Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Access to Large Infrastructures for Severe Accidents (ALISA)

Start date: Jun 1, 2012, End date: May 31, 2018,

"Enhanced transnational access to large research infrastructures in Europe and in China is offered to allow the optimal use of the resources in the extremely complex field of severe accident analysis for the existing power plants. This research involves very substantial human and financial resources and, in general, the research field is too wide to allow investigation of all phenomena by any nati ...
Read Project

 2

 FINISHED 
PELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, l ...
Read Project

 12

 FINISHED 
The aim of MANUNET II is to cooperate among regions and countries around Europe with fruitful calls in the field of Manufacturing, to ensure that MANUNET II suits perfectly in ERA and, finally, to propose a sustainable cooperation structure for a very long term frame.In order to enhance this impact, the extension that will cover MANUNET II is going to be longer than MANUNET CA, having included mor ...
Read Project

 19

 FINISHED 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Read Project

 9

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 
Recent safety assessments nuclear waste repositories have shown that the formation and stability of colloids may have a direct impact on the overall performance of the repository.The main aim of the BELBaR project is increase the knowledge of the processes that controls clay colloid stability, generation and ability to transport radionuclides. The overall purpose of the project will be to suggest ...
Read Project

 18

 FINISHED 

Fate and Impact of Atmospheric Pollutants (AMIS)

Start date: Feb 1, 2012, End date: Jan 31, 2016,

"The proposed project aims at establishing a long-lasting collaboration and creates a network of European and Chinese research centres of excellence in the area of air quality and climate change studies. This aim will be achieved by undertaking joint research activities via collaboration facilitated by individual mobility of researchers between Europe and China. Accordingly, this network will cont ...
Read Project

 9

 FINISHED 

Integrated non-CO2 Greenhouse gas Observing System (INGOS)

Start date: Oct 1, 2011, End date: Dec 31, 2015,

InGOS will support and integrate the observing capacity of Europe for non-CO2 greenhouse gases (NCGHG: CH4, N2O, SF6, H2 and halocarbons). The emissions of these gases are very uncertain and it is unknown how future climate change will feedback into the land use coupled emissions of CH4 and N2O. The NCGHG atmospheric abundances will increase further in the future and the emissions of these gases a ...
Read Project

 39

 FINISHED 

Zebrafish Regulomics for Human Health (ZF-HEALTH)

Start date: Jul 1, 2010, End date: Dec 31, 2015,

In recent years, the zebrafish has emerged as a new vertebrate model organism for biomedical research which offers a unique combination of traits: a short generation time, small size and efficient breeding procedures make it the best choice among vertebrates for forward genetic screening and small-molecule screens, including toxicology, while the transparent embryo and larva offers unique opportun ...
Read Project

 20

 FINISHED 
"The European Strategy Forum on Research Infrastructures (ESFRI) recognizes in its roadmap for Research Infrastructures that ""in the near future, hydrogen, as an energy carrier derived from a number of other fuels, and fuel cells, as energy transformers, are expected to play a major role, for mobile and stationary applications"". With the current fragmentation of the European R&D infrastructures ...
Read Project

 20

 FINISHED 
The advancement of science and engineering in the past decades is inherently linked to the development of lasers. Ever higher laser beam powers, brightness and shorter pulse lengths have helped establish them as an invaluable tool for both a wide range of industry and medical applications, such as for example material treatment, precision measurements, laser cutting, display technologies, and las ...
Read Project

 11

 FINISHED 
ÉCLAIRE investigates the ways in which climate change alters the threat of air pollution on European land ecosystems including soils. Based on field observations, experimental data and models, it establishes new flux, concentration and dose-response relationships, as a basis to inform future European policies.Starting with biosphere-atmosphere exchange measurements, ÉCLAIRE quantifies how global w ...
Read Project

 41

 FINISHED 
Nanoscale objects interact with living organisms in a fundamentally new manner, ensuring that a fruitful marriage of nanotechnology and biology will long outlast short term imperatives. Therefore, investment in an infrastructure to drive scientific knowledge of the highest quality will have both immediate benefits of supporting the safety assessment of legacy nanomaterials, as well as pointing tow ...
Read Project

 33

 FINISHED 

Peptide-based diodes for solar cells (PEPDIODE)

Start date: Aug 1, 2011, End date: Jul 31, 2015,

In a solar cell that converts energy as efficient as the natural plant photosystems, electrons should travel over very short distances, through an extremely ordered structure free of traps. Guided by these principles that were worked out at WIS and CUNY, we want to synthesize many different peptides, and consecutively screen variants thereof for a putative diode function. When linked to light-harv ...
Read Project

