship to students of mechanical engineering and ele ...
Read Project

 4

 FINISHED 

Osobnosti, ktoré vytvárajú kvalitu

Start date: Jun 1, 2016, End date: May 31, 2017,

...transportation - 4 participants.We plan to implement the work placement in November-December 2016.The work placement takes place in real working conditions and in companies specializing in transport, car mechanics and administration. The main objectives of the project are:- better application of theoretical and practical knowledge in real working conditions- extension of professional Hungarian and ...
Read Project

 3

 FINISHED 

Phoenix VIII

Start date: Jun 1, 2015, End date: May 31, 2017,

...iday 22nd January to Sunday 21st February 2016 Second period: from Friday 6th January to Sunday February 5th 2017 -Doncaster College that is our intermediate partner for the cultural, educational and caring of the students -The companies (auto dealerships) that welcome our students for a placement in their mechanic and car body workshops. The project has many educational, professional and human g ...
Read Project

 6

 FINISHED 

DYNamic citizens @ctive for sustainable MObility (DYN@MO)

Start date: Dec 1, 2012, End date: Nov 30, 2016,

...ent to enhance the environmental performance and energy efficiency of their fleets. Alternative fuels, such as CNG and hybrid buses, and the increased use of electromobility in public transport and car sharing schemes will help to accelerate the introduction of clean vehicles in the European market. Venturing in new technology and mobility options as well as promoting new life styles will increase ...
Read Project

 27

 FINISHED 

Moderní technologie - naše budoucnost

Start date: Jun 1, 2015, End date: May 31, 2016,

Střední průmyslová škola Přerov thanks to Erasmus+ project sent two groups of students to Hungary for three weeks. These groups contained students of 2nd, 3rd and 4th year of studying. Working language of both internships was English. The participants got to know everyday English but also special terms from their field of studying. The participants got new proffessional skills and they also got to ...
Read Project

 10

 FINISHED 

Moderní technologie ve strojírenství a automatizaci

Start date: Jun 1, 2015, End date: May 31, 2016,

Střední průmyslová škola Zlín sent for 3-weeks long internship students of mechanical engineering and electrical engineering. 8 students of engineering traveled to Budapest in March/April 2017. 7 students of electrical engineering traveled in April 2017 to our foreign partners to Vienna. The aim of the project was scheduled to start organizing work placements abroad just for the best students of ...
Read Project

 8

 FINISHED 

Agricultural Entrepreneurship Training

Start date: Jun 1, 2014, End date: May 31, 2015,

...embers of the National VET Consortium and learners) include: recognition of the learning outcomes; reporting; dissemination of project results; monitoring and evaluation. Methodology used in carrying out the project After the selection of students and accompany persons, the 3 groups of students will be defined. The mobility will take place in various places in Portugal (mainly in the city of Brag ...
Read Project

 9

 FINISHED 
The aims of the Robert Bosch GmbH are based on the written and for all staffs generally valid so called "house of orientation" that describes the values of our enterprise. Beneath many others, the value of "cultural variety" as well as the core competencies "being globally present" and "personal development" have main importance as a base of our daily actions. Moreover the Robert Bosch GmbH estab ...
Read Project

 12

 FINISHED 
According to Global Industry Analysis Inc., refrigerated transportation world market will reach 5 billion € by 2015. Increasing awareness about food safety, consumer spending on high value perishable goods and replacement of refrigerated vehicles are driving the growth in refrigerated transportation market. Approximately 650.000 refrigerated road vehicles are currently in use within the EU.The in ...
Read Project

 6

 FINISHED 
General goal of projectActive use and conservation of genetic diversity of selected forest tree species to provide flexibilitywith respect to sustainable forest management and adaptation strategies for climate change. Establishactive and efficient networks that can develop and strengthen the cooperation in the area.Subproject 1: Evolutionary genetic pockets for broadleaved tree species: Establish ...
Read Project

 1

 FINISHED 
Description Optimal energy consumption and recovery for electric vehiclesA central goal of OpEneR is the investigation of an innovative and highly efficient overall energy manager that uses information from underlying subsystems to generate optimal driving and operation strategies. The strategies will vary from time optimised up to range ...
Read Project

 6

 FINISHED 

Pan-European coordination action on CO2 Geological Storage (CGS EUROPE)

Start date: Nov 1, 2010, End date: Oct 31, 2013,

The EU has made significant progress in CCS as a bridging technology for combating climate change, but this must now accelerate and be spread evenly throughout EU Member States and Associated Countries. In this context, CO2GeoNet, CO2NET EAST and ENeRG are joining forces, pooling their expertise and building on their Networking experience to form CGS Europe, a unique concerted European reference p ...
Read Project

 26

 FINISHED 

City multi-Role Optimized Vehicle (CITY MOVE)

Start date: Jan 1, 2010, End date: Mar 31, 2013,

"The delivery of freight in urban areas is based on general purpose commercial vehicles, not dedicated to a mission in a very specific scenario like urban areas. This is particularly true for medium vehicles (7,5-12 tons) that are however widely used in towns. CITY MOVE aims to develop a new concept for urban delivery vehicles, a real breakthrough from the actual vehicle platforms, using the lates ...
Read Project

 15

 FINISHED 

Automotive Cluster EMR 2012 (Automotive Cluster)

