Search for European Projects

32 European Projects Found

Searched on 125080 European Projects

 FINISHED 
..., space or energy sectors, where conventional process engineering and test/error methods are not completely efficient.INTEFIX aims to increase the performance of the machining processes by the use of intelligent fixture systems, allowing the monitoring, control and adaptation of the process to obtain suitable results according to precision, quality and cost requirements.The main outcome of INTEFIX ...
Read Project

 33

 FINISHED 
...articular for those components that influence safety and secu-rity. With this project, EnCo Software wants to change this situation through an innovative approach and provide businesses with an intelligent tool for the development process, which integrates all individual tasks/documents and results in development of all components of an E/E/PE systems in one process. The SafetyOffice X2 (SOX2)-Clo ...
Read Project

 1

 FINISHED 
Objectif général :Parmi les sources dincidents techniques majeurs dans les trains, figure le système PAC (Pantographe-Caténaire) qui garantit lalimentation des trains électriques en énergie. Les recherches effectuées dans le cadre du projet PACIFIC visent à moyen terme à réduire considérablement les pannes dues au système PAC des trains. Le projet a en effet, pour but la conception et le développe ...
Read Project

 3

 FINISHED 

Information System on the Eutrophication of our Coastal Areas (ISECA)

Start date: Jul 31, 2009, End date: Jun 29, 2014,

...cts aim is to advance scientific knowledge related to eutrophication (i.e. algal blooms), which is a major cause of the decreasing quality of coastal waters in the 2 Seas area. This more targeted and intelligent information will then be disseminated amongst the relevant authorities, environmental agencies and the general public.A technologically advanced information system will be developed thanks ...
Read Project

 8

 FINISHED 
...prime objective is to generate in excess of €22million profits for the participating companies by addressing a European need for the safe maintenance and inspection of power lines. Intel-Line is an intelligent automatic, inspection system using advanced ultrasonics and incorporating wireless transmission and energy harvesting to provide a ‘fit and forget’ condition monitoring and failure alarm sys ...
Read Project

 4

 FINISHED 

ROS-Industrial quality-assured robot software components (ROSIN)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

ROSIN will create a step change in the availability of high-quality intelligent robot software components for the European industry. This is achieved by building on the existing open-source “Robot Operating System” (ROS) framework and leveraging its worldwide community. ROS and its subsidiary ROS-Industrial (European side led by TU Delft and Fraunhofer) is well-known, but its European industrial p ...
Read Project

 7

 FINISHED 
In this project, Dr. Ignacio Alvarez Illan proposes to develop a novel automated diagnosis system that supports the radiologist in the breast cancer diagnosis in Dynamic Contrast Enhance-Magnetic Resonance Imaging (DCE-MRI) by including critical components of the radiological work-flow such as motion compensation, segmentation and diagnosis of breast tumours. The expected results of this interdisc ...
Read Project

 1

 FINISHED 

Electronic security for OIL/LPG tanks (E-LOCKS)

Start date: May 1, 2015, End date: Aug 31, 2015,

...the e-LockS solution. It is an integrated SW and HW architecture system based on two main components:- Caplock®: cap with the electronic lock integrated to be installed in each tank. - e-key®: intelligent key which will be managed from the Oil/LPG distribution management system (assignment of the permission to open a single tank and/or group of tanks).
Read Project

 1

 FINISHED 
...sing variability of both supply and consumption will also require more sophisticated and optimized decision making.To achieve a step change in water and energy savings we propose to apply and test an intelligent ICT system for "real time abstraction & discharge monitoring". This will create an open, scalable, marketable and user-friendly system to optimise water resource management and replace the ...
Read Project

 13

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

...bility, energy efficiency, very small footprint,low cost and faster reconfigurability (microsecond regime) as they are particularly required in this segment of the network and, in conjunction with an intelligent control and management plane, it will empower future software defined networking (SDN).This novel integrated switch architecture is also suitable for Data Center networking due to its capa ...
Read Project

 8

 FINISHED 
A (Meta-) product is now a customer driven customisable entity that integrates sensory/computing units, which are in turn connected to the cloud, leading to a paradigm shift from mass production to intelligent, over-the-web configurable products. Product design and production is however becoming highly complex and requires interdisciplinary expertise. The goal of EASY is to develop new methodologi ...
Read Project

