Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...ss-by noise engineering, tackling as well the pass-by noise aspects of the ‘source’, the ‘transfer path’ and the ‘receiver’.PBNv2 is formed by 10 beneficiaries combining leading education institutes, top research institutions and leading companies as well as 7 partner organisations established in European automotive R&D, to assist in the dissemination and public engagement or PBNv2 results, and in ...
Read Project

 10

 FINISHED 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Read Project

 11

 FINISHED 

Carbon-based nano-materials for theranostic application (CARTHER)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Our proposal aims to carry out a systematic interdisciplinary study of carbon-based nanomaterials, such as: carbon fluoroxide nanoparticles, carbon nanotubes, graphene and nanodiamonds for advanced theranostic application. Their uptake efficiency and specific localization in biological cells depending on intentionally designed surface chemistry will be studied in details. Extremely rich physico-ch ...
Read Project

 7

 FINISHED 

Smart Implants from Safe CERAmics (SISCERA)

Start date: Jan 1, 2017, End date: Mar 31, 2019,

Great advances were made by SISCERA partners in the development of the world’s first ceramics showing transformation induced plasticity and perfect predictability. These specifically designed materials were the main research results of the LongLife FP7 project and will be brought to market via SISCERA. The LONGLIFE material is based on a novel, highly biocompatible ceramic coupled with a specific ...
Read Project

 5

 FINISHED 
In the wind power generation, aerospace and other industry sectors there is an emerging need to operate in the low temperature and highly erosive environments of extreme weather conditions. Such conditions mean current materials either have a very short operational lifetime or demand such significant maintenance as to render many applications either very expensive to operate or in some cases non-v ...
Read Project

 18

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9

 FINISHED 

PhD on Innovation Pathways for TES (INPATH-TES)

Start date: May 1, 2015, End date: Apr 30, 2018,

...is to develop a joint PhD programme between universities and research centres, on the topic of Thermal Energy Storage (TES). The goal of INPATH-TES is to create a network of universities and research institutes to implement a joint PhD programme on TES technologies. The final result of such a network is to educate professionals on these technologies for the European research and industry instituti ...
Read Project

 22

 FINISHED 
Abnormal heart rhythms are a major cause of cardiovascular disease and death in Europe. Sudden cardiac death accounts for 50% of cardiac mortality in developed countries; ventricular tachycardia or ventricular fibrillation is the commonest underlying arrhythmia. In the ambulatory population, atrial fibrillation is the commonest one, and is associated with increased risk of stroke and heart failur ...
Read Project

 7

 FINISHED 
The principal aim of this project is to develop and apply revolutionary graphics rendering and artificial intelligence (AI) methods to an existing social media search engine platform (known as Tapastreet) thereby creating ground breaking mobile search capabilities with significant online commercial potential.Specifically these goals will be achieved by meeting the following Scientific & Technologi ...
Read Project

 3

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Prediction of Erosion Damages in Hydraulic MAchines (PREDHYMA)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"Hydraulic turbines can undergo severe damaging during operation, because of low quality water or detrimental flow conditions. Damaging induces maintenance costs and power production losses, and can also endanger safety of installations. Hydropower plants operators and turbine manufacturers are interested in extending overhaul periods by reducing damaging intensity and protecting turbine component ...
Read Project

 2

 FINISHED 

PhDs Enhanced for Prospects- ErasmUs Plus

Start date: Sep 1, 2014, End date: Aug 31, 2017,

The PEP-UP project will identify the feasible features of PhD education programs that need to be emphasized to make engineering PhD graduates more prepared for employment in industry and more able to use their talents and training for the benefit of the economy, regions and society. Eight leading technical universities in Europe, with the contribution of two European companies and regio ...
Read Project

 10

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

COatings for BipolaR plAtes (COBRA)

Start date: Apr 1, 2014, End date: Mar 31, 2017,

...areas: chemistry, physics, material science, fuel cell engineering. Thus the COBRA consortium combines the collective expertise of bipolar plate and coating suppliers, system integrators and research institutes and thus removes critical disconnects between stakeholders.The scientific objectives of this project are elaboration and characterization of low-cost new functional coated bipolar plates hi ...
Read Project

