Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

European Transport Network Alliance 2020 (ETNA 2020)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

ETNA2020 is a 48-month Coordination and Support Action with the overall aim of facilitating trans-national co-operation among NCPs for ‘Smart, Green and Integrated Transport’, identifying and sharing good practices, and raising the general standard of the support to programme applicants across the EU and globally. To reach the objective above, the project will develop five main activity axes, corr ...
Read Project

 16

 FINISHED 

Robust Internal Thermal Insulation of Historic Buildings (RIBuild)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

RIBuild will strengthen the knowledge on how and under what conditions internal thermal insulation is to be implemented in historic buildings, without compromising their architectural and cultural values, with an acceptable safety level against deterioration and collapse of heavy external wall structures. The general objective of RIBuild is to develop effective, comprehensive decision guidelines t ...
Read Project

 10

 FINISHED 

European Network for Academic Integrity

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Our project is focused on new or updated innovative methods under so called academic integrity. You can imagine a whole spectrum of preventive measures how to fight with plagiarism and other bad habits not only in academic world effectively. Most of the project partners are already in very close cooperation in the field of academic integrity. There have been efforts to communicate on a common plat ...
Read Project

 12

 FINISHED 
IOT-OPEN.EU project is aimed at bridging the gap between what higher education offers and what the European labor market needs in the field of Internet of Things - one of the most fast growing and promising areas in the world of information and communication technologies. The European Commission has recently announced the Internet of Things to be one of its flagships for growth and for the Digital ...
Read Project

 6

 FINISHED 

Ceramics and its dimensions

Start date: Nov 1, 2014, End date: Nov 30, 2018,

Our cultural heritage leads to tomorrow’s creativity: Ceramics and its dimensionsIn ceramics no development can be looked upon as national, it is common European heritage. Generating routes from Past to Future, the project brings together 16 partners from 11 countries: museums, universities, research institutes, companies: Documenting the past it shows the scope in usage of ceramics. Past and Pres ...
Read Project

 17

 FINISHED 
Objective is to develop and to demonstrate technologies and components for prefabricated modular renovation elements in five geo-clusters in Europe. This includes prefabricated durable, innovative, modular composed building envelope elements for the total building envelop for the renovation market, including the prefab integration of multifunctional components for climate control, energy saving, ...
Read Project

 18

 FINISHED 
Striving to reform Belarus high education system according to the Bologna process, the Ministry of Education of Belarus set the target for HEIs to reform curricula from the existing system “5 plus 1” to the system “4 plus 2”, which should comply with the Bologna system principles. However, decreasing a training period from 5 to 4 years for physics specialists causes a certain risk providing an imp ...
Read Project

 10

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
RealValue aims to demonstrate how local small-scale energy storage, optimised with advanced ICT, could bring benefits to market participants throughout the EU. Smart Electric Thermal Storage (SETS) will be deployed in physical demonstration trials in 1250 homes in Germany, Latvia and Ireland but the analysis will also consider other storage technologies and energy vectors, including integration wi ...
Read Project

 12

 FINISHED 

PhD on Innovation Pathways for TES (INPATH-TES)

Start date: May 1, 2015, End date: Apr 30, 2018,

Following the EC SET-Plan Education and Training Roadmap, the concept of this proposal is to develop a joint PhD programme between universities and research centres, on the topic of Thermal Energy Storage (TES). The goal of INPATH-TES is to create a network of universities and research institutes to implement a joint PhD programme on TES technologies. The final result of such a network is to educa ...
Read Project

 22

 FINISHED 

Security Research NCP Network 3 (SEREN 3)

Start date: May 1, 2015, End date: Apr 30, 2018,

SEREN3 is a 36-month Coordination and Support Action with the overall aim of facilitating trans-national co-operation among NCPs for Secure Societies, identifying and sharing good practices, and raising the general standard of the support to programme applicants across the EU, Associated and Third countries. To reach the objective above, the project will develop three main activity axes, correspon ...
Read Project

