Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
Many HIV vaccine concepts and several efficacy trials have been conducted in the prophylactic and therapeutic fields with limited success. There is an urgent need to develop better vaccines and tools predictive of immunogenicity and of correlates of protection at early stage of vaccine development to mitigate the risks of failure. To address these complex and challenging scientific issues, the Eur ...
Read Project

 43

 FINISHED 

Ultra-Low Power Event-Based Camera (ULPEC)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The long term goal of ULPEC is to develop advanced vision applications with ultra-low power requirements and ultra-low latency. The output of the ULPEC project is a demonstrator connecting a neuromorphic event-based camera to a high speed ultra-low power consumption asynchronous visual data processing system (Spiking Neural Network with memristive synapses). Although ULPEC device aims to reach TRL ...
Read Project

 8

 FINISHED 
The problem: finding the right patient for the right treatmentDespite a large and growing disease burden in osteoarthritis (OA), many pharmaceutical companies have de-emphasized or even abandoned OA drug development due to perceived hurdles. Crucial in this is the lack of appropriate outcome measures that can robustly identify patient benefit from a specific therapy. The lack of specific and sensi ...
Read Project

 25

 FINISHED 
NoAW : No Agro-Waste.Innovative approaches to turn agricultural waste into ecological and economic assets.Driven by a “near zero-waste” society requirement, the goal of NoAW project is to generate innovative efficient approaches to convert growing agricultural waste issues into eco-efficient bio-based products opportunities with direct benefits for both environment, economy and EU consumer. To ach ...
Read Project

 32

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 
NIMBLE: collaboration Network for Industry, Manufacturing, Business and Logistics in Europe will develop the infrastructure for a cloud-based, Industrie 4.0, Internet-of-things-enabled B2B platform on which European manufacturing firms can register, publish machine-readable catalogs for products and services, search for suitable supply chain partners, negotiate contracts and supply logistics, and ...
Read Project

 17

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Low Energy And Near to zero emissions Ships (LeanShips)

Start date: May 1, 2015, End date: Apr 30, 2019,

The specific challenge for waterborne transport call MG4.1 is, “To support developments that make new and existing vessels…more efficient and less polluting”. A sound way to support developments is, to demonstrate solutions that are sufficiently close to market so that ship owners will consider these in their future investment plans. Following this reasoning LeanShips will execute 8 demonstration ...
Read Project

 49

 FINISHED 
MOEEBIUS introduces a Holistic Energy Performance Optimization Framework that enhances current (passive and active building elements) modelling approaches and delivers innovative simulation tools which (i) deeply grasp and describe real-life building operation complexities in accurate simulation predictions that significantly reduce the “performance gap” and, (ii) enhance multi-fold, continuous op ...
Read Project

 17

 FINISHED 

Astronomy ESFRI and Research Infrastructure Cluster (ASTERICS)

Start date: May 1, 2015, End date: Apr 30, 2019,

ASTERICS (Astronomy ESFRI & Research Infrastructure Cluster) aims to address the cross-cutting synergies and common challenges shared by the various Astronomy ESFRI facilities (SKA, CTA, KM3Net & E-ELT). It brings together for the first time, the astronomy, astrophysics and particle astrophysics communities, in addition to other related research infrastructures. The major objectives of ASTERICS ar ...
Read Project

 24

 FINISHED 

Virtual Multimodal Museum (ViMM)

Start date: Oct 1, 2016, End date: Mar 31, 2019,

Virtual Multimodal Museum (ViMM) proposes a major, high-impact CSA across the field of Virtual Museums (VM), within the overall context of European policy and practice on Virtual Cultural Heritage (VCH). A highly expert seven (7) partner consortium will leverage the support of a unique and powerful Advisory Group, consisting of many of the Europe and the world’s leading public and private sector ...
Read Project

 8

 FINISHED 
BRIDGES (Bringing together Research and Industry for the Development of Glider Environmental Services) will provide a necessary tool for further understanding, improved monitoring, and responsible exploitation of the marine environment while assuring its long-term preservation. This new tool, a robust, cost-effective, re-locatable, versatile and easily-deployed ocean glider, will support autonomo ...
Read Project

 21

 FINISHED 
EU28 currently generates 461 million tons per year of ever more complex construction and demolition waste (C&DW) with average recycling rates of around 46%. There is still a significant loss of potential valuable minerals, metals and organic materials all over Europe.The main goal of HISER project is to develop and demonstrate novel cost-effective technological and non-technological holistic solut ...
Read Project

 29

 FINISHED 

SMILE - SMall Innovative Launcher for Europe (SMILE)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Current launchers (ARIANE6 and VEGA C) will guarantee Europe’s independent access to space for the high-end satellite market. These launchers however are significantly less attractive for classes of smaller satellites.The SMILE initiative therefore addresses reliable, affordable, quick and frequent access to space for the emerging market of small satellites up to 50 kg, fulfilling the needs from t ...
Read Project

 14

 FINISHED 
The European manufacturing industry faces new challenges, which are currently not addressed by today’s products and systems. Most of the products are still in essence ‘simple’ in nature, with no capability for adapting to the consumers’ needs and no integrated methods exist for the holistic acquisition and processing of feedback information emanating from product-services. ICP4Life proposes an int ...
Read Project

 12

 FINISHED 

European Exascale System Interconnect and Storage (ExaNeSt)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

ExaNeSt will develop, evaluate, and prototype the physical platform and architectural solution for a unified Communication and Storage Interconnect and the physical rack and environmental structures required to deliver European Exascale Systems. The consortium brings technology, skills, and knowledge across the entire value chain from computing IP to packaging and system deployment; and from opera ...
Read Project

 12

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 
Establishment and development of a new Master on “ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENT BUILDINGS” in 3 RU and 2 AM Universities with affiliation of other 2 RU Universities, according to features and learning outcomes delivering graduates environmental and “green buildings” technological issues’ skills. 1. Curricular reform: to implement an effective curricular development oriented towards ...
Read Project

 20

 FINISHED 
The software engineering (SE) is a young discipline introduced in 1968. The first educational SE programs were accredited in 2003, the body of knowledge for the SE was accepted as an international standard in 2005, and in 2010 only about 60 universities in the US offered SE programs. According to the United States Bureau