Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
ALMARVI aims at providing cross-domain many-core platform solution, system software stack, tool chain, and adaptive algorithms that will enable massive data-rate image/video processing with high energy efficiency. ALMARVI will provide mechanisms and support for high degree of adaptivity at various system layers that will abstract the variations in the underlying platforms (e.g., due to imperfectio ...
Read Project

 19

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Achieving The Trust Paradigm Shift (ATTPS)

Start date: Jul 1, 2012, End date: Oct 31, 2015,

Trust is an essential prerequisite for connecting people in effective transactions. It builds into the society on elements like security, privacy, transparency, accountability and reputation. European strategy must aim at a strong competitive position in producing trustworthy ICT that bring new attractive ways of living and working that are perceived as trustworthy.The Trust in Digital Life (TDL) ...
Read Project

 12

 FINISHED 
In 2020, mobile and wireless traffic volume is expected to increase thousand-fold over 2010 figures. Moreover, an increase in the number of wirelessly-connected devices to counts in the tens of billions will have a profound impact on society. Massive machine communication, forming the basis for the Internet of Things, will make our everyday life more efficient, comfortable and safer, through a wid ...
Read Project

 24

 FINISHED 
The European Coordinating Body in Maths, Science and Technology Education (ECB) is a large-scale strategic response to the FP7 call to reinforce links between science education and science and technology careers in the private sector through reinforcing the partnership industry/education.The overall aim of the ECB is to increase young Europeans’ interest in mathematics, science and technology (MST ...
Read Project

 29

 FINISHED 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Read Project

 41

 FINISHED 
With the accelerating materials development cycles, the development of simulation approaches for predictive, de-novo characterization and optimization of materials and device properties emerges as a grand challenge to European R&D. A unified multi-disciplinary approach towards the deployment of models, tools, algorithms and simulation and visualization techniques is required to transform isolated ...
Read Project

 10

 FINISHED 
"The main goal of PROSUITE is to develop a framework methodology, operational methods and tools for the sustainability assessment of current and future technologies over their life cycle, applicable to different stages of maturity. The project will apply the methodology for four technology cases with close consultation of the stakeholders involved, which includes cases from biorefineries, nanotech ...
Read Project

 25

 FINISHED 

Suspended Graphene Nanostructures (RODIN)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

The RODIN-project, which seamlessly integrates experimental, industrial and theoretical work, is organized around the concept of suspended single-and few-layer graphene nanostructures and annealed diamond-like carbon films. These structures are ideal for accessing and engineering the intrinsic material properties of graphene. In particular we will focus on engineering and measuring the mechanical ...
Read Project

 10

 FINISHED 

Energy-conscious 3D Server-on-Chip for Green Cloud Services (EuroCloud)

Start date: Jan 1, 2010, End date: Jun 30, 2013,

"Cloud Computing" refers to the emerging environment providing software and hardware services over the Internet or Cloud on demand. These services are provided to millions of Cloud users, in particular Mobile users, by thousands of servers in the data centres. Server power consumption and costs are becoming a great concern in the data centres in which the servers are built with high end, expensive ...
Read Project

 6

 FINISHED 

Transformative, Adaptive, Responsive and enGaging EnvironmenT (TARGET)

Start date: Jan 1, 2009, End date: Oct 31, 2012,

There is a need to reduce the knowledge worker "time-to-competence". The main aim is to develop a new genre of TEL environment that supports rapid competence development within the domains of innovation and project management.The TARGET environment consists of a learning process supported by the TARGET platform, consisting of a main core of a serious game. Here, the learner is presented with compl ...
Read Project

 22

 FINISHED 

REsponding to All Citizens needing Help (REACH112)

Start date: Jul 1, 2009, End date: Jun 30, 2012,

REACH112 will implement an accessible alternative to traditional voice telephony that will be suitable for all. While people with disabilities find it hard to communicate with the existing solutions, REACH112 will provide modes of communication so that they will find a way to communicate in each situation, may it be with a live real-time text conversation, with sign language, with lip reading, wit ...
Read Project

 20

 FINISHED 

ACcelerate Trust in digital life Organisation and Relations (ACTOR)

Start date: Jun 1, 2010, End date: May 31, 2012,

...he fundamental societal issues raised by the introduction of digital technologies, by bringing together European stakeholders to promote trust in digital life.On 24 November 2008, Philips, Microsoft, Nokia and Gemalto took the initiative to establish the Trust in Digital Life Partnership. The coordination action ACTOR supports the TDL Partnership raising awareness of research and its results of tr ...
Read Project

