Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

European Network of Logistics Competence Centres (ENLoCC)

Start date: Dec 31, 2003, End date: Dec 30, 2007,

...ross Europe founded the 'Open ENLoCC' network which is to continue beyond the end of the ENLoCC project as the logistics competence network. It now has 16 members and met in May 2007 for its yearly assembly in Malmö. The 2008 assembly will be in Naples on June 13th.
Read Project

 5

 FINISHED 

youth plicy and youth information

Start date: Dec 1, 2009,

...ished generalist youth information structures and perspective corresponding realities from the aforementioned regions.As the seminar will take place near to and contemporarily with the ERYICA General Assembly, participants will have the chance to work, .during some specific, content-creation sessions (workinggroup, national presentations), with representatives of existing national coordination bod ...
Read Project

 21

 FINISHED 

Gender-Medicine

Start date: Oct 1, 2009,

...d men. Side effects of frequently used drugs, use of prevention and rehabilitation depend on gender. A large imbalance of gender knowledge between different European regions exists. Yet, a systematic assembly of gender aspects in medicine is lacking in Europe. European universities and their associated partners will join forces in EUGIM to generate a flexible module “Gendermedicine (GM)” that tea ...
Read Project

 7

 FINISHED 

EUROPEAN DANCEHOUSE NETWORK 14-17

Start date: Sep 1, 2016, End date: Aug 31, 2017,

... drawn up through a process of consultation and consideration by the network membership which sets out five major strategic objectives, and accompanying actions, that are to be approved yearly by the Assembly on the recommendation of the Board. The strategic objectives, approved at the last Assembly meeting in Hamburg on 28th, February, 2014, are:1. To improve all forms of resources for the profes ...
Read Project

 1

 FINISHED 

EUROPEAN DANCEHOUSE NETWORK 14-17

Start date: Sep 1, 2015, End date: Aug 31, 2016,

... drawn up through a process of consultation and consideration by the network membership which sets out five major strategic objectives, and accompanying actions, that are to be approved yearly by the Assembly on the recommendation of the Board. The strategic objectives, approved at the last Assembly meeting in Hamburg on 28th, February, 2014, are:1. To improve all forms of resources for the profes ...
Read Project

 1

 FINISHED 

EUROPEAN DANCEHOUSE NETWORK 14-17

Start date: Sep 1, 2014, End date: Aug 31, 2015,

... drawn up through a process of consultation and consideration by the network membership which sets out five major strategic objectives, and accompanying actions, that are to be approved yearly by the Assembly on the recommendation of the Board. The strategic objectives, approved at the last Assembly meeting in Hamburg on 28th, February, 2014, are:1. To improve all forms of resources for the profes ...
Read Project

 1

 FINISHED 
...d to public authorities, thereby strengthening the foundation for policies about vineyard management. Expected results: The main expected results of the VITISOM LIFE project are: Design and assembly of five innovative fertilisation prototypes for the distribution of organic matter in vineyards and their testing in five pilot areas with different environmental and agricultural conditions; An ...
Read Project

 8

 FINISHED 

Personal computers new equipments (PC-NEW)

Start date: Apr 1, 2001, End date: Sep 30, 2003,

...echnical processes used by PC NEWS simultaneously aim at minimising waste production at source, thus avoiding negative health and environmental effects, and at recycling materials for subsequent reassembly as useful products, thus minimising environmental impacts and generating economic benefits. The objective was to introduce a technological process that would permit, over a two year period, r ...
Read Project

 1

 FINISHED 
...ning and testing appropriate governance structures and mechanisms mainly on the level of Action Groups (AGs), at the same time to create synergies with the other EUSALP implementing bodies General Assembly and Executive Board and further institutional actors in alpine policy, thus directly addressing Specific Objective 11.1 of the ASP. AlpGov addresses tasks of the EUSALP AGs as outlined in the re ...
Read Project

 13

 FINISHED 
The CENTURIO programme, created by the Assembly of European Regions (AER) in 1994, has been successfully promoting dialogue and exchange of experience between European regions for several years. However, the enlargement of the EU in May 2004 served to illustrate that the European and global context for the regions is changing. Their growth and competitiveness depend on their capacity to develop in ...
Read Project

 49

 FINISHED 

European Clusters and Regions for Eco-Innovation Network Plus (ECREIN+)