 8

 FINISHED 
EXPEER will bring together, major observational, experimental, analytical and modelling facilities in ecosystem science in Europe. By uniting these highly instrumented ecosystem research facilities under the same umbrella and with a common vision, EXPEER will form a key contribution to structuring and improving the European Research Area (ERA) within terrestrial ecosystem research.EXPEER builds ...
Read Project

 41

 FINISHED 

Safe ExploitAtion Related CHemistry for HLM reactors (SEARCH)

Start date: Nov 1, 2011, End date: Apr 30, 2015,

"In accordance with the ESNII roadmap MYRRHA will be the first HLM cooled nuclear system to be deployed in Europe. The SEARCH project aims to support the licensing process of MYRRHA by investigating the safe chemical behaviour of the fuel and coolant in the reactor. The control of the oxygen content and the management of impurities in the melt will be studied. A second critical issue in the safety ...
Read Project

 13

 FINISHED 

EUropean DATa (EUDAT)

Start date: Oct 1, 2011, End date: Mar 31, 2015,

EUDAT is our proposal for the next stage in the realisation of the vision of "data as infrastructure". The EUDAT consortium includes representatives from each stage of the value chain that has evolved to deliver scientific knowledge to researchers, citizens, industry and society as a whole. It includes funding agencies that invest in research infrastructures and programmes of research, infrastruct ...
Read Project

 28

 FINISHED 

Parliaments and Civil Society in Technology Assessment (PACITA)

Start date: Apr 1, 2011, End date: Mar 31, 2015,

The PACITA Mobilisation and Mutual Learning Action Plan will distribute capacity and enhance the institutional foundation for knowledge-based policy-making on issues involving science, technology and innovation, mainly based upon the practices in Parliamentary Technology Assessment (PTA). PTA supports the processes of democratic policy-making on issues involving science, technology and innovation, ...
Read Project

 16

 FINISHED 

Fuel Cell Coupled Solid State Hydrogen Storage Tank (SSH2S)

Start date: Feb 1, 2011, End date: Mar 31, 2015,

"The main objective of SSH2S is to develop a full tank-FC integrated system according to the requirements of the call and to demonstrate its application on a real system. A new class of material for hydrogen storage (i.e. MM'(BH4)n mixed boroydrides) as well as an allready known system (Li-Mg-N-H) will be explored. A new concept of solid state hydrogen tank (i.e. combination of two materials) will ...
Read Project

 8

 FINISHED 
Background and motivation:The combination of cloud computing, service-orientation, and on-demand application delivery is bringing about a paradigm shift in our ways of computer usage. As the software industry moves closer to service-based application engineering and cloud-based application delivery, the traditional models, methodologies, and technologies for developing and offering software applic ...
Read Project

 7

 FINISHED 
This project addresses the issue of safe indoor use of hydrogen and fuel cells systems (priority 4.6 of the call FCH-JU-2010-1) for early markets (forklift refuelling and operation, back-up power supply, portable power generation, etc.): It aims to provide scientific and engineering knowledge for the specification of cost-effective means to control hazards specific to the use of hydrogen indoors o ...
Read Project

 10

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 

Supercritical Water Reactor - Fuel Qualification Test (SCWR-FQT)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

"The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR ...
Read Project

 10

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 

Enabling Technologies for Personal Air Transport Systems (myCopter)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

Considering the prevailing congestion problems with ground-based transportation and the anticipated growth of traffic in the coming decades, a major challenge is to find solutions that combine the best of ground-based and air-based transportation. The optimal solution would consist in creating a personal air transport system (PATS) that can overcome the problems associated with all of our current ...
Read Project

 6

 FINISHED 
The EURATOM FP7 Collaborative Project “Fast / Instant Release of Safety Relevant Radionuclides from Spent Nuclear Fuel (CP FIRST-Nuclides)” is established with the overall objective to provide for improved understanding of the fast / instantly released radionuclides from disposed high burn-up UO2 spent nuclear fuel. This issue is given a high priority in the SRA of the IGD-TP. The outcome of the p ...
Read Project

 11

 FINISHED 

Target binders (TARGETBINDER)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

"We want to further develop our tools and technologies for high-throughput research, with the final goals being (I.) the particle-based combinatorial synthesis of 1 Mio different peptides on a glass slide for chemical costs of ~50€ (KIT, CBL, MS, TUV), and (II.) the labelling-free parallel readout of binding affinities by a variant reflectometric interference spectroscopy method for ~10.000 peptid ...
Read Project