 18

 FINISHED 
Deep renovation – the idea of capturing the full economic energy efficiency potential of existing buildings with focus on building envelopes – leads to remarkable energy savings. As nearly all of Latvia’s stock of multifamily residential buildings continues to rapidly deteriorate due to harsh weather conditions and lack of proper maintenance, the idea is attractive.Realizing this potential require ...
Read Project

 7

 FINISHED 

I R I S

Start date: Feb 1, 2016, End date: Jan 31, 2018,

J.The IRIS -Project came to exist out of the desire of Tabora vzw and its partners to set an international network for exchange and cooperation in order to strengthen, broaden and deepen their knowledge of, insight in and application of methodologies that allow them to empower, educate and activate their youngsters in a more effective way so that they can discover, develop and deploy their skills ...
Read Project

 7

 FINISHED 
National Contact Points (NCPs) for Space provide support on Space funding under EU Framework programmes. In 2007 under FP7 the EU started funding an NCP Space network which was named COSMOS. This enabled the NCPs to benefit from each other’s experience and thus raise the level of the overall quality of their services. Additional services were established like a joint website and news service provi ...
Read Project

 24

 FINISHED 
The next generation calcium phosphates demand refined processing routes for capturing the full potential of this elite class of materials. Calcium phosphates are unique with their potential to accept replacement ions in the structure, be processed through intermediate phases, and modify their crystal structure. This project will a) investigate the formation of high temperature processing in a radi ...
Read Project

 6

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Colibri will contribute to the Modernisation of European Higher Education by developing new and innovative teaching approaches, increase labour market relevance of education, and promote the take-up of innovative practices in education. Colibri will focus specifically on personalised learning, collaborative learning, and use of ICT. Moreover, Colibri is based on strengthening the link between comp ...
Read Project

 10

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
"COALINE will develop a in-line clean one-stage process, which is free of VOCs and small particles emissions, able to produce properly coated composite pultruded profiles by means of the development of the sensing technology, advanced mould design and microwave aided curing needed to foster an improved composite – coating adhesion with a reduced labor and process cost. COALINE profiles will be joi ...
Read Project

 14

 FINISHED 
EPICES (European Platform for Innovation and Collaboration between Engineer Students) will allow developing a European collaborative at a distance project-based learning framework and method, based on already existing and still developing technical platforms, i.e. collaborative and engineering tools. A special focus will be made on teachers' role and students' coaching, from the analysis of what a ...
Read Project

 8

 FINISHED 

Innovative Strategic Partnership for European Higher Education

Start date: Jan 1, 2015, End date: Dec 31, 2016,

The overall objective of the project is to support the development of an innovative pathway by improving long-term strategic collaboration between Higher Education Institutions (hereinafter referred to as HEIs) and enterprises and enhancing the development of sustainable learning advancements in HEIs. The specific objectives of the project are: - To support and implement models for effective and p ...
Read Project

 5

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Coaches of SMEs: 5POINTS Trainings

Start date: Sep 1, 2014, End date: Aug 31, 2016,

Numerical results obtained from both European Committee reports and national reports show the importance of SMEs for the economy of the country. Giving coaching trainings to these establishments which are so important for national development is vital in order to make them to contribute more to the country economy. After the financial crisis in Europe and carrying out examinations on SMEs, it is a ...
Read Project

 9

 FINISHED 

Capability as a Service in digital enterprises (CaaS)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

An enterprises's capabilities is one factor that often determines competitive advantage and provides business value. Capabilities refer to essential functions of the enterprise that link business goals to business processes, resources and actors. These capabilities are mapped onto IT solutions, such as software services, that are delivered to customers. Aligning an enterprise's capabilities to it ...
Read Project

 11

 FINISHED 

Automation and Robotics for EUropean Sustainabile manufacturing (AREUS)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

