Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

... will be developed. An education and training curriculum related to the developed procedures, best practices and methods will be designed and progressed to implementation.Underpinning the above aims, research will be carried out to develop novel methodologies to enable traditional forensic science (DNA, fingerprint and electronic devices) to be carried out on CBRN contaminated exhibits and analyti ...
Read Project

 20

 FINISHED 
...n to achieve the project objective has been structured into six activities (A1 - A6). A validation analysis will be performed in A1 by surveying 100 stakeholders from FDMP industries, technological research institutes, VET centres, and academia. On the basis of the analysis, the learning programmes guidelines will be produced. These documents will be used in A2 to select potential participants for ...
Read Project

 5

 FINISHED 

Millenium Classrooms in the Lifelong Learning

Start date: Dec 31, 2015, End date: Dec 30, 2016,

The project will be in partnership with Italy, Malta and Turkey. Within the scope of this project, 11 trainers working within Bartın University Continuing Education and Research Center will be going to Rome and Malta for 5 days each in 2015 to attend "Flipped Classroom in the Lifelong Learning" and "Empowerment in ICT skills - Making Use of Technology Tools" Training Programmes. The emergence of ...
Read Project

 3

 FINISHED 
...t they've learned on fieldtrips combined with targeted lectures and activities. At the end of the program will be held a conference where students will be able to present their skills through research activity. Conference participants will be scientists from universities, public agencies, companies operating in the industry, research institutions, etc. The conference aims to bring together student ...
Read Project

 4

 FINISHED 
...pabilities in the Baltic-Nordic region. Project integrates different competencies that come from different countries in the region. This collaborative network will serve as a source for education and research projects among the HEIs. One of the key results of this network will be the development of interdisciplinary curricula in the area of risk and security governance. This curricula will be base ...
Read Project

 6

 FINISHED 
...F competences in outcome-based learning are of high importance for both education and employment sectors. 2. This project will specifically benefit educators and students by providing them with a research-based online tool that will support the exchange of information on learning outcomes, referring to a graduate’s knowledge, skills and e-CF competence upon completion of the Master of Science in S ...
Read Project

 6

 FINISHED 

Science and Mathematics Advanced Research for good Teaching

Start date: Sep 1, 2014, End date: Oct 31, 2016,

The SMART (Science and Mathematics Advanced Research for good Teaching) Project is proposed by the "Carlo Anti" School Institution in cooperation with an international partnership composed of other vocational schools, some universities and representatives of the world of work. The aims of the project are: - to improve the professional competences and to support innovation in the teachers' system ...
Read Project

 10

 FINISHED 
...use crop sustainable development, it is necessary to adopt techniques and technologies adapted to the protection of natural environment and to the sustainability of agricultural ecosystems, for which research and education are needed. For this reason we submit the project on “Modern Greenhouse Construction and Integrated Management of Greenhouse Crops”, in order to be educated on the developm ...
Read Project

 3

 FINISHED 
...to their narrow orientations and focus on just one area, do not provide the possibility of a comprehensive insight into the installations and processes that require knowledge of mechatronics. Company research has shown that there is a great interest on the side of economy in additional vocational training for the staff, who have already completed their formal studies in mechanical or electrical en ...
Read Project

 5

 FINISHED 
...and Higher Education institutes, SMEs and economic development agencies) and Public Sector bodies (Police, harbour agencies, fire-fighting & emergency departments). The partners will work together in research and development activities, setting up a joint prototype UAV and performing joint testing and demonstrations. The main applications and scenarios for unmanned aircraft will be for search and ...
Read Project

 12

 FINISHED 
...cooperation and development of testing infrastructure for interactive digital television and IPTV technology and services. Results of the project were achieved by using awarded methodology and tools (research, laboratory testing, pilot samples, training seminars, monitoring and meetings). During the implementation period following results have been obtained: Research & Development Centre has been ...
Read Project

 5

 FINISHED 
Project overall goal is to improve research quality and effectiveness as well as accessibility of education and training systems by promoting use of multimedia and interactive television. Implementation of project is planned in Kurzeme and Kaunas regions, where following problems are identified: 1. ICT (Information and Communication Technologies) Industry consider that there is no unified research ...
Read Project

 3

 FINISHED 
...gy Sources of the BAS offers respectable knowledge and experience in implementing various solar technologies. GIS Foundation – Transfer Center helps the process of technology transfer of compatible research- development products, know-how, consultancy and expertise with a focus on SMEs. ...
Read Project

 1

 FINISHED 

Directly Modulated Lasers on Silicon (DIMENSION)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