Start date: Dec 31, 2009, End date: Dec 30, 2012,

...tted to INTERREG IVC as a regional initiative project will associate 6 new regions coming from 5 new countries: Romania, Bulgaria, Sweden, United Kingdom, and Belgium. For a larger dissemination, the Assembly of European Regions (AER) will be an active partner and responsible for the communication Component of the project.The project will be divided into 3 components: the management component lead ...
Read Project

 13

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

... to take part in the Erasmus+ program of the European Commission. Regarding the student profiles who participate in this type of mobility, we have on one hand system administrators: who are able to assembly and repair computers, implement and configure computer networks, install and manage any kind of software and operating systems, etc., and software developers: able to analyze, design and develo ...
Read Project

 1

 FINISHED 

European Network of Mining Regions (ENMR)

Start date: Jun 30, 2004, End date: Aug 30, 2006,

... Achievements: After commencing operations 1 January 2005, the ENMR has run its programme for two-and-a-half years. During this time, the ENMR has conducted two General Assembly meetings (one kickoff and one concluding meeting), eight Steering Committee meetings, six Thematic Working Group meetings, and 48 regional meetings (four each in 12 regions). Also, the ENMR h ...
Read Project

 18

 FINISHED 

Gaining Added-value from Timber in Europe (GATE)

Start date: Sep 30, 2004, End date: Dec 30, 2007,

...afety seminar was also held in Estonia in September 2005. Objectives have been disseminated through many GATE and external events in each region. In Wales, two buildings shows, presentations to Assembly Members at the Welsh Assembly Government and the annual Royal Welsh Shows, meetings with stakeholders and a handover workshop. In Thuringia a seminar on multi-storey timber construction was held an ...
Read Project

 5

 FINISHED 
... conducted, project results were presented in expert fora and two cross-border networks were initiated. Project results were presented in several expert fora and in front of a political assembly in Simrishamn, Sweden.
Read Project

 4

 FINISHED 

Mobility Management oVer Europe: Changing Mobility Patterns (MMOVE)

Start date: Oct 31, 2008, End date: Oct 30, 2011,

...the local mobility policy. The Best Practices collection results & the draft report were presented to the whole partnership. Each partner presented one Best Practice judged as most interesting by the assembly of partners. The second part of the meeting opened officially the second technical phase of the project, dedicated to Study Visits, with a presentation of the results of the first selection o ...
Read Project

 12

 FINISHED 

INNOVATION FOR SOCIETAL CHANGE (PEOPLE)

Start date: Sep 30, 2008, End date: Dec 30, 2012,

...tions among development agencies, foundations, local government, universities, etc. All of them linked to PEOPLE for the next 18 months. At the same time, PEOPLE has been participating to the AER (Assembly of European Regions) International conference in October 2009 to enhance our visiblility at specialized networks. Further to the conference, PEOPLE has been invited to the Sen@er and ALEC 2010 C ...
Read Project

 7

 FINISHED 
...an Institute of Business Competitiveness (ES), Patras SciencePark representing Western Greece region (EL), Euro Perspectives Foundation representing Gabrovo region (BG), Noord-Brabant province (NL), Assembly of European Regions (FR), Észak – Alföld regional development agency (HU) and Oldham Council representing Greater Manchester Region (UK).Project activities include the collection and documenti ...
Read Project

 16

 FINISHED 
...actors that can generate innovation based employment opportunities, to boost the creation of jobs in these segments of their regional economy.These partners are Flevoland province (NL, lead partner), Assembly of European Regions (FR), MMU/Centre for Enterprise (UK), Veneto region and Veneto Innovazione (IT), Bologna province (IT), Észak-Alföld regional development agency (HU), Maramures County (RO ...
Read Project

 12

 FINISHED 

Youth Entrepreneurship Strategies (YES)

Start date: Dec 31, 2009, End date: Dec 30, 2012,

...l Business Act and in the Oslo agenda. The partnership consists of 8 partners from: SE, ES, FI, PL, IE, EE, FR and SK. Six regional governments, a national youth entrepreneurship organisation and the Assembly of European Regions.YES origins from a regional need to develop and work with new methods in order to review regional policies. The need to absorb new knowledge and inspiration on youth entre ...
Read Project

 8

 FINISHED 

Next Generation Digital Mock-Ups for Multi-Physics Simulation (MUMPS)