 12

 FINISHED 

Interoperable Trust Assurance Infrastructure (INTER-TRUST)

Start date: Nov 1, 2012, End date: Apr 30, 2015,

...e the results using two different case studies with complex, highly demanding critical services. The two case studies, E-voting and Vehicle-to-Vehicle and Vehicle-to-Infrastructure Communications for Intelligent Transport Systems, involve key European players and will perfectly illustrate the importance and cross-domain applicability of the INTER-TRUST's results and offer unique opportunities for ...
Read Project

 6

 FINISHED 

Integrated Platform for Autonomic Computing (IPAC)

Start date: May 1, 2008, End date: Feb 28, 2011,

The IPAC (Integrated Platform for Autonomic Computing) proposal aims at delivering a middleware and service creation environment for developing embedded, intelligent, collaborative, context-aware services in mobile nodes. IPAC relies on short range communications for the ad hoc realization of dialogs among collaborating nodes. Advanced sensing components leverage the context-awareness attributes o ...
Read Project

 6

 FINISHED 
... suitable services to a user through the analysis of his/her context. Therefore, driven by industrial pilot cases, Sense&React will:•\tImplement and validate ICT reference architecture for enabling intelligent management of manufacturing information in real-time and that can be used to develop context-aware applications for the industrial factory-floor. Sense&React will develop the necessary har ...
Read Project

 13

 FINISHED 
Welding workshops operated by SME companies are a basic unit of industrial manufacturing. Economic pressures are forcing these firms to find solutions for wasteful and time consuming tasks, like creation of custom clamping assemblies for each set of pieces to be welded. The design and fabrication of the clamping assembly itself involves time and costs both for design and fabrication. These clampin ...
Read Project

 9

 FINISHED 
...essary. Considering different aspects of CRP/GRP-products it is obvious, that only non-destructive technologies like 3D-computer tomography, thermography and ultrasonic scanning in correlation with intelligent software solutions will lead to significant and evaluable results.The overall aim is to achieve a comparable and measurable quality standard for CRP/GRP products. This will prepare applied C ...
Read Project

 7

 FINISHED 

Safe and Efficient Electrical Vehicle (eFuture)

Start date: Sep 1, 2010, End date: Nov 30, 2013,

The idea of intelligent vehicles that cope with safety requirements and adapt their energy needs is a long-term strategy. We have started our work with successive European research projects in the last years by starting with the development of a drive-by-wire platform, but the combustion engine is still a drawback. eFuture wants to prepare the next generation of electric vehicle based on our first ...
Read Project

 7

 FINISHED 
"Europe has a strong leadership in the domains of intelligent telecommunications, multimedia, and automotive systems. However, the exponential increase in complexity of intelligent systems threatens the European competitiveness.In order to solve today’s challenges of high-complex design for embedded electronic systems, a number of approaches have been tried. Hardware-software codesign is the first ...
Read Project

 6

 FINISHED 
The eHealthMonitor project provides a platform that generates a Personal eHealth Knowledge Space (PeKS) as an aggregation of all knowledge sources (e.g., EHR and PHR) relevant for the provision of individualized personal eHealth services. This is realised by integrating service-oriented architecture, knowledge engineering, multiagent systems, and wearable/portable devices technologies. Innovations ...
Read Project

 11

 FINISHED 

Search engine for MultimediA enviRonment generated contenT (SMART)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

...eb-scale multimedia search framework for multimedia data stemming from the physical world. To this end, SMART will develop a scalable search and retrieval architecture for multimedia data, along with intelligent techniques for real-time processing, search and retrieval of physical world multimedia. The SMART framework will boost scalability in both functional and business terms, while being exten ...
Read Project

 9

 FINISHED 
...s management. The key technological innovations of CAMPUS 21 are (i) integration concepts for energy management systems (WP3) including the related middleware components (WP4), (ii) methodologies for intelligent, optimised control of building services systems (WP5), and finally (iii) algorithms and tools to support load-balancing between renewable micro-generation, storage systems, and energy cons ...
Read Project

 10

 FINISHED 

Smart Vehicle to Grid Interface (SMARTV2G)

