Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Improve Resilience of Industry Sector (LIFE IRIS)

Start date: Sep 15, 2015, End date: Mar 15, 2019,

...in, no matter where along the supply chain the extreme weather events occur. Objectives The main objective of the LIFE IRIS project is to support enterprises in the Emilia-Romagna region, particular SMEs, in their efforts to become more climate-resilient; and to test the effectiveness of the adaptation measures applied t ...
Read Project

 7

 FINISHED 

Implementation of River Information Services in Europe (IRIS Europe II)

Start date: Dec 31, 2008, End date: Dec 30, 2011,

IRIS Europe II as international multi-beneficiary project contributes significantly to fulfilling the objectives as laid down in Priority Area 1a of the EU Strategy for the Danube Region - to improve mobility and multimodality on inland waterways.Besides partners from the Rhine-Main-Scheldt region, all Danube countries are involved either as fully financed or as cooperation partners within IRIS Eu ...
Read Project

 1

 FINISHED 

Implementation of River Information Services in Europe (IRIS Europe 3)

Start date: Dec 31, 2011, End date: Dec 30, 2014,

IRIS Europe 3 as international multi-beneficiary project contributes significantly to fulfilling the objectives as laid down in Priority Area 1a of the EU Strategy for the Danube Region - to improve mobility and multimodality on inland waterways.All Danube countries are involved either as fully financed or as cooperation partners within IRIS Europe 3. The beneficiaries of IRIS Europe 3 are the Eur ...
Read Project

 1

 FINISHED 
...more CO2-efficient, but not necessarily practical for industrial use. Examples are bioesters, which are produced by chemical reactions between vegetable/animal oils and alcohol (methanol). Rhodiasolv IRIS is a new alternative produced from the transformation of waste from polyamide-66 (nylon). This safe and easily recycled alternative has been registered and used on a pilot scale since 2008. By av ...
Read Project

 1

 FINISHED 

IRIS Feasibility Study – Phase 1 (IRIS-1)

Start date: May 1, 2015, End date: Oct 31, 2015,

The IRIS Feasibility Study – Phase 1 (IRIS-1) Project aims to assess the overall feasibility of the introduction of the Intensive-care Risk prediction and Identification System (IRIS), an innovative real-time patient monitoring and personalised risk prediction and identification system, into the healthcare sector. Thousands of surgery patients in Europe and worldwide die each year due to complicat ...
Read Project

 1

 FINISHED 

Infrared imaging and sensing: the single-photon frontier (IRIS)

Start date: Jun 1, 2015, End date: Nov 30, 2019,

...uanta of light: single photons. At infrared wavelengths this is a formidable task due to the low photon energy, and commercial-off-the-shelf technologies fall far short of the required performance. IRIS will engineer revolutionary photon counting infrared imaging and sensing solutions, with unprecedented spectral range, efficiency, timing resolution and low noise. Using state-of-the-art materia ...
Read Project

 2

 FINISHED 

IRIS: Towards Natural Interaction and Communication (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"The overall goal of IRIS is to provide a natural interaction communication platform accessible and adapted for all users, particularly for people with speech impairments and elderly in indoor scenarios. Human-Computer interaction with this platform will adopt the principles of universal design and natural user interfaces such as speech, silent speech, gestures, tactile and haptic devices, pictogr ...
Read Project

 5

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Read Project

 8

 FINISHED 

Integrating Research in Interactive Storytelling (IRIS)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

...ed a leading role in the development of the field, and this creates a unique opportunity to strengthen its position even further by structuring some of its best actors within a Network of Excellence. IRIS (Integrating Research in Interactive Storytelling) aims at creating a virtual centre of excellence that will be able to achieve breakthroughs in the understanding of Interactive Storytelling and ...
Read Project

 11

 FINISHED 

Integrated European Industrial Risk Reduction System (IRIS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

...bligation to reconsider their risk and safety policies, having a more competitive industry and more risk informed and innovation accepting society in vision. Therefore the large collaborative project IRIS is proposed to identify, quantify and mitigate existing and emerging risks to create societal cost-benefits, to increase industrial safety and to reduce impact on human health and environment. Th ...
Read Project

 37

 FINISHED 

Initiatives Régionales, Innovations et Stratégies (IRIS-Europe)

