Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Atmospheric simulation chambers are the most advanced tools for elucidating processes that occur in the atmosphere. They lay the foundations for air quality and climate models and also aid interpretation of field measurements. EUROCHAMP-2020 will further integrate the most advanced European atmospheric simulation chambers into a world-class infrastructure for research and innovation. A co-ordinate ...
Read Project

 16

 FINISHED 

Hybrid Node Modes for Highly Efficient Light Concentrators (HyMoCo)

Start date: Mar 1, 2015, End date: Feb 29, 2020,

The meaning of solar energy for future decentralized power supply will largely depend on both efficiency and cost of solar to electrical power conversion. All kinds of conversion strategies including photovoltaics, concentrated solar power, solar to fuel and others would benefit from efficiently collecting solar power on large areas. For this reason luminescent solar concentrators have been develo ...
Read Project

 1

 FINISHED 
...hire) Ltd United Kingdom, consultants of trade organisations, companies and organisation in UK and Europe: profile development, research and analyses of materials, learning materials production4. Bergische Universität Wuppertal, Institut für Systemforschung der Informations-, Kommunikations- und Medientechnologie, Germany: research and development of profiles, analysing present situation in the Cr ...
Read Project

 6

 FINISHED 
The new working methods focused on BIM (Building Information Modeling and / or Management) require radical changes in all the practices of all stakeholders of an architectural project , and collaborative involvement of all stakeholders to make the best in each business the benefit of this new methodology. It is also a philosophy, a way of working and a tool to enrich and maintain throughout the bu ...
Read Project

 9

 FINISHED 
"Modern critical infrastructures are becoming increasingly “smarter” (e.g. cities). Making the infrastructures “smarter” usually means making them smarter in normal operation and use: more adaptive, more intelligent… But will these smart critical infrastructures (SCIs) behave equally “smartly” and be “smartly resilient” also when exposed to extreme threats, such as extreme weather disasters or ter ...
Read Project

 21

 FINISHED 
Progress in computers and algorithms in the last years has made numerical simulation and modelling a key research methodology in both academia and industry, which in turn drives exascale computing in order to maintain excellence in research and innovation. A disruptive evolution in computer technologies is required for attaining exascale performances in the coming years bringing challenges that ur ...
Read Project

 8

 FINISHED 
StratoClim will produce more reliable projections of climate change and stratospheric ozone by a better understanding and improved representation of key processes in the Upper Troposphere and Stratosphere (UTS). This will be achieved by an integrated approach bridging observations from dedicated field activities, process modelling on all scales, and global modelling with a suite of chemistry clima ...
Read Project

 30

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Read Project

 126

 FINISHED 

Organic Semiconductors for NIR Optoelectronics (OSNIRO)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Scientific targets of the planned project are synthesis, characterization and application of NIR absorbing and emitting organic materials for Organic Electronics. NIR sensitive absorbers show a great potential for the development of a new generation of printable photodetectors with tuneable sensitivity windows that may be integrated into multifunctional devices for chemical/biological sensing or o ...
Read Project

 8

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Novel Methods in Computational Finance (STRIKE)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"In recent years the computational complexity of mathematical models employed in financial mathematics has witnessed a tremendous growth. Advanced numerical techniques are imperative for the most present-day applications in financial industry.The motivation for this training network is the need for a network of highly educated European scientists in the field of financial mathematics and computati ...
Read Project

 11

 FINISHED 

Transfering Implementing Monitoring Equality (GENDERTIME)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

The aim of the GenderTime project is to identify and implement the best systemic approach to increase the participation and career advancement of women researchers in selected institutions where self-tailored action plans are implemented. Institutions involved in GenderTime are intentionally very different in terms of size, discipline, history, etc. in order to experiment in various situations and ...
Read Project

 11

 FINISHED 
Solar photovoltaic (PV) technology is one of the fastest growing sustainable, renewable energy conversion technologies that can help meet the increasing global energy demands. Organic photovoltaic (OPV) technologies are particularly attractive due to their compatibility with low-cost roll-to-roll and printing processing at low temperatures on a wide variety of substrate materials and the lack of s ...
Read Project

