Search for European Projects

36 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...on/Welding, Motor Vehicles, Hairdressing and Health & Social Care, over a two year period. Our partners are comprised of 2 vocational organisations in Germany and Finland and 1 Enterprise and the Ministry for Transport and Infrastructure, both of which are in Malta. They are experienced host partners and we have collaborated on projects beforehand which were very successful with excellent fee ...
Read Project

 5

 FINISHED 

SERC Mobility

Start date: Jun 1, 2015, End date: May 31, 2017,

...ccompany their learners on their pre-existing traineeships with local pastry and bakery businesses. The construction learners will complete their traineeship within two departments of the Maltese Ministry for Transport and Infrastructure, working in project teams on large scale development projects. The total budget requested for 44 learners and 16 accompanying staff is €117,184.00. The project ob ...
Read Project

 3

 FINISHED 

Güneşten Elektrik Enerjisi Elde Etme ve Konutlarda Kullanımı

Start date: Jun 1, 2015, End date: May 31, 2016,

... is a developed country as public and private sectors in the solar energy field. Thus it is the world leader in using the latest and modern technologies in the field of solar energy. The ministry of Turkish Energy and Natural Sources cares alternative energy sources, too. It encourages individual studies on energy production. Beyond this, the government guarentees to buy the electricity wh ...
Read Project

 4

 FINISHED 
...y, and birds linked to water bodies or to open and steppic environments, all of which are included in Annex I of the Birds Directive. An Infrastructure and Transport Strategic Plan, drawn up by the ministry of public works, proposes the introduction of more than 7 000 km of new high-performance lines during the period 2005-2020. This has important consequence for several Natura 2000 sites. Speci ...
Read Project

 5

 FINISHED 
... and different recharging methods. Results The DemoEV project, led by the MTI in collaboration with the Ministry for Gozo, Transport Malta, and the Enemalta Corporation, demonstrated, tested and evaluated the implementation of electro-mobility in Malta. A key innovation was that DemoEV vehicles were dri ...
Read Project

 4

 FINISHED 
...oject results developed scaled-size transmission and reverberant chambers, which can reduce human and material inputs during the design and development of acoustic barriers. Italy’s Ministry of Transport and Public Work has confirmed its willingness to include the project’s validated materials in the Building Catalogue. Further information on the project can be found in the project's layman ...
Read Project

 5

 FINISHED 
...construction’ in the form of a handbook that included technical specifications of rubberised asphalt mixtures for use in road construction. Specifications were submitted to the Ministry of Development, Competitiveness, Infrastructure, Transport and Networks. The formal adoption of these specifications in Greece, through new legislation, should lead to a significant reduction in the amount of sto ...
Read Project

 4

 FINISHED 

Centre for Eco-Friendly City Freight Distribution (CEDM)

Start date: Nov 1, 2005, End date: Apr 30, 2008,

...2,8 dBA or 8,6 dBA respectivelyThese positive results form the basis on which the Municipality’s action can develop further, after having tested and validated the most suitable solutions. The Ministry of Environment granted additional funds needed to implement the full-scale system, which will be operative starting from early 2009. This is expected to lead to a decrease in the number of circulat ...
Read Project

 7

 FINISHED 

Living River Lahn - one river, many interests (Living River Lahn)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

...tential of the Lahn is rated as ‘unsatisfactory’ or ‘bad’, according to WFD criteria. Furthermore, the ‘National report on the status of floodplains 2009’ of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety reports a ‘significantly modified’ to ‘heavily modified’ status of floodplains for the major part of the Lahn’s watercourse. The lower par ...
Read Project

 5

 FINISHED 

Developing of Motorways of Sea system in Adriatic region (AdriaticMos)

Start date: Feb 28, 2011, End date: Feb 27, 2014,

...- to produce a sound communication system with all regions concerned to the enhancement of MoS, as well as to promote the involvement of the interested stakeholders AdriaticMoS is a common project of Ministry of Transport of all Adriatic countries with the aim of creation of unique and common strategic development document for development of Motorways of the Sea system. Adriatic MoS Master Plan is ...
Read Project

 8

 FINISHED 
...f the Waste Communication Platform and extension of hazwaste cooperation activities throughout the BSR was developed and backed by the provision of an interim 12-month solution – sponsored by the Ministry of the Environment of Schleswig-Holstein - to host ongoing cooperation until new funding resources are found.
Read Project

 7

 FINISHED 
...f contaminated dredged material of the Elbe river (Germany) and its posterior deposition ashore. From the beginning of the 80s, a project was commissioned with the aid of the German Federal Ministry of Research and Technology. This project concerned the construction of the METHA I test plant (MEchanical Treatment and dewatering of HArbour sediments), and the METHA II pilot plant. The METHA plant i ...
Read Project