DIMENSION establishes a truly integrated electro-optical platform, extending the silicon (Bi)CMOS and silicon photonics platform with III-V photonic functionality. The III-V integration concept is fully CMOS compatible and offers fundamental advantages compared to state-of-the art integration approaches. After bonding and growing ultra-thin III-V structures onto the silicon front-end-of-line, the ...
Read Project

 6

 FINISHED 
...fort of leading experts in manufacturing, industrial automation and FI technologies towards the smooth and wider adoption of virtualized factory automation solutions based on FI technologies. It will research a novel factory automation platform based on edge computing architectures and IoT/CPS technologies. FAR-EDGE will provide a reference implementation of emerging standards-based solutions for ...
Read Project

 12

 FINISHED 

Games Of Active Life (GOAL)

Start date: Nov 1, 2016, End date: Oct 31, 2018,

The GOAL project provides a platform that fosters an ecosystem of games and applications that helps people stay motivated to lead socially engaged, physically and cognitively active lifestyles. The platform will benefit both players and third-party game developers. Players get to play their favourite games while at the same time working on a social and active lifestyle. Where certain GOAL games or ...
Read Project

 4

 FINISHED 

Application Centric IP/Optical Network Orchestration (ACINO)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The Internet has evolved into a three layer structure: at the top layer sit the applications generating traffic that is groomed at the IP and/or OTN layers and finally transported at the optical layer. Specific application needs, such as latency or protection requirements, are seldom guaranteed, because they are usually implicit and even when they are not, the need of the grooming layer to map lar ...
Read Project

 6

 FINISHED 
The aim of SANSA project is to boost the performance of mobile wireless backhaul networks in terms of capacity and resilience while assuring an efficient use of the spectrum. Recently, a global mobile traffic increase of 11-fold between 2013 and 2018 was predicted, so novel solutions are required to avoid backhaul becoming the bottle neck of future mobile networks. The solution envisaged in SANSA ...
Read Project

 8

 FINISHED 
...d blueprint experimental infrastructure (tools, techniques and best practices) enabling testbed operators to interconnect their facilities in an interoperable way, while at the same time facilitating researchers in deploying integrated experiments, which seamlessly transcend the boundaries of multiple IoT platforms. FIESTA will be validated and evaluated based on the interconnection of four testb ...
Read Project

 15

 FINISHED 

Virtual Open Incubation Ecosystem (VOICE)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

... ecosystem. VOICE will enable individuals that aspire to become entrepreneurs to tap into the collective intelligence of the crowd and turn their entrepreneurial interest or need into a collaborative research project that will result into a prototype and to a successful "crowd-venture". One of the core competitive advantages of the proposed incubation model relates to the benefits that can be deri ...
Read Project

 9

 FINISHED 

Objective Control for TAlker VErification (OCTAVE)

Start date: Jun 1, 2015, End date: May 31, 2017,

Industry needs alternatives to textual passwords for access control. While tokens can still be stolen or transferred to other persons, biometrics technology can provide reliable, cost-effective and user-friendly solutions.The proliferation of smart services calls for unsupervised authentication at a distance. Being natural, non-intrusive and readily compatible with smart and mobile devices, automa ...
Read Project

 13

 FINISHED 
...se the mode/core interference as well as new network planning algorithms and control plane extensions that are enhanced with the space dimension. The INSPACE consortium forms a strong industry driven research team targeting not only the demonstration of the new network concept and its ability to meet the challenges of delivering exponentially growing content over the next twenty years, but also th ...
Read Project

 9

 FINISHED 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Read Project

 8

 FINISHED 

eWall for Active Long Living (eWALL)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

...d includes all the ICT needed to enable a number of services for the senior citizen to cover major challenges in Active and Healthy Ageing. The project will carry out high-risk and multi-disciplinary research and will have a large-scale demonstrator exercise for validating the wall concept with solid clinical evidence. This will include both technical, user and legal evaluation, to measure the imp ...
Read Project

 14

 FINISHED 
...ross multiple IoT architectures, platforms and business contexts. Specifically, VITAL will provide platform and business context agnostic access to Internet-Connected-Objects (ICO). Moreover, it will research virtualized filtering, complex event processing (CEP) and business process management mechanisms, which will be operational over a variety of IoT architectures/ecosystems. The mechanisms will ...
Read Project

 10

 FINISHED 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Read Project

 14

 FINISHED 
The COCONUT proposal aims at the definition, study and realization of a new fully scalable optical access network significantly extending the network dimensions in terms of bandwidth utilization, reach and number of accommodated users. The envisioned access network evolves from the almost-commercial WDM-PON architecture to the realisation of the Ultra-Dense WDM solutions, opening the way to the "w ...
Read Project

 8

 FINISHED 
"Socioeconomic activities such as supply and distribution of gas or electricity and the Infrastructures that generate it or transport it (power plants, gas pipes), are vital to the day-to-day functioning of any country. Due to several factors, the social and financial European situation, or supply constraints, energy & utilities have become, over the last years, a prominent issue in Europe.In this ...
Read Project