Start date: Jun 30, 2005, End date: Dec 30, 2007,

The overall objective of IRIS-Europe is to improve the decision-making processes of local and regional authorities by applying efficient use of ICT systems to regional development policies. French regions have already carried out a similar project successfully under the IRIS initiative. As these challenges are increasingly Europe-wide in nature and scope, IRIS-Europe is extending this approach to ...
Read Project

 6

 FINISHED 

Interregional Innovation System (IRIS)

Start date: May 31, 2008, End date: Aug 30, 2012,

...h. Um versteckte Wirtschaftspotentiale zu fördern ist es notwendig, besonders im Bereich Innovation, gemeinsame Strategien zu erarbeiten und diese in Form von langfristigen Kooperationen umzusetzen.IRIS will durch die Integration der einzelnen regionalen Innovationssystemen die wirtschaftliche Kooperation zwischen Österreich und Ungarn verbessern.Es wird eine interregionale Wissensbasis erstellt, ...
Read Project

 9

 FINISHED 
"IRIS (Interest & Recruitment in Science) addresses the challenge that few young people (women in particular) choose education and career in science, technology and mathematics (STM). Women represent the greatest recruitment potential to STM; moreover, a higher participation from women may expand the ways of thinking and working within this area and contribute to gender equity. To understand and ...
Read Project

 6

 FINISHED 
The ´Iris´ project aims to foster employability and regional development in deprived rural areas by developing a vocational training programme in organic farming, a sector with an increasing need of qualified workers. This project is addressed to young and long-term unemployed people with low qualifications, and other disadvantaged groups coming from deprived rural areas. The project partners will ...
Read Project

 11

 FINISHED 
IRIS’s wider objective is to promote internationalization policies, practices, capacities and culture within Israeli public academic colleges, and thereby to improve the quality and innovation of teaching, learning and research in colleges and reduce the gap between the two tiers of Israel’s higher education system.The specific objectives are: (i) Development of a strategic plan for internationali ...
Read Project

 18

 FINISHED 

Iris Flagship Initiative

Start date: Sep 1, 2014, End date: Feb 29, 2016,

Iris Flagship Initiative (IFI) was a project funded by Erasmus +, KA1, coordinated by the association Wild Carpathia, developed in Sighisoara, Romania, consisting of 8 mobilities up to 10 months each in order to meet the need for young people to develop certain key skills useful later for access the labor market in the fields of art, culture and traditions and to offer them at the same time new in ...
Read Project

 4

 FINISHED 
The project IRIS 2015 is promoted by the Consortium VET represented by Cooperativa Mille Soli(Acerra – NA), Centro Scolastico Demetra (Nola –NA)Euroform RFS (Rende –CS)and IPSSAR K. Wojtyla (Castrovillari-CS)Direct beneficiaries of the project are 80 VET Learners. The intervention has been implements according to a specific sectorial approach.Thanks to the VET partners,it was possible to identify ...
Read Project

 13

 FINISHED 

Festival Arco Iris

Start date: May 1, 2016, End date: Aug 31, 2016,

IMAGINA- Alcobendas Youth, Childhood and Adolescence Service promotes and organizes training and information activities for young people aged from 14 to 35 years old and for children and teenagers aged from 4 to 15 years old all over the municipality.As part of our policy of opportunities for all and access to international programs in Europe, we are hosting European volunteers since more than 15 ...
Read Project

 4

 FINISHED 

ADVANCE IRIS RECOGNITION IN MOVE (AIRIMGO)

Start date: Jul 1, 2015, End date: Dec 31, 2015,

Critical infrastructure protection topic 7: SME instrument topic: “Protection of Urban soft targets and urban critical infrastructures. DRS-17-2014-1.The scope of this topic is focused to cover high throughput screening of people including the ability to screen them in reasonably real-time as people approach entrances to buildings or enter public transportation system. The objective of the project ...
Read Project

 1

 FINISHED 

ÖZGE CANLAR SOLMASIN

Start date: Dec 31, 2015, End date: Dec 30, 2016,

We would like to have 20 day Educational Course to overcome the violence to Women and girls with IRIS İN iTALY. Akçakent Adult Education Centre is a Public association that develop different courses and activities. Our activities have been based since a principle in theadult people of our town . It is a governmental institution .This institution is in charge of best practices for Adult educa ...
Read Project

 2

 FINISHED 

Physics of the Solar Chromosphere (CHROMPHYS)