 9

 FINISHED 

Intelligent Transportation for Dynamic Environment (InTraDE)

Start date: Oct 2, 2007, End date: Mar 30, 2014,

...result, a two year International Masters degree in robotics and transport is proposed for the next academic year. This Masters degree course has recently received accreditation from the French ministry of education and scientific research and is delivered jointly by two elite engineering institutions in France: "Polytech-Lille" and "Ecole Centrale de Lille". The course is taught in english and bui ...
Read Project

 7

 FINISHED 

North East Cargo Link (NECL)

Start date: Dec 31, 2002, End date: Dec 2, 2006,

...established very good cooperation with Russian partners. NECL has signed the letter of co-operation with the Euro Asian Transport Union (EATU) which is a big organization sanctioned by the Russian Ministry of Transport.
Read Project

 45

 FINISHED 
...ve supervision of their removal from the navigation fairway, but in accordance with international regulations and standards. Priority areas will be selected by the Mine Action Centre, Plovput and the Ministry of Infrastructure. Those locations will be verified by the project.
Read Project

 1

 FINISHED 
The GeoERA proposal is put forward by the national and regional Geological Survey Organisations (GSO) of Europe. Its overall goal is to integrate the GSO’s information and knowledge on subsurface energy, water and raw material resources, to support sustainable use of the subsurface in addressing Europe’s grand challenges. The GeoERA consortium will organise and co-fund together with the EC a joint ...
Read Project

 45

 FINISHED 
BIG HIT will create a replicable hydrogen territory in Orkney (Scotland) by implementing a fully integrated model of hydrogen production, storage, transportation and utilisation for heat, power and mobility. BIG HIT will absorb curtailed energy from two wind turbines and tidal turbines on the islands of Eday and Shapinsay, and use 1.5MW of PEM electrolysis to convert it into ~50 t pa of hydrogen. ...
Read Project

 12

 FINISHED 
The Sava River is classified as a international waterway class IV from the border of the Republic of Serbia (rkm 211) to Sisak (rkm 594). Currently, the Sava river waterway does not meet the required navigation parameters of international waterway class IV and does not allow for smooth navigation on 300 days/year for vessels with a maximum draft of 2.5 metres.This project will result in the improv ...
Read Project

 1

 FINISHED 

International ship winter shelter on the Danube in Croatia

Start date: Dec 31, 2010, End date: Dec 30, 2018,

Increase of the waterway traffic on the Danube river and port Vukovar, sets demands for building bigger winter shelter on the wider area of Vukovar. Winter shelter is natural or artificial body of water in the waterways which is equipped and trained to provide safe shelter and in conditions of ice on the waterways.Existing natural winter shelter in Opatovac is the only winter shelter on Danube riv ...
Read Project

 1

 FINISHED 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Start date: May 1, 2014, End date: Apr 30, 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Read Project

 72

 FINISHED 

Concerted Action EPBD IV (CAIV_EPBD)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

The 'Concerted Action EPBD IV', supporting transposition and implementation of Directive 2010/31/EC of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings, is an activity which aims to foster exchange of information and experience among Member States and participating countries with regards to the implementation of the specific Community legislation and ...
Read Project

 29

 FINISHED 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Read Project

 38

 FINISHED 

Regulation works on the Danube river on km 1,323 (Sotin)

Start date: Dec 31, 2010, End date: Dec 30, 2016,

The Danube River near the village of Sotin at 1322 km threatens the removal extremely dilapidated right coastline which might result in the undermining and collapse of a high bank on which is the village and the local church. Beside the village, with the removal of the coast, the Danube would directly endanger the archaeological site of the old Roman settlement.Examining the cartographic displays ...
Read Project

 1

 FINISHED 
The Sava River waterway, being the longest waterway in Croatia is presently severely underused, river transport being limited to scarce traffic on small river sections of the waterway. The Sava River is navigable over a stretch of 594 km (starting from the confluence with the Danube, according to the brand new river chainage) and links the economies of the four Sava riparian states of Slovenia, Cr ...
Read Project

 1

 FINISHED 
Lacking information about public transport is often an obstacle for travellers to use public transport at all. This is an even bigger challenge when travelling by sustainable transport modes to and within destinations of the Alpine Space, where often cross-border information is needed. This project aims to provide travellers with comprehensive information about sustainable transport modes beyond r ...
Read Project

 13

 FINISHED 

Strategies and tools for Real Time EArthquake RisK ReducTion (REAKT)

Start date: Sep 1, 2011, End date: Dec 31, 2014,

Earthquakes are a serious threat for many European countries, particularly those around the Mediterranean Sea. In many cities exposed to high earthquake hazard, a substantial proportion of the population still lives in buildings that do not meet modern earthquake-resistant standards. Preventive actions, such as retrofitting of structures, are essential, but they are not sufficient and cannot be a ...
Read Project