 12

 FINISHED 

Nanoelectronic COupled Problems Solutions (nanoCOPS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Designs in nanoelectronics often lead to problems that are large to simulate and that include strong feedback couplings. Industry demands to include variability to guarantee quality and yield. It also requests to incorporate higher abstraction levels to allow for system simulation in order to shorten design cycles, while preserving accuracy. The nanoCOPS project considers the simulation of two pro ...
Read Project

 13

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Read Project

 116

 FINISHED 
DOTSEVEN is a 3.5 year IP proposal for a very ambitious R&D project targeting the development of Silicon Germanium (SiGe) Heterojunction Bipolar Transistor (HBT) technologies with cut-off frequencies (fmax) of around 700 GHz. Special attention will be paid to clearly demonstrate the capabilities and benefits of this technology with benchmark circuits and advanced system applications in the 0.1 to ...
Read Project

 17

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Jun 1, 2016,

leer
Read Project

 1

 FINISHED 
For the first time, more than 50% of the world's population live in urban areas. By 2050, c. 70% of people are likely to be city dwellers, compared with less than 30% in 1950. This trend brings with it increased security and safety threats in urban areas, not least to urban built infrastructure. The central aim of HARMONISE (A Holistic Approach to Resilience and Systematic ActiOns to Make Large Sc ...
Read Project

 15

 FINISHED 

Situation AWare Security Operations Center (SAWSOC)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

SAWSOC aims at bringing a significant advancement in the convergence of physical and logical security, meaning effective cooperation (i.e. a coordinated and results-oriented effort to work together) among previously disjointed functions. Recently some achievements have been made (e.g. SEM and SIM have merged into SIEM, and LACS and PACS have merged into IM), Security Operations Center (SOC) techno ...
Read Project

 13

 FINISHED 

Fate and Impact of Atmospheric Pollutants (AMIS)

Start date: Feb 1, 2012, End date: Jan 31, 2016,

"The proposed project aims at establishing a long-lasting collaboration and creates a network of European and Chinese research centres of excellence in the area of air quality and climate change studies. This aim will be achieved by undertaking joint research activities via collaboration facilitated by individual mobility of researchers between Europe and China. Accordingly, this network will cont ...
Read Project

 9

 FINISHED 
"TALENT is a 4-year multi-site training network aiming at career development of young researchers on design, construction, manufacturing, testing and commissioning of innovative radiation hard detector modules and novel scientific instruments. TALENT provides, to 15 ESRs and 2 ERs, training for deep understanding of the complexity of scientific instrument building from theoretical design until ind ...
Read Project

 10

 FINISHED 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Read Project

 13

 FINISHED 

Terahertz Photonic Imager on Chip (TeraTOP)

Start date: Oct 1, 2011, End date: Jun 30, 2015,

The impressive developments in the field of electronic imaging based on CMOS Imagers have generated worldwide enormous business opportunities, with revenues of more than $4B in 2009 at the component level alone. Today such Imagers almost solely address the visible and near-infrared part of the electromagnetic spectrum. Many applications would profit from affordable and reliable Imagers for the ter ...
Read Project

 8

 FINISHED 
CHANCES aims at combining and integrating on-going cohort studies in order to produce evidence on ageing-related health characteristics and determinants in Europe, and their socio-economic implications. 15 cohorts participate, covering populations from 18 EU Member States, 4 associate countries, and 3 additional countries. The combination of these different studies would lead to an integrated appr ...
Read Project

 17

 FINISHED 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Read Project

 39

 FINISHED 

Intercultural Primary School Education

Start date: Sep 1, 2014, End date: Dec 19, 2014,

The project InterPriSE (Intercultural Primary School Education) is designed to help young educators who wish to develop their knowledge on the principles of intercultural education and teaching in multicultural environments. Participants will learn alternative teaching methods that relate to modern pedagogy, will experience self-assessment techniques and will reveal the connection of stereotypes a ...
Read Project