Start date: Jun 30, 2009, End date: Mar 30, 2013,

...ronnement automobile international de premier choix.• Conserver l´emploi dans la région.• Renforcer la perception et l´attrait de l´EMR comme région offrant de multiples carrières (visualisation des carrières, amélioration du recrutement des diplômés).• Augmenter la compétitivité et renforcer l´économie du secteur industriel (créer des centres de compétence et des fournisseurs virtuels de systèmes ...
Read Project

 7

 FINISHED 
The recent EU Commission paper on the establishment of a “Primary European Rail Freight Network” is the confirmation that Europe wants to develop a long term freight sustainable mobility.Infrastructure investments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the ...
Read Project

 23

 FINISHED 
RENAISSANCE aims to develop a valid, reliable and integrated package of access and mobility measures for historic cities. These will make possible the rediscovery, preservation and enhancement of historic cities in Europe, together with the sustainable development of the local economy, to the benefit of visitors, residents and local business alike. RENAISSANCE brings together a group of historic/t ...
Read Project

 30

 FINISHED 

Vehicle Independent Electric Transmission Architectures (VIETA)

Start date: Sep 1, 2009, End date: Aug 31, 2012,

...nt and the competitiveness of many other industrial sectors This project, involving two SMEs and one University, concerns a rapid development of a European capability in electric drivetrains for low-carbon vehicles, with focus on urban electric vehicles and commercial vehicles, in order to meet the urgent needs of a rapidly growing market, in particular in London and other European cities. The p ...
Read Project

 3

 FINISHED 
Since archaeological research started, a large number of Roman Limes sites were excavated, recorded and partly preserved. They form the single largest cultural heritage monument across Europe from Scotland to the Black Sea. In 2005 a newly created World Heritage Site “Frontiers of the Roman Empire” was set up as a serial phased UNESCO Site; this implicates that individual countries sharing a secti ...
Read Project

 7

 FINISHED 

AutoNet.eu (AutomotiveNET.eu)

Start date: Jun 30, 2005, End date: Jun 29, 2008,

Ziel des Projekts war es, neue Innovationsimpulse für die Automobilindustriezu schaffen. Hierzu wollten die Partner die Zusammenarbeit zwischen denAutomobilunternehmen und den Bildungs- und Forschungseinrichtungenweiter intensivieren. Die Projektaktivitäten konzentrierten sich auf die folgendenHauptthemen: Wissen und Kompetenzen, Schulung, Infrastruktur sowieForschung und Entwicklung. ...
Read Project

 8

 FINISHED 

The new coolant technologies for metalworking (Cool Tech)

Start date: Jan 1, 2001, End date: Dec 31, 2003,

...al problem related to the industrial lubricants by developing two applications. The beneficiary has developed a dry method in which the pieces to be worked are cooled and lubricated with a mist of carbon dioxide and vegetable oil. This application should result in that the waste will be easier to treat and dispose compared to the existing c ooling methods. In the other application an environment ...
Read Project

 10

 FINISHED 
Ce projet sinscrit dans le cadre de la mesure «pôles de compétences à vocation régionale » du programme INTERREG III B et prévoit une coopération entre La Réunion et les Comores. La mission du Conseil de lAgriculture de La Réunion, a été sollicitée par le Conseil Régional en vue deffectuer une expertise sur lagriculture des Comores, son organisation sa problématique de développement et ses attente ...
Read Project

 1

 FINISHED 
A new type of manager : The project has developed a curriculum specifically for the training of prototyping managers. After establishing training needs and a new profile, cross-border partnerships were set up and a course which can be partially integrated into existing courses was developed. This project started in 2002 and lasted 18 months.
Read Project

 12

 FINISHED 
The PACE project will develop guidelines and supporting materials for the development and recognition of partial certification, to support those with minimum levels of education in improving their position within the labour market, and to potentially provide a gateway to lifelong learning opportunity. The project expects to benefit the long-term unemployed, women-returnees, migrants and persons wi ...
Read Project

 8

 FINISHED 
In line with the Dutch Government's 'employability agenda', this project will set up an international pilot programme to assess and certify key competencies for the lower levels of vocational work. Led by a consortium of Dutch vocational training organisations, the project will interview companies in the partner countries, to analyse the required competence structure of trade union representative ...
Read Project

 25

 FINISHED 
The Cyberlab project will provide laboratory training between different sites in Europe using video-conferencing techniques. As advanced laboratory equipment is expensive and accessible only to a select group of students/trainees, and as travel to and research at specialist laboratories is both expensive and time-consuming, the Cyberlab project addresses a real need for distance laboratory trainin ...
Read Project

 9

 FINISHED 
E-LEARNING AUTOCLUSTER : The project aims at promoting synergies among training programmes in the automotive sector in order to improve e-learning modules within automotive companies. E-LEARNING AUTOCLUSTER provides coordination of training programmes for better dissemination of best practices and sharing of results. Activities such as the launch of the website, delivering of reports and analysis ...
Read Project

 18

 FINISHED 
In a high-tech, knowledge based economy, new competences of working people are required, but the VET sector is not yet responding in full measure. There are also a lack of innovation in the labour and training market. This project aims to produce new innovative certificates and training programmes for the IT sector adapted to the employers demand. The target groups are young and adult learners in ...
Read Project

 10

 FINISHED 
The aim of the ELSY project is to produce English language (EN) multimedia training tools which will enable people who have few qualifications to acquire the basic vocabulary needed to work in an airport, whatever their working language (FR, ES, IT or DE), so as to make it easier for them to find work and to keep it.The multimedia training tools produced will focus on four specific trades: runway ...
Read Project

 29