Start date: Dec 1, 2016, End date: Nov 30, 2018,

... terms of managing the complexity of multidisciplinary design and development. Computational Simulation is essential to meet these challenges, but setting up complex numerical simulations for large assembly structures is extremely time-consuming and requires highly-skilled engineers. Even though solve time is often used as a key performance indicator, model preparation is typically orders of magni ...
Read Project

 1

 FINISHED 

Model European Parliament Nederland 2016

Start date: May 2, 2016, End date: Dec 1, 2016,

...utch senate), followed by delegation meetings to discuss the resolutions, and to lobby for their own committee. The last two days the resolutions are to be defended and voted about at the General Assembly, hosted in the conference hall of the Second Chamber of the States General (the Dutch House of Representatives). After participating in the MEP, the students become part of the alumni network. Ma ...
Read Project

 1

 FINISHED 
...contribution to identification of Cross sectional Joint Research agenda (together with other ETP´s) and allows for a derivation of concerted partial roadmaps for the different thematic areas in MNT (Assembly, Micro/Nanotechnologies, System integration).To obtain sustainability MINAM 2.0 will be established as a “one stop shop” hub for exchanging information, adding value to all players in this are ...
Read Project

 9

 FINISHED 
...king between EU-funded and national researchers are not realised, fragmenting the original research objectives and achievements. The EC already informally hosts the Future Internet Forum (FIF) at FI Assembly meetings. ceFIMS (Coordination of the Future Internet Forum of Member States) will provide functional ongoing support to the FIF to create synergies between research programmes funded by the ...
Read Project

 6

 FINISHED 

Cladogenesis and Niche Evolution in Madagascan Forests (MADCLADES)

Start date: May 1, 2014, End date: Apr 30, 2016,

...in tropical forests, the world’s most biodiverse terrestrial ecosystems. It will also provide the first substantial insights into plant diversification on Madagascar. We will study the evolutionary assembly of the island’s forests using palms (Arecaceae) as a model group. Madagascan palms (195 spp., 192 endemic) are present in all forest types of the island and play an integral role in forest ecol ...
Read Project

 1

 FINISHED 

European Clusters for Offshore Wind Servicing (ECOWINDS)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

...shore Wind Servicing (ECOWindS) project builds on existing network within offshore wind energy to establish cluster cooperation in Offshore Wind Servicing (OWS) encompassing the industrial processes; assembly and installation of offshore wind turbines and operation and maintenance of wind turbines offshore.ECOWindS is a collaboration between research-driven clusters from South Denmark, East of Eng ...
Read Project

 7

 FINISHED 
...project proposal with a vertical supply chain involved with contributions from partners in 7 European countries. This spans expertise from raw material research, process innovation, pilot line, assembly innovation and pilot line up to various application domains representing enhanced smart systems. The supporting partners consist of market leaders in their domain, having excellent technological ba ...
Read Project

 40

 FINISHED 
...ignificant market in Europe and a large and sustainable benefit for the public transport sector:• economic wise, because the operational costs are about 50% cheaper than diesel-driven busses (assembly, operation, maintenance)• innovation wise, because these vehicles are equipped with several sensors that are contected to the internet to give more precise information • ecological wise, because of ...
Read Project

 3

 FINISHED 
...munication and innovation strategy, but also by the active involvement of key players such as AGE, CORAL, AAL JP, all EIP AHA Action Groups, ECHAlliance, ASHOKA, ERRIN, DigitalEurope, EuroCarers, the Assembly of European Regions and highly committed regional/local governments. Through this unique partnership, the proposed action will have direct outreach to thousands of multiplier entities which t ...
Read Project

 9

 FINISHED 

Biodiversity drivers on islands and continents (BIODIV ISLAND-CONT)

Start date: Oct 1, 2016, End date: Sep 30, 2018,

...on. The feasibility of BIODIV ISLAND-CONT is supported by the extensive database provided by four different European funded projects, offering an invaluable tool to study the differences in community assembly of islands vs. continents. The project will be hosted by two high-quality European institutions: FMNH-UH in Finland and IPNA-CSIC in Spain, enhancing the reciprocal transfer of knowledge amon ...
Read Project