 6

 FINISHED 
"OILTEBIA (Optical Imaging and Laser TEchniques for BIomedical Applications) is an Initial Training Network (ITN) that seeks to train researchers in a multidisciplinary environment where pulsed laser technology, sensor and signal processing techniques meet in the biomedicalenvironment to achieve novel optical imaging technologies from bench to bedside, spanning from basic research and drug discove ...
Read Project

 10

 FINISHED 

Intelligent Catheters in Advanced Systems for Interventions (INCITE)

Start date: Mar 1, 2014, End date: Mar 1, 2017,

INCITE aims to develop intelligent catheter technologies and systems that will accelerate the paradigm shift from costly, burdensome surgical treatments to cost-effective and patient-friendly minimally invasive interventions. It will also enable the creation of new advanced treatments for currently complex surgical procedures. This will allow for more individuals to be treated thereby contributing ...
Read Project

 24

 FINISHED 

Advanced materials for batteries (MAT4BAT)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

"Li-ion technologies initiated in the 90’ at a fast development pace thanks mainly to emerging ICTs with more than 20 GWh sold in 2010. Soon, it appeared as a credible technology for electrical vehicles as it could provide average energy densities of about 140 Wh/kg. However and since then,major breakthroughs have been expected to reach higher storage levels of 250 Wh/kg on battery system level wi ...
Read Project

 18

 FINISHED 
The SITOGA project will address for the first time the integration of transition metal oxides (TMO) materials in silicon photonics and CMOS electronics. TMOs have unique electro-optical properties that will offer unprecedented and novel capabilities to the silicon platform. SITOGA will focus on two disruptive TMO materials, barium titanate (BaTiO3) and vanadium oxide (VO2), for developing advanced ...
Read Project

 8

 FINISHED 

Evolution of Evolution (EvoEvo)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Evolution is the major source of complexity on Earth, at the origin of all the species we can observe, interact with or breed. On a smaller scale, evolution is at the heart of the adaptation process for many species, in particular micro-organisms (e.g. bacteria, viruses...). Microbial evolution results in the emergence of the species itself, and it also contributes to the organisms' adaptation to ...
Read Project

 7

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
"Electrical Power Distribution Systems (EPDS) employed among others in Aeronautics are usually protected by active electronic driven switching components. In order to reduce response time and simplify protection driving, fuses are being considered as one of the prerequisite for the CleanSky HVDC network.The development of a new generation of hybrid and/or full static current limiter solutions, abl ...
Read Project

 3

 FINISHED 
This project aims at the development of an automatic quality control and feedback mechanism to improve draping of carbon fibres on complex parts. There is a strong need in the automotive industry for automatic systems that perform quality control and improve draping processes in order to allow high production volumes.The technology that is being developed in the project will include a new sensor s ...
Read Project

 7

 FINISHED 

OPerating RAck For Full-Electric Vehicle (OPERA4FEV)

Start date: Sep 1, 2011, End date: Aug 31, 2016,

To improve deployment of electrical vehicles in Europe, large scale production processes for Rack, cells and electrical components need to be developed. The OPERA4FEV project aims to develop a cost effective innovative thermoplastic battery rack, able to integrate any type of cylindrical cells. The solution proposed by OPERA4FEV project, adaptable to any Full Electric Vehicle model, will indeed in ...
Read Project

 11

 FINISHED 
... research area of biomimetic approaches of natural functional surfaces and the extreme wettability. The aim of the proposed programme is to facilitate research staff exchange between the leading institutions in biomimetics so that complementary and synergistic skills can be acquired as per the needs and skills offered by the respective partners. These can then be exploited in the future through i ...
Read Project

 6

 FINISHED 

POWER SoC With Integrated PassivEs (PowerSwipe)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

Europe is a world leader in innovative automotive systems with competencies covering the full supply chain from the main OEMs (Audi, BMW, Daimler, Fiat, PSA, RSA, VW) to Tier1 suppliers (Bosch, Continental, Magneti Marelli) to leading semiconductor companies (Infineon, ST). The vision for electronic automotive control units in 2020 is that the battery will supply multi-core µControllers via multip ...
Read Project

 9

 FINISHED 

BIOCERAMICS FOR BONE REPAIR (BIOBONE)