 15

 FINISHED 
...tical networking is widely proposed today by major vendors and operators as the solution that offers smooth system upgradability towards Tb/s capacities and optimized use of network resources. Latest research and development efforts proposed a variety of multi-carrier signal transmission methods with significantly increased spectral efficiency, (compared to legacy WDM), allowing the transport of u ...
Read Project

 10

 FINISHED 
CONTENT will focus on developing next generation high capacity end-to-end, heterogeneous infrastructure technologies to support the network of the future. The model proposed will be based on the Infrastructure as a Service (IaaS) paradigm and provide a technology platform interconnecting geographically distributed IT resources that can support a variety of Cloud services. This platform will includ ...
Read Project

 7

 FINISHED 
The NAVOLCHI project explores, develops and demonstrates a novel nano-scale plasmonic chip-to-chip and system-in-package interconnection platform to overcome the bandwidth, foot-print and power consumption limitations of todays electrical and optical interconnect solutions. The technology exploits the ultra-compact dimensions and fast electronic interaction times offered by surface plasmon polarit ...
Read Project

 8

 FINISHED 
"The main goal of PROACTIVE is to research a holistic citizen-friendly multi sensor fusion and intelligent reasoning framework enabling the prediction, detection, understanding and efficient response to terrorist interests, goals and courses of actions in an urban environment. To this end, PROACTIVE will rely on the fusion of both static knowledge (i.e. intelligence information) and dynamic inform ...
Read Project

 10

 FINISHED 
...vices for promoting integration and cultural diversity in Europe. Mobile – everywhere/everytime - persuasive assistance is crucial for more efficient and sustainable support of immigrants. MASELTOV researches and develops novel ICT instruments in an interdisciplinary consortium with the key objective to facilitate and foster local community building, raising consciousness and knowledge for the bri ...
Read Project

 17

 FINISHED 
...nd AspireRfid projects) towards enabling a new range of open large scale intelligent IoT (internet-of-things) applications according to a cloud computing delivery model. To this end, the project will research and provide an open source middleware framework enabling the dynamic formulation of self-managing cloud environments for IoT applications. The OpenIoT middleware framework will therefore serv ...
Read Project

 9

 FINISHED 

Search engine for MultimediA enviRonment generated contenT (SMART)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

The Future Internet will include a large number of internet-connected sensors (including cameras and microphone arrays), which provide opportunities for searching and analyzing large amounts of multimedia data from the physical world, while also integrating them into added-value applications. Despite the emergence of techniques for searching physical world multimedia (including the proliferation o ...
Read Project

 9

 FINISHED 
High spectral efficiency is the holy grail of wireless networks due to the well-known scarcity of radio spectrum. The successive introduction of advanced communication techniques enabled by the massive increases in processing power over the last few decades has enabled a progressive rise in link spectral efficiency, which in emerging systems seems to be approaching its limits.It is becoming increa ...
Read Project

 8

 FINISHED 

Smart Management for Sustainable Human Environment (SmartEN)

Start date: Dec 1, 2009, End date: Nov 30, 2013,

...re coupled with ageing infrastructure systems, continuously growing and changing demands on the built and natural environments as well as limited financial and depleting natural resources. Until now, research has been focused on the development of proactive risk-based approaches for civil infrastructure reliability and management with benefits in improved performance, safety and cost. However, the ...
Read Project

 12

 FINISHED 

Cognitive Heterogeneous Reconfigurable Optical Network (CHRON)

Start date: Jul 1, 2010, End date: Sep 30, 2013,

The CHRON project addresses the challenge of controlling and managing the next generation of heterogeneous optical networks supporting the Future Internet. Such networks will be of a highly heterogeneous nature, ranging from a wide variety of classes of services with different requirements, to wide physical layer diversity in optical transmission techniques and optical switching paradigms. The CHR ...
Read Project

 8

 FINISHED 
ACCORDANCE introduces a novel ultra high capacity (even reaching the 100Gbps regime) extended reach optical access network architecture based on OFDMA (Orthogonal Frequency Division Multiple Access) technology/protocols, implemented through the proper mix of state-of-the-art photonics and electronics. Such architecture is not only intended to offer improved performance compared to evolving TDMA-PO ...
Read Project

 10

 FINISHED 
In the SOFI project, new active optical waveguides and integrated optoelectronic circuits based on a novel silicon-organic hybrid technology are introduced. The technology is based on the low-cost CMOS process technology for fabrication of the optical waveguides - allowing for the convergence of electronics with optics. It is complemented by an organic layer that brings in new functionalities so f ...
Read Project

 8