Start date: Jan 1, 2012, End date: Dec 31, 2016,

...solar chromosphere by combining the development of sophisticated radiation-magnetohydrodynamic simulations with observations from the upcoming NASA SMEX mission Interface Region Imaging Spectrograph (IRIS).The enigmatic chromosphere is the transition between the solar surface and the eruptive outer solar atmosphere. The chromosphere harbours and constrains the mass and energy loading processes th ...
Read Project

 1

 FINISHED 

Flares throughout the solar atmosphere (FLARES)

Start date: May 15, 2014, End date: May 14, 2016,

...erstand the connections and interplay of different solar layers during flares. I propose to investigate the flare mechanisms with state-of-the-art methods by combining data from RHESSI, IBIS, Hinode, IRIS, and SDO. The combination of these data allows us to study the three-dimensional structure of the solar magnetic field and the free energy stored in the corona to estimate the potential for flare ...
Read Project

 1

 FINISHED 

All in – design your future through social commitment

Start date: Sep 1, 2014, End date: Aug 31, 2015,

The project "All In - ddesign your future through social commitment" was jointly implemented by the Iris Group (Georgia), Balkans, lets get up! (Serbia), and the START Foundation gGmbH (Germany), in a quest to reinforce the importance of civic engagement as an important medium for non-formal education of disadvantage young people. In so doing, the project aimed to improve the public perception and ...
Read Project

 3

 FINISHED 
...venia; visit of the “Natural History Museum” and “British Museum” in nov 2015 in London, UK , vistit of the Science Gallery Dublin and the Dublin Living Lab (Ireland) in nov 2015 Mag. Iris Ott, member of the department of exhibitions and education; Activities: ecsite-conference, jun 9th – jun 13th 2015 in Trento, Italy; Science&you Congress 2.-6. June, Nancy, France; workshop of the “Academy of ...
Read Project

 1

 FINISHED 

Restoring Active Blanket Bog in Ireland (Blanket bog)

Start date: Jul 1, 2002, End date: Dec 31, 2007,

...ed, suffered from ever-increasing grazing pressures. The result has been an extensive degradation and desiccation of the habitat. The tide however, recently began to turn. Coillte Teoranta (the Irish Forestry Board) for instance, set aside 15% of its landholding for biodiversity. This created a unique opportunity to reverse past damages and begin to restore key afforested bog areas. ...
Read Project

 1

 FINISHED 
...mation. Incorporated Smart Systems, including smart components (and in the future MNBS) often provide the key technical features for the competitiveness of products in these sectors.The objectives of IRISS are to hedge and extend competitive advantages of European industry in order to make Europe number one in the world in Smart Systems research and production. Therefore the CA focuses on improvem ...
Read Project

 16

 FINISHED 

Management and conservation of temporary ponds in Minorca (BASSES)

Start date: Sep 1, 2005, End date: Aug 31, 2009,

...nd’s calcareous rocky plateau. These ponds support vegetation communities with a high biodiversity, including some species endemic to the Balearic islands, such as Romulea assumptionis, from the iris family, and Polygonum romanum subsp. Balearicu, from the knotweed family. Objectives The aim of the project was to set u ...
Read Project

 1

 FINISHED 

Steirischer herbst festival gmbh

Start date: May 1, 2012,

Number of people targeted: * Internet: 10,000,000Written press: 136,114,733
Read Project

 1

 FINISHED 
...dden in tall vegetation, their presence only betrayed by their rasping call. Corncrakes nest and rear their young in tall grass or herbaceous vegetation, such as nettles, cow parsley or yellow flag (iris). Sometimes they will use standing crops of oats and barley in late summer, after the hay fields have been mown. The Corncrake (Crex crex) is a globally threatened species, classified as 'vulner ...
Read Project

 5

 FINISHED 

Norwegian Innovation Management Services (NORIMS)

Start date: Jul 1, 2014, End date: Dec 31, 2014,

...urope Network in 2014 ». This will build the foundation for the actions to be carried out in 2015-2021.The NORIMS project will have three partners with Innovation Norway being the coordinator and IRIS and NORUT as partners. All three institutions will be delivering both services: Innovation Specialist and Key Account Management. There will be seven experts from Innovation Norway (5), IRIS (1) and ...
Read Project