 23

 FINISHED 

Rail Hub Cities for South East Europe (RAIL4SEE)

Start date: Apr 30, 2012, End date: Oct 30, 2014,

The challenge that the RAIL4SEE partners share is the development of models, concepts, measures, harmonised strategies and policy actions targeted to the improvement of rail and intermodal transport in SEE. In particular partners call for complementary interventions facing the alleviation of barriers for rail hubs integration in the local, regional, transnational and TEN-T systems, transport servi ...
Read Project

 28

 FINISHED 
The intensification of trade in the Mediterranean area has been identified as a top priority under the European Neighbourhood Policy. In particular, the Action Plans for Lebanon and Jordan stress on the importance of improving the export potential of both countries by further liberalising trade in goods and simplifying customs legislation and procedures. Taking into account these objectives, CUSTO ...
Read Project

 6

 FINISHED 

Adriatic - Danube - Black Sea multimodal platform (ADB multiplatform)

Start date: Mar 31, 2012, End date: Sep 29, 2014,

The idea of the project is to develop and promote environmentally friendly, multimodal transport solutions from the ports in the SEE programme area (Black Sea, Aegean, Adriatic) to inland countries and regions along a selected pilot transnational network. This will be done by developing and establishing a "multimodal transport development platform", which integrates different regions and stakehold ...
Read Project

 43

 FINISHED 

Green Intermodal Freight Transport (GIFT)

Start date: Feb 29, 2012, End date: Aug 30, 2014,

The main aim of the current project is to map, analyze, and evaluate the status of the transport sector in the GIFT transport network and propose new policies and strategies in infrastructure, processes, assets, ICT, legislation, norms and harmonization/ standardization issues, in order to promote innovative green intermodal freight transport corridors. GIFT project will drill down in three Pan-Eu ...
Read Project

 27

 FINISHED 

Harmonised eCall European Pilot (HeERO)

Start date: Jan 1, 2011, End date: Jun 30, 2014,

The HeERO project will prepare, carry-out and coordinate eCall pre-deployment pilots at European level taking into account the approved standards. The overall project objective is to prepare for the deployment of the necessary infrastructure in Europe with the aim of making the Pan-European in-vehicle emergency call service eCall a reality.In order to address the eCall interoperability which would ...
Read Project

 39

 FINISHED 
The Alpine and the Carpathian Conventions state sustainable tourism mobility as a challenge and call for cooperation on this topic among the countries of these mountain regions. In particular sustainable tourist mobility is not well-developed in mountainous regions, especially in South-East Europe, as mountain regions are lacking sufficient sustainable transport facilities and facing major ecologi ...
Read Project

 32

 FINISHED 

Sustainable coast MOBility in the ADRIatic area (ADRIMOB)

Start date: Jan 31, 2011, End date: Jan 30, 2014,

ADRIMOB involves the main ports of Adriatic cross-border area. Venice, Ravenna, Rimini, Cesenatico, Pesaro-Urbino, Pescara, Brindisi, Bari, Rovinj, Rab, Spalit, Durres, Bar, Igoumenitsa and the main ports of Slovenian area. The involved partners gathered their efforts with the purpose of defining a project generating concrete solutions to real problems: improvement and upgrade the accessibility in ...
Read Project

 15

 FINISHED 

North Sea Ballast Water Opportunity (NSBWO)

Start date: Dec 31, 2008, End date: Dec 30, 2013,

Ships ballast water is a main source of acute and chronic pollution in the North Sea. The project aims to improve the North Sea environment and economy by facilitating the ratification of the Ballast Water Management Convention (BWMC). The implementation of the BWMC creates a new market for innovative products; Ballast Water Opportunity aims to support the NSR industry to enter this market. It enc ...
Read Project

 45

 FINISHED 

South East Transport Axis (SETA)

Start date: Dec 31, 2010, End date: Dec 30, 2013,

Together with the projects SoNorA, BATCo, SCANDRIA North and SEETAC (Central Europe, Baltic Sea, SEE Programme), SETA is aiming on the analysis and development of the transport corridors from Scandinavia to South-East Europe. Competitive Accessibility of regions is one of the most important preconditions for their economic growth and development (as the project SIC! has shown). Fluent transport of ...
Read Project

 25

 FINISHED 
Transnational cooperation on transport crisis management due to incidents in tunnels and rare strong natural events is an outstanding challenge for Alpine Space security and emergency authorities. TranSAFE-Alp aims at capitalizing innovative decision making tools already developped in previous ASP projects for the creation of an integrated ICT-share area for jointly support and coordinated interve ...
Read Project

 12