 1

 FINISHED 
...aper, film material. METHODIC MANAGEMENT COMPONENTS• Project Management Office (PMO) as steering group• Meetings, minutes, quality circle, project review • General Assembly• Stakeholder Advisory Board• TOOLS TO ENSURE PROJECT PROGRESS: Null-Hundred-Method, Task & Allocation Table, Gantt-Chart, Critical Path Analysis, Milestone Trend Analysis, report templates, communication strategy, Responsibilit ...
Read Project

 5

 FINISHED 

AER Summer Academy 2016: Youth and Entrepreneurship in Europe's Regions

Start date: Aug 1, 2016, End date: Jan 31, 2017,

The Assembly of European Regions Summer Academy is an established meeting place for regional youth representatives, experts and decision-makers in Europe. Østfold County Council is to host this event in August 2016, and has chosen as topic for its event Youth and Entrepreneurship in Europe's Regions. The main idea of the project “AER Summer Academy 2016: Youth and entrepreneurship in Europe's regi ...
Read Project

 8

 FINISHED 
...ing Epidemics program (http://ec.europa.eu/research/health/). Once infected, no specific treatment is available, partially due to the lack of detailed information on the molecular mechanisms of viral assembly. The project intends to fill that gap by studying the viral assembly capsid protein, in biologically relevant conditions, using lipid bilayers mimicking biological membranes and intracellular ...
Read Project

 1

 FINISHED 

Youth for Europe

Start date: Feb 1, 2016, End date: Sep 30, 2017,

...s involved (e.g. youth exchanges and other transnational mobility opportunities for young people)• Assisting in the organisation of YES Forum events and conferences (e.g. the Y.E.S. Forum General Assembly, Project Planning Meeting).• Assisting in daily administrative tasks• Contributing to the bi-monthly newsletter, updating the organisations’ website, social media (Facebook and Twitter) The volun ...
Read Project

 2

 FINISHED 

V Modelo de las Naciones Unidas de la Universidad de Oviedo

Start date: Jan 2, 2016, End date: May 1, 2016,

...s in different formats. Secondly, debates between the participants on some of the most sensitive issues of the international agenda, simulating the functioning of some organs of the UN (General Assembly, Economic and Social Council, Security Council, etc.). Thirdly, a “social pack” with a variety of activities that should encourage positive social dynamics. The realisation of OVImun 2016 will go t ...
Read Project

 3

 FINISHED 

Fair trade for a fair future. Global consumer conscience.

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The United Nations General Assembly put in place a 2015 global development framework in which organisations are encouraged to to promote a conducive environment for open, rule-based,non-discriminatory trading and financial systems to help eradicate poverty and overcome inequalities. There is an overarching value in partnerships for development and this project enables young people to meet, c ...
Read Project

 6

 FINISHED 

TRaditions and Education as A Sharing of cultURES around water

Start date: Sep 1, 2015, End date: Aug 31, 2017,

...uage tuition and that of specialised subjects at international levels, involve students in the project work by eTwinning. The project activities are especially: vocabulary seminar, project team assembly, communication with the local government (if possible), selecting “regional treasures”, photography and video course, recording video, editing the video, compiling and editing the brochure, creati ...
Read Project

 3

 FINISHED 

Técnicos en Mantenimiento Electromecánico

Start date: Sep 1, 2015, End date: Aug 31, 2016,

...e production areas in automated processes as responsible for lines, integrating the functions of production and maintenance. • The production areas making machinery manufacturing assembly, installation and technical assistance in factory. The vocational training of Electromechanical Motor Vehicles is directed to: • Repair the heat engine and its auxiliary systems using repairing techniques prescri ...
Read Project

 2

 FINISHED 

Po doświadczenia i kwalifikacje do niemieckich firm

Start date: Jun 1, 2015, End date: May 31, 2017,

...e in the field of vocational education. - the complement of education in the field of programming the microcontrollers and programmable logic controllers used in industry on the basis of automotive assembly line model, getting acquainted with the safety and technical European rules and regulations. - accomplishing a qualifying course enabling to work professionally at the German job market (VDE-Le ...
Read Project

 3

 FINISHED 

Nationale Model European Parliament conferentie 2015

Start date: May 2, 2015, End date: Dec 1, 2015,

... Shortly after the opening the contestants start with their delegation meetings and lobbying for their resolutions. The last two days the resolutions are to be defended and voted about at the General Assembly. This GA is hosted by the plenary conference hall of the Dutch House of Representatives. At the official closing ceremony, the importance of their work was mentioned by a former Permanent Rep ...
Read Project

 1