Start date: Jun 1, 2011, End date: May 31, 2014,

... among other specific objectives, the development of a new generation of technologies allowing the seamless and user-friendly energy load of electric vehicles in urban environments in the frame of an intelligent energy supply network managed by an embedded control system.In order to be able to achieve the exposed objectives, the project Consortium is comprised of a well-balanced group of 7 partner ...
Read Project

 7

 FINISHED 

Interactive Knowledge Stack for small to medium CMS/KMS providers (IKS)

Start date: Jan 1, 2009, End date: Dec 31, 2012,

... A Semantic-based Open Source Platform for Small to Medium CMS ProvidersIKS will raise the semantic capability of European software houses to develop intelligent content management solutions for their customers. What is IKS? IKS is an integrating project targeted at the hundreds of SMEs in Europe, which are providing technology platforms for conten ...
Read Project

 17

 FINISHED 

xLiMe – crossLingual crossMedia knowledge extraction (xLiMe)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Europe is different from other large media markets such as the US or China in that information is being generated in different languages and distributed via diverse streams of localised media channels. Automatic analysis is complicated further by different content types (audio, video, text) and different channels (mainstream, social media). Thus, information can only be analysed independently for ...
Read Project

 9

 FINISHED 

Knowledge Driven Data Exploitation (K-DRIVE)

Start date: Jan 1, 2012, End date: Jun 30, 2016,

The development of innovative technology for the discovery new insights (such as trends) of digital data and real time guidance of using digital data is one of the priorities in the areas of semantic technologies. The first objective of this project is the identification of novel query generation techniques to facilitate experts to identify key dimensions within semantic data and to recommend use ...
Read Project

 6

 FINISHED 

Cross-lingual Knowledge Extraction (X-Like)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

The goal of the X-LIKE project is to develop technology to monitor and aggregate knowledge that is currently spread across global mainstream and social media, and to enable cross-lingual services for publishers, media monitoring and business intelligence.In terms of research contributions, the aim is to combine scientific insights from several scientific areas to contribute in the area of cross-li ...
Read Project

 8

 FINISHED 
The project goal is to design and build mobile applications that approach human performance in conversational interaction, specifically in terms of the interactional skills needed to do so. These skills will include recognising and generating conversational speech incrementally in real-time, adapting to new concepts without manual intervention, and personalising interaction. All of these skills wi ...
Read Project

 6

 FINISHED 
Description The project researches the long-term preservation of scientific workflows in order to support the scientific discovery processWf4Ever will develop new models, techniques and tools for the preservation of scientific workflows, including the novel definition of a Research Object, which packages workflow descriptions, the provena ...
Read Project

 7

 FINISHED 

GLOCAL: Event-based Retrieval of Networked Media (GLOCAL)

Start date: Dec 1, 2009, End date: Dec 31, 2012,

We describe the world by using words. Yet, words usually bring to mind different mental views of the world in different individuals, because of their personal experience and context. This is the reason why the "semantic gap" between our conceptualizations of the world, expressed using language, and our experience of the world, whose most direct representations are media, is far beyond the reach of ...
Read Project

 10

 FINISHED 

Service Oriented Architectures for All (SOA4ALL)

Start date: Mar 1, 2008, End date: Apr 30, 2011,

Description Towards a Web of billions of servicesComputer science is entering a new generation, a generation that starts by abstracting from software and hardware components and sees all resources as services in a service-oriented architecture (SOA). With this in mind, the aim of SOA4ALL is to create a 'web of billions of services' and he ...
Read Project

 24

 FINISHED 

ACTIVE: Enabling the Knowledge Powered Enterprise (ACTIVE)

Start date: Mar 1, 2008, End date: Feb 28, 2011,

Description Effective means for supporting the productivity of knowledge workersACTIVE technology aims at increasing the productivity of knowledge workers through tools that leverage hidden factual and procedural knowledge. The project will advance research and integrate technologies to realise the vision of an integrated and contextualis ...
Read Project

 12

 FINISHED 
Description Establishing dynamic links between research and business environmentsCloser alignment and interaction between academia, enterprise and industry as a whole are essential to boost EU socio-economic growth and international competitiveness, especially in innovative fields such as ICT. Within this context, VALUE-IT is aimed at pro ...
Read Project

 5