 10

 FINISHED 
The principal objective of the NORS project is to improve the quality and validation of the products delivered by the GMES Atmospheric Service (GAS), using independent groundbased remote sensing data from the international Network for the Detection of Atmospheric Composition Change (NDACC). NDACC is a cross-border research network with a strong European contribution, providing high-quality referen ...
Read Project

 11

 FINISHED 

High performance Monte Carlo reactor core analysis (HPMC)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

"Design and safety analysis of nuclear reactors is based on extensive use of computer codes for the coupled calculation of time-dependend neutron transport, thermal-hydraulics and burnup.State-of-the-art methods use deterministic techniques to solve the neutronics equations, which require various approximations for a full core:a limited number of energy groups, application of diffusion theory inst ...
Read Project

 5

 FINISHED 

Regulation of Inflammation (Inflam)

Start date: Sep 1, 2010, End date: Aug 31, 2014,

Despite its fundamental importance, our understanding of the immediate mechanisms directing tissue response and the complex cell-cell communications regulating its resolution remain fairly limited. Moreover, current anti-inflammatory drugs work relatively unspecific as on-off switches, thereby exhibiting considerable side effects. Studies on innate immunity have benefitted from the introduction of ...
Read Project

 1

 FINISHED 
Supercapacitors are essential in electric vehicles for supplying power during acceleration and recovering braking energy. High power and sufficient energy density (per kilo) are required for both an effective power system but also to reduce weight. There are several issues to achieve a high performance/low weight power system that need to be addressed by various groups of scientists and engineer ...
Read Project

 9

 FINISHED 
"The presence of a stratification in a NPP containment is a source of concern, as pockets of hydrogen in high concentration could lead to a deflagration or detonation risk. The objectives of the project are two folds: one is to establish whether in a test sequence representative of a severe accident in a LWR a hydrogen (helium) stratification can be established during part of the transient startin ...
Read Project

 8

 FINISHED 

Processes of Cation Migration in Clayrocks (CATCLAY)

Start date: Jun 1, 2010, End date: May 31, 2014,

The overall objective of CatClay is to provide a scientifically well grounded answer to the following question: Can the migration of actinides and other strongly sorbing radionuclides in clayrock be predicted by coupling models of (i) their sorption equilibria on representative clay minerals and (ii) the diffusion-driven mass transport of radionuclide sorbed and dissolved species in compacted mass ...
Read Project

 7

 FINISHED 
The objectives of MUSTANG are to develop and disseminate a comprehensive set of methodologies and tools for the assessment and characterization of deep saline aquifers for CO2 storage, providing measures of performance and risk that are necessary for a cost-benefit analysis, ensuring public confidence and acceptance and promoting its deployment. Novel CO2 storage specific field investigation techn ...
Read Project

 20

 FINISHED 

Global Ethics in Science and Technology (GEST)

Start date: Feb 1, 2011, End date: Apr 30, 2014,

"GEST aims to explore the role of ethics in science and technology (S&T) policy as it is currently developing both in Europe and in the two main global emerging economies of China and India. S&T ethics has been widely debated in Europe in the last two decades leading to a number of policy initiatives that have influenced the development of new technologies in the European Research Area. The way in ...
Read Project

 5

 FINISHED 
"Solid/liquid chemical equilibrium hypotheses (sorption, solubility, solid-solution formation) are key concepts in the assessment of nuclear waste safety. For radionuclides at trace concentrations this corresponds to constant solution concentrations, or solid/liquid distribution ratios, if environmental conditions remain constant. However, these concepts do not account for irreversible incorporati ...
Read Project

 10

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 

Surfaces for molecular recognition at the atomic level (SMALL)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"The overarching aim of the SMALL ITN project is to train Early Stage Researchers in the field of ‘molecular recognition at surfaces’ from fundamental science to novel applications. For this task, SMALL combines European experts from surface science, nanotechnology, theory, chemical synthesis, physics, biology and industry, and thus takes a highly integrated approach to the training. The researche ...
Read Project

 12

 FINISHED 
"The fundamental objective of the project is the further integration of existing European research facilities to a grid of reaction chambers in a continuation of the EUROCHAMP project. These facilities were created to study the impact of atmospheric processes e.g. on regional photochemistry, global change, as well as cultural heritage and human health effects under as realistic conditions as possi ...
Read Project

 14

 FINISHED 

Recovered Fuels combined with Biomass (RECOMBIO)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

The RECOMBIO project is concerned with developments and demonstrations of innovative approaches to the high efficient co-utilisation of low quality biomasses and Solid Recovered Fuels (SRF) produced from municipal solid waste (MSW) for electricity production and combined heat and power (CHP) usage, at competitive costs, high plant availability, and advanced energy efficiency. The production of qua ...
Read Project

 15