Search for European Projects

31 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Read Project

 18

 FINISHED 

Calcium- and light signals in photosynthetic organisms (CALIPSO)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"CALIPSO is a genuine interdisciplinary and intersectorial research network composed of nine academic research institutions and three industrial partners, thus presenting an example of true translational research and training of young researchers in communicating and transferring achievements from different model organisms directly to industrial partners. CALIPSO aims at identifying environmentall ...
Read Project

 11

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 

Inclusive Growth Research Infrastructure Diffusion (INGRID)

Start date: Feb 1, 2013, End date: Jan 31, 2017,

Referring to the increasingly challenging EU2020-ambition of Inclusive Growth, the objectives of the InGRID project are to integrate and to innovate existing, but distributed European social sciences research infrastructures on ‘poverty and living conditions’ and ‘working conditions and vulnerability’ by improving the transnational data access, organising mutual knowledge exchange and improving me ...
Read Project

 17

 FINISHED 
"SEWPROF aims to develop inter-disciplinary and cross-sectoral research capability for the next generation of scientists working in the newly-emerging field of sewage epidemiology. It will provide an integrated approach towards public health monitoring at a community level based on innovative sewage epidemiology techniques. The approach will deliver real-time profiling of community-wide health and ...
Read Project

 11

 FINISHED 
"Cellulose, the primary structural component of plants, is the most ubiquitous and abundant organic compound on the planet. When cellulose fibrils are processed under carefully controlled conditions, it is possible to release highly crystalline nano-particles known as “nano crystalline cellulose (NCC)”. Recently, NCC-FOAM partners have developed a unique technique for self-assembling NCC into high ...
Read Project

 13

 FINISHED 

European Medicines Research Training Network (EMTRAIN)

Start date: Oct 1, 2009, End date: Sep 30, 2016,

EMTRAIN is an essential element for the success of the IMI Education & Training (E&T) Call Topics in Europe (current and future). It will establish a pan-European platform of excellence for education and training covering the whole life-cycle of medicines from basic research through clinical development to pharmaco-vigilance. It will underpin the successful delivery of the current and future IMI-f ...
Read Project

 32

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

Advanced Immuno-neuro-endocrine Diagnostics in Psychiatry (PSYCH-AID)

Start date: Jun 1, 2012, End date: May 31, 2016,

"The current diagnosis of psychiatric disorders such as schizophrenia and mood disorders, is highly subjective, due to the lack of empirical markers or objective tests specific for these diseases. PSYCH-AID searchers to fill the gap thrpugh the in-parallel study of schizophrenia and mood disorder patients combining, validating and registering 4 sets of biomarker tests already in advanced stage of ...
Read Project

 11

 FINISHED 

Biomarker for Cardiovascular Risk Assessment in Europe (BiomarCaRE)

Start date: Oct 1, 2011, End date: Mar 31, 2016,

Biomarkers are considered as tools to enhance cardiovascular risk estimation. However, the value of biomarkers on risk estimation beyond European risk scores, their comparative impact among different European regions and their role in the drive towards personalised medicine remains uncertain.Based on harmonised and standardised European population cohorts we have built significant research collabo ...
Read Project

 31

 FINISHED 
The COMTES project has as goal to develop and demonstrate three novel systems for compact seasonal storage of solar thermal energy. These systems will contribute to the EU 20-20-20 targets by covering a larger share of the domestic energy demand with solar thermal energy.Main objective of COMTES is to develop and demonstrate systems for seasonal storage that are significantly better than water bas ...
Read Project

 11

 FINISHED 
The concept of METACODE is to preform genetic code engineering in microbial strains with parallel recruitment of novel bio-orthogonal chemistries for mass production of desired protein/peptide based products. In combination with computational and classical chemical synthetic approaches as well as chemo-informatics, enzyme guided evolution, synthetic metabolism, and directed evolution of microbial ...
Read Project

 8

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

Trans-national Infrastructure for Plant Genomic Science (transPLANT)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

Food and energy security are major challenges facing humanity in the coming decades. The falling costs of nucleotide sequencing are opening up significant opportunities for crop improvement through plant breeding and increased understanding of plant biology; in particular through interpreting the growing volume of plant genomics data in the context of phenotype. However, at present, there is no a ...
Read Project

 11

 FINISHED 

HOBBIT - The Mutual Care Robot (HOBBIT)

Start date: Nov 1, 2011, End date: Aug 31, 2015,

Description World players in home care robotics tend to focus on pragmatic single function systems (USA) or humanoid robots (Japan, Korea). HOBBIT zooms in on the interaction between robot and owner/user with a new, more user-centred concept called “Mutual Care". It allows and entices people to "take care" of the robot like a partner, so the ...
Read Project

