The main challenge of NEWADA duo (Network of Danube Waterway Administrations - data & user orientation) is to level out the differences of the quality of service of the Danube waterway infrastructure. Thus, the main project goal consists of establishing a common level of service in waterway management along the entire Danube, focusing on an efficient waterway infrastructure and customer-oriented s ...
Read Project

 9

 FINISHED 
The Danube is one of the priority areas for WWF’s global freshwater program, with key contributions in freshwater habitat conservation, water stewardship and water security. It is the most international river in the world, flowing through 10 countries and 4 national capitals on its 2,800 km stretch from the Black Forest to the Black Sea.Providing suitable alluvial habitats on Liberty Island and it ...
Read Project

 4

 FINISHED 

Network of Danube Waterway Administrations (NEWADA)

Start date: Mar 31, 2009, End date: Mar 30, 2012,

The objective of waterway administrations is to maintain and improve the Danube waterway for inland navigation, to deploy services for the inland navigation sector and at the same time to preserve and protect the Danube as a habitat. Due to a lack of international cooperation and coordination between waterway authorities up to now taken measures and activities are insufficient. The objective of NE ...
Read Project

 20

 FINISHED 

Reconstruction Planning of Baja-Bezdan Canal (RPBBC)

Start date: Aug 31, 2010, End date: Feb 28, 2012,

The target area of this particular project is the Baja-Bezdán canal. The Baja-Bezdán canal starts at Baja with an outlet from the Sugovica and 44 kilometres to south connects to the Duna-Tisza canal. Its length is 33 km on the Hungarian territory and passes the administrative regions of 7 settlements. On the Serbian side it crosses further 3 settlements and also nature reserves on both sides. Aim ...
Read Project

 2

 FINISHED 
“DANewBE Data” sets up close co-operation between waterway administrations along the Danube waterway, including those from relevant new Member States. The project aims at the provision of interoperable navigation supporting services for inland waterways. Feasibility studies and pilot operations shall ensure sound and high-quality preparation of data, accurate positioning signals, efficient exchang ...
Read Project

 12

 FINISHED 
In order to reduce damage by flood and to create equal capabilities for protection, it has become reasonable to prepare and implement dike reinforcement works along the section between the state border and Homorúd. Design works had to be launched from the state border, in the first phase in the section between 0+000-2+100 tkm within the territory of Bács-Kiskun County. Floods represent a frequent ...
Read Project

 2

 FINISHED 
Vast flatland areas stretching along the left bank of the Danube in Hungary and Serbia (from Baja to Bezdan), facing a threat of serious floods, are remarkably interconnected. For these reasons, comprehensive co-operation related to flood prevention activities was established between the two countries in 1955 and has been continuously developed. Areas threatened by floods in both countries are pro ...
Read Project

 2

 FINISHED 
The proposals formulated in the project aim to increase flood protection security along the common Danube section of Hungarian-Serbian interest. Modernization of the water level and water output measuring station at Baja cannot be postponed any longer. Later on the modernized Baja station can serve as a reference for the establishment of other main stations along the Danube section concerned (appr ...
Read Project

 2