European Factories of the Future will have to be smart and green:• SMART: high performance, reconfigurable, adaptive and evolving factories based on robotic technologies ,• GREEN: reduced ecological footprint through a more efficient use, at factory level, of material and energy resources.Industrial Robotics is the strategic technology needed to keep the European Manufacturing leading edge, unfort ...
Read Project

 12

 FINISHED 
Pipeline systems have supreme significance for an effective functioning of industry providing Eastern and Western European markets with energy resources: crude oil, natural gas and liquid petroleum products. Taking into account long life of pipeline networks and situation, when over 20% of large-diameter pipelines are with an exhausted lifetime, an important task at the present time becomes an ens ...
Read Project

 4

 FINISHED 
COOLSWEEP comprises 5 established research driven triple helix clusters, one cluster under development and a specialist cluster analysis organisation. The clusters have recognised that the newly emerging field of waste-to-energy urgently requires the establishment of a coordinated “smart specialisation strategy‟.The proposed work will compare and contrast the 6 regions to determine the global pict ...
Read Project

 11

 FINISHED 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Read Project

 21

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The eINTERASIA project is aimed at supporting an international cooperation with Developing Economies of Central Asia by creating an innovative ICT Transfer Concept and business modelfor adaptation, dissemination and local exploitation of EU research results.Geographical region of Central Asia which is of great importance to the EU as a bridge to China, Afganistan, Vietnam and the Middle East is s ...
Read Project

 9

 FINISHED 

Inovative Solutions for Railway Noise Management (ISRNM)

Start date: Aug 1, 2012, End date: Jul 31, 2015,

Background Railways are a significant cause of environmental noise pollution in Latvia and further afield. Increasing volumes of rail freight traffic and urbanisation are both having a negative impact. Moreover, surveys indicate that railways are the third most bothersome noise source and a cause of acoustic discomfort. Considering that cargo and passenge ...
Read Project

 3

 FINISHED 
"European Space industry demand for lighter and cheaper launcher transport systems. The proposed project DESICOS contributes to these aims by a new design approach for imperfection sensitive composite launcher structures, exploiting the worst imperfection idea efficiently: the Single Perturbation Load Approach. Currently, imperfection sensitive shell structures prone to buckling are designed accor ...
Read Project

 13

 FINISHED 
STEP-UP - brings together excellence on energy planning from Glasgow; Ghent; Riga; and Gothenburg – 4 ambitious, northern European, historic, port cities together with their industrial and research partners.The initiative is supported at the highest political level in all 4 cities – and city leaders will be active in the project throughout its life, ensuring it delivers its objectives, and has cl ...
Read Project

 12

 FINISHED 
The Biowalk4Biofuels Project aims to develop an alternative and innovative system for biowaste energy recovery and use of GHG emissions to produce biofuels, using macroalgae as a catalyser, in a multidisciplinary approach. The objectives of the project are: production of a cost-efficient biogas without using cereal crops; optimise the production of biogas per amount of biowaste and CO2 used, with ...
Read Project

 12

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 
In June 2008 the Space National Contact Points (NCPs) from 33 EU member states and FP7 associated countries started COSMOS, the “Cooperation Of Space NCPs as a Means to Optimise Services”. NCP networks had been established in other themes already, like IDEALIST, and proved a suitable instrument to interlink according NCPs. This led to added benefit e. g. through new services like specific partner ...
Read Project

 26

 FINISHED 

Led-based intelligent street lighting for energy saving (LITES)

Start date: Dec 1, 2009, End date: Nov 30, 2014,

The main objective of the LITES project is to demonstrate in real life experimentation that intelligent street lighting using solid-state lights LED drastically reduces energy consumption. The lighting service delivered is compliant with road classes CE2-CE5, S- and A- according to the standard of EN13201. That means that our device can be installed in secondary street, commercial access, allotmen ...
Read Project

 6