 7

 FINISHED 
The ebbits project aims to develop architecture, technologies and processes, which allow businesses to semantically integrate the Internet of Things into mainstream enterprise systems and support interoperable real-world, on-line end-to-end business applications. It will provide semantic resolution to the IoT and hence present a bridge between enterprise applications, people, services and the phys ...
Read Project

 9

 FINISHED 
The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Read Project

 20

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
"Climate Change is one of the most important issues facing the world in the 21st century and challenges all four (ecological, economical, social and cultural) dimensions of sustainable development. Europe takes a leading role in the necessary response to these challenges. Severe impacts are unavoidable and European adaptation strategies must be supported by a coherent base of knowledge on its key ...
Read Project

 23

 FINISHED 
Within this framework, the main objective of the project is to develop and prove new approaches for through-life asset management for selected technologies and application scenarios.This will be done by considering all life cycle phases of the technologies concerned in view of their cost efficiency, environmental performance and safety. Special emphasis will be given to the identification, elabora ...
Read Project

 19

 FINISHED 
The development and implementation of bio-refinery processes is an absolute necessity and the key to meet the vision towards bio-based economy. The EuroBioRef concept is an integrated, sustainable and diversified bio-refinery involving all biomass value chain stakeholders. The latter will allow large-scale research, testing, optimisation and demonstration of processes in the production of a wide r ...
Read Project

 34

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 

Greenhouse gas management in European land use systems (GHG Europe)

Start date: Jan 1, 2010, End date: Sep 30, 2013,

The GHG-Europe project aims to improve our understanding and capacity for predicting the European terrestrial carbon and greenhouse gas (GHG) budget by applying a systematic, comprehensive and integrative approach. GHG-Europe quantifies the annual to decadal variability of the carbon and GHG budgets of terrestrial ecosystems in EU27 plus Switzerland and in six data-rich European regions via data-m ...
Read Project

 44

 FINISHED 
The objective of CoReNet is to address consumer needs and expectations of wide range of European citizens as well as specific target groups - such as elderly, obese, disabled, or diabetic persons -by supplying small series of functional and fashionable clothes and footwear of high quality, affordable price and eco-compatibility. Therefore the European Textile, Clothing and Footwear Industry wil ...
Read Project

 14

 FINISHED 

Surfacing System for Ship Recovery (SuSy)

Start date: Sep 1, 2009, End date: Feb 28, 2013,

The propagation of spillages is one of the biggest environmental problems after a ship disaster. Instead of cleaning the dirty areas the SUSY system will avoid the spillages by stabilizing vessels immediately after an accident. The main goal of the project is the development of well known submarine rescue technology into systems usable for merchant ships in emergency situations. The systems for su ...
Read Project

 9

 FINISHED 
Main aim of the project is the development of a complete, integrated process chain for the cost effective serial production of various aerospace CFRP stiffener profiles. The production is foreseen in the two steps: Preform manufacturing and infiltration / curing. The project will focus on complex profile geometries with variable cross sections, single or multiple curvature and integrated load int ...
Read Project

 20

 FINISHED 
What does European industry need to know about “time”? Although there is a wide-spread belief that low-cost-production companies will gain market share over more expensive competitors there are considerable opportunities for more expensive producers as long as they provide a certain value-added for their customers: customized products and at the same time much faster delivery. We are suggesting th ...
Read Project

 5

 FINISHED 

Highly Automated Vehicles for Intelligent Transport (HAVE-it)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

Description The groundbreaking HAVEit proposal aims at the long-term vision of highly automated driving. Within this proposal important intermediate steps will be developed, validated and demonstrated. These intermediate results on the one hand offer high potential for exploitation within 3-5 years after HAVEit and on the other hand form the ...
Read Project

 29

 FINISHED 
In order to establish cost-efficient innovative solutions for safety and security systems , self-controlled machine monitoring and user-friendly human-machine interfaces, it is necessary that items are able to communicate bidirectional which is realized by advanced sensor functions. Therefore, devices using novel sensor concepts manufactured via high-throughput processes on cost-efficient, flexibl ...
Read Project

 10

 FINISHED 

PRE-DRIVE

Start date: Jul 1, 2008, End date: Sep 30, 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ ...
Read Project

 27

 FINISHED 

GEOSS INSPIRE and GMES an Action in Support (GIGAS)

Start date: Jun 1, 2008, End date: May 31, 2010,

The GEOSS INSPIRE and GMES an Action in Support (GIGAS) promotes the coherent and interoperable development of the GMES, INSPIRE and GEOSS initiatives through their concerted adoption of standards, protocols, and open architectures. Given the complexity and dynamics of each initiative and the large number of stakeholders involved, the key added value of GIGAS is bringing together the leading organ ...
Read Project

 20