 15

 FINISHED 
"The main objectives of the INDECT project are: • to develop a platform for: the registration and exchange of operational data, acquisition of multimedia content, intelligent processing of all information and automatic detection of threats and recognition of abnormal behaviour or violence, • to develop the prototype of an integrated, network-centric system supporting the operational activities of ...
Read Project

 18

 FINISHED 
...tion via twinning and capacity building activities with the following 4 excellent European research and innovation organisations: Institut d’Électronique du Solide et des Systèmes Strasbourg, Bergische Universität Wuppertal, Universidad Politécnica de Valencia – Nanophotonics Technology Centre, and Innoveo Consulting. The capacity building activities will involve knowledge exchange, setting up joi ...
Read Project

 5

 FINISHED 
"The fundamental objective of the project is the further integration of existing European research facilities to a grid of reaction chambers in a continuation of the EUROCHAMP project. These facilities were created to study the impact of atmospheric processes e.g. on regional photochemistry, global change, as well as cultural heritage and human health effects under as realistic conditions as possi ...
Read Project

 14

 FINISHED 

Strong Interaction Supercomputing Training Network (STRONGnet)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

The research aims at a deeper understanding of properties of strongly interacting matter. This is mainly done by means of numerical simulations of the underlying theory (QCD) on supercomputers (Lattice QCD). We wish to understand QCD for its own sake and as a prototype of a strongly interacting fundamental theory. Therefore we will calculate the spectrum of mesons, baryons and of exotic states, th ...
Read Project

 10

 FINISHED 
The problem that will be the object of the project is the generation of electric energy on vessels. In the troposphere, the wind increases its velocity with the altitude and this velocity is also more constant. KiteVes solution is based on the on-board realisation of a wind-powered generator, capable to harvest the altitude wind and to efficiently convert wind power into electrical power. The kit ...
Read Project

 10

 FINISHED 
Within the EU, multilingualism and cultural diversity in the law pose intractable situations. Of course, EU legislation and documents of major importance are translated into the 23 official languages, but the EU legal language and the specific concepts chosen do not always correspond with the respective national legal languages and concepts. 27 Member States interpret the same legal text, each inf ...
Read Project

 1

 FINISHED 
The project described in this proposal aims at developing a new methodology to obtain semiconductor quantum dots (QDs) regioselectively in a polymeric matrix by means of a heating probe (laser). This new method is designed to produce light emitting devices (LED/T) based on semiconductor/polymer nanocomposite emission without using lithographic processes.This type of effect is possible because, aft ...
Read Project

 7

 FINISHED 
The extent of polar stratospheric ozone loss – often referred to as the “Ozone Hole” – is significantly influenced by climate change, and in turn, stratospheric ozone has been recognized as an important component in the climate system. To accurately quantify the effects of climate change on stratospheric ozone and the related feedback mechanisms, as well as to make reliable predictions of future o ...
Read Project

 18

 FINISHED 

Transport Fire Safety Engineering in the European Union (TRANSFEU)

Start date: Apr 1, 2009, End date: Nov 30, 2012,

There is an urgent need to have a confident toxicity measurement methodology that contributes to the existing level of surface transport fire safety, which is the most difficult issue to assess in case of fire. The lack of confidence in the robustness of the existing product toxicity classification forbids its acceptance as a standard which prevent the European industry from common safety rules an ...
Read Project

 22

 FINISHED 

Study of Strongly Interacting Matter (HadronPhysics2)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

The Project promotes the access to five European Research Infrastructures, and it is structured intop eight Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities. The Project represents the continuation of the successful HadronPhysics project in FP6 and originates from the initiative of more than 2.500 European scientists working in the field of hadro ...
Read Project

 46

 FINISHED 
The call 4.2.2-1 “organic materials for electronics and photonics” is based on the observation that the limited availability of high-performance multi-functional materials is a roadblock to further industrial progress. To address the wide scope of the call, we have identified specific materials bottlenecks to the fields of electronics and photonics. They constitute the focal points of our project. ...
Read Project

 31