 6

 FINISHED 
This Coordination Action aims to prepare a European Flagship project focussed on "Graphene-Driven Revolutions in ICT and Beyond" (GRAPHENE). The overwhelming current focus on graphene, discovered by A.K. Geim and K. Novoselov in 2004, is driven by the considerable and tantalizing potential that this material offers in conventional as well as radically new fields of ICT applications.Europe can play ...
Read Project

 9

 FINISHED 

Smart Objects For Intelligent Applications (SOFIA)

Start date: Jan 1, 2009, End date: Mar 31, 2012,

"The mission of the SOFIA project is to create a semantic interoperability platform and selected set of vertical applications to form an embedded system based smart environment.We vision smart environment application and services where all the information user wants, needs and should know from local place is easily available. A key factor in these smart environments will be a common, open way of a ...
Read Project

 18

 FINISHED 

Usability of Music for Social Inclusion of Children (UMSIC)

Start date: Sep 1, 2008, End date: Aug 31, 2011,

The aim of this multidisciplinary and trans-national SandT project is to develop and use up-to-date technology in a coordinated, intelligent and accessible way to support social inclusion. Whilst intended for all children, UMSIC aims to particularly support, through music, those children who are at increased risk of being marginalized. These include children with social or emotional disorders (or ...
Read Project

 8

 FINISHED 
This Trilogy proposal is for a 3-year Integrated Project targeting Challenge 1 of the 7th Framework Programme: "Pervasive and Trusted Network and Service Infrastructures". The project scope lies entirely within Objective 1.1, "The Network of the Future".The aim of the project is to develop new solutions for the control architecture of the Internet that remove the known and emerging technical defic ...
Read Project

 12

 FINISHED 

Pan-European Laboratory Infrastructure Implementation (PII)

Start date: Jun 1, 2008, End date: Mar 31, 2011,

PII addresses the need for large-scale testing facilities in the communications area by implementing an infrastructure for federating testbeds. The central objective of PII is to create a testbed federation among regional innovation clusters in Europe. This will enable companies participating in these clusters to test new communication services and applications across Europe. The testbed federatio ...
Read Project

 22

 FINISHED 

Effective Multilingual Interaction in Mobile Environments (EMIME)

Start date: Mar 1, 2008, End date: Feb 28, 2011,

The EMIME project will help to overcome the language barrier by developing a mobile device that performs personalized speech-to-speech translation, such that the a user's spoken input in one language is used to produce spoken output in another language, while continuing to sound like the user's voice. Personalisation of systems for cross-lingual spoken communication is an important, but little exp ...
Read Project

 6

 FINISHED 

Computer Aided Cryptography Engineering (CACE)

Start date: Jan 1, 2008, End date: Dec 31, 2010,

Development of hardware devices and software products is facilitated by a design flow, and a set of tools (e.g., compilers and debuggers), which automate tasks normally performed by experienced, highly skilled developers. However, in both hardware and software examples the tools are generic since they seldom provide specific support for a particular domain. The goal of this project is to design, d ...
Read Project

 13

 FINISHED 

Sound And Music for Everyone Everyday Everywhere Every way (SAME)

Start date: Jan 1, 2008, End date: Dec 31, 2010,

Music making and listening are a clear example of a human activity that is above all interactive and social, two big challenges for the new communication devices and applications. However, to date music making and listening is usually a passive, non–interactive and non-context sensitive experience. The current electronic technologies, with all their potential for interactivity and communication, h ...
Read Project

 5

 FINISHED 

European Ambient Assisted Living Innovation Alliance (AALIANCE)

Start date: Jan 1, 2008, End date: Mar 31, 2010,

Subject of the Coordination Action AALIANCE will be Ambient Assisted Living (AAL) solutions based on advanced ICT technologies for the areas of aging at work, aging at homed and aging in the society. AALIANCE will- provide a framework for stakeholders, led by industry, to define research and development priorities, timeframes and action plans on strategically important issues in the field of Ambie ...
Read Project

 15

 FINISHED 

End-to-End Efficiency (E3) (E3)

Start date: Jan 1, 2008, End date: Dec 31, 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Read Project

 23

 FINISHED 

Support Action for the NEM European Technology Platform (4NEM)

Start date: Oct 1, 2007, End date: Nov 30, 2009,

In 2004, the Networked and Electronic Media (NEM) industrial sector launched the NEM European Technology Platform. Three years later, the NEM community has grown to more than 500 members.In the early time of FP7, the NEM platform intends to help to the birth of the NEM industry sector, develop its influence on the European organisations, and improve its presence on the international scene.The 4NEM ...
Read Project

 16

 FINISHED 

Generic Embedded System Platform (GENESYS)

Start date: Jan 1, 2008, End date: Jun 30, 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Read Project

 25