Start date: Mar 1, 2012, End date: Feb 29, 2016,

"There is a general consensus that ceramic based materials should play a very important role in the development of new therapies to treat and substitute damaged or diseased bone. Due to their resistance to wear and corrosion, bioinert technical ceramics are the ideal candidates to replace metallic alloys in a new generation of small, durable and safe orthopaedic implants. On the other hand, osteoc ...
Read Project

 9

 FINISHED 
In the current market, the well-known brands of technical textiles are coated with Perfluorocarbon chemistry to possess highly durable oil and water repellent (OWR) finish. In early days, water repellent finish for fabrics was provided by simple paraffin or wax coatings which washed out eventually. Alternatively, PFOS and PFOA are the chemicals belonging to the family of perflourochemicals (PFCs) ...
Read Project

 12

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The aim of LONGLIFE is to develop new multi-functional zirconia oral and spine (lumbar inter-vertebral disc) implants, with a perfect reliability and a lifetime longer than 60 years. Such an ambitious goal, motivated by the risks and costs associated to revision surgery, will only be reachable by an improvement of the Low Temperature Degradation (LTD) resistance of zirconia and by an enhancement o ...
Read Project

 13

 FINISHED 
The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Read Project

 20

 FINISHED 
This proposal addresses the consolidation of the European Centre for Nanostructured Polymers - ECNP - which was established in 2006 by the European Network of Excellence NANOFUN-POLY (FP6 2004-2008) and is currently operating in coordinating research, dissemination and technology transfer activities among its partners. ECNP is focused on the continuation of the four main activities of the NoE: a j ...
Read Project

 5

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 
"Recent studies suggest that vehicles, driven in electric mode, either hybrid or pure electric vehicles, are considerably quiet and, thus, that they constitute a safety hazard for pedestrians and bicyclists in traffic. It is claimed that such vehicles are not acoustically perceived due to the power unit being exchanged from a combustion engine to electric motors; something that essentially cuts aw ...
Read Project

 13

 FINISHED 

Packaging of futuRe Integrated ModulAr Electronics (PRIMAE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

"Affordable transport for the citizen relies on innovative solutions and technologies that will result in lower costs and lead-time of the aircraft and its systems. In this area, the packaging of on-board computers is an important contributor.The Packaging of futuRe Integrated ModulAr Electronics (PRIMAE) objective is to develop a new flexible, robust and open aeronautical packaging for the next g ...
Read Project

 20

 FINISHED 
Searching for the alternative energy sources and particularly for liquid fuel is strategic task for the nearest future. Renewable biomass, large deposits of natural gas and coal can be such sources. A major challenge for this direction is to develop efficient the gas-to-liquid process. The heart of such process is Fischer-Tropsch (FT) synthesis (CO hydrogenation by hydrogen) that takes place on Co ...
Read Project

 4

 FINISHED 

A quantitative model of thrombosis in intracranial aneurysms (THROMBUS)

Start date: Feb 1, 2011, End date: Apr 30, 2014,

Rupture risk of intracranial aneurysms (IA) has been studied at length. However, very little is known about the healing mechanism, namely the formation of a clot inside the cavity after insertion of a stent. The multiscale interaction between biological and hemodynamic processes is the central ingredient of this proposal. The core of the project is to develop and validate a biological model of spo ...
Read Project

 10

 FINISHED 

PREPARED “ENABLING CHANGE” (PREPARED)

Start date: Feb 1, 2010, End date: Jan 31, 2014,

IPCC climate change scenarios have a global perspective and need to be scaled down to the local level, where decision makers have to balance risks and investment costs. Very high investments might be a waste of money and too little investment could result in unacceptable risk for the local community. PREPARED is industry driven, 12 city utilities are involved in the project and the RDT carried out ...
Read Project

 36

 FINISHED 
On the way to a more knowledge based economy and in accordance with scientific and technological agreements with the European Union, Tunisia launched necessary policies and measures to set up and improve the efficiency of research centres such as the Centre of Biotechnology of Sfax (CBS). As a key element of the Tunisian Biotechnology Plan the CBS focuses on applied research particularly in terms ...
Read Project

 7