 1

 FINISHED 

FROM EDUCATION TO KNOWLEDGE

Start date: Dec 31, 2015, End date: Dec 30, 2016,

...ultancy Center 1 People Education Center 1Disability NGO's 1private rehabilitation centers,1 Provincial directoriate of family and social service Host partner is from Lecce İtaly. Itallian partner IRIS Institute is a training center that we worked in several projects. It is a trainnig center that gives trainings in Lecce Participants can be divided to 4 main categories: 1) Teachers and other pe ...
Read Project

 2

 FINISHED 
..., inducing a higher level of PEDF expression to inhibit neovascularization would be a viable therapeutic alternative. TargetAMD will subretinally transplant genetically modified, patient-derived, Iris Pigment Epithelial cells that overexpress PEDF to provide a long-lasting cure of AMD. Stable PEDF gene delivery will be based on the non-viral Sleeping Beauty transposon system, which combines the ef ...
Read Project

 16

 FINISHED 

Education and Volunteering for Support to immigration

Start date: Jan 4, 2016, End date: Apr 3, 2017,

This EVS project of 9 months (February-November 2016) will involve 2 spanish volunteers: Iris Bueno del Valle a 25 years old who has a degree in Science of Primary education, will do her volunteering in the Centro di Aggregazione Giovanile of Lunetta managed by Alce Nero. Her sending organisation is Asociacion Mentes Abiertas from Madrid. Patricia Nunez Baez, a 27 years old educator, will do her E ...
Read Project

 4

 FINISHED 

I R I S

Start date: Feb 1, 2016, End date: Jan 31, 2018,

J.The IRIS -Project came to exist out of the desire of Tabora vzw and its partners to set an international network for exchange and cooperation in order to strengthen, broaden and deepen their knowledge of, insight in and application of methodologies that allow them to empower, educate and activate their youngsters in a more effective way so that they can discover, develop and deploy their skills ...
Read Project

 7

 FINISHED 
O projecto ¡Mira!, aprovado no âmbito da 1ª Convocatória nasceu de uma constatação, a da probreza das trocas artísticas e culturais entre a França e a Espanha. As acções desenvolvidas durante a primeira fase do projecto permitiram consolidar as relações entre os diferentes parceiros (apresentação de espectáculos, mas também estágios, residências de artistas, edições, legendagem, traduções, bolsas ...
Read Project

 6

 FINISHED 

Increasing Resilience in Surveillance Societies (IRISS)

Start date: Feb 1, 2012, End date: Jan 31, 2015,

"IRISS (Increasing Resilience in Surveillance Societies) will investigate societal effects of different surveillance practices from a multi-disciplinary social science and legal perspective. It will focus on the effects that surveillance practices introduced to combat crime and terrorism can have on citizens in open and democratic societies. It will review surveillance systems used in fighting cri ...
Read Project

 17

 FINISHED 
...d modern “intelligent” systems can be found incorporated in every day use items. The electromechanic technology (mechatronics) has reached a top level of performing functions, such as voice and iris recognition and face hollogram recognition. These alongside with the rapid development of computer technologies and other new technologies , create the so called “intelligent environments”. These ...
Read Project

 3

 FINISHED 

Crossing Borders

Start date: Jan 1, 2015, End date: Dec 31, 2015,

...al (Mr. Kim and Sister Lotus / Directors: Sou-Yen Kim and Miriam Rossius, Producer: Gregor Streiber, Inselfilm) and the Berlinale (Inside the Chinese Closet / Director: Sophia Luvara, Producer: Iris Lammertsma).Immediate results are among others:• improvements of the participating projects clearly visible after the first development workshop, where projects get more focused and targeted towards th ...
Read Project

 2

 FINISHED 
In response to growing industry demand for rapid, non-destructive techniques for foreign body detection and identification in food products, IRIS (an advanced engineering company from Spain that specialises in the integration of real-time monitoring solutions in the industry) will accelerate the development of an affordable, rapid and accurate hyperspectral imaging (HSI) system for the on-line det ...
Read Project

 1

 FINISHED 

Quality-introspective data management system (EXQUALIBUR)

Start date: Sep 1, 2007, End date: Aug 31, 2010,

Real world data is never as perfect as we would like it to be and can often suffer from corruptions that may impact interpretations of the data, models created from data, and decisions made based on data. The problem of poor data quality stored in database -backed information systems is largely widespread in the governmental, commercial and industrial environments. It must be addressed urgently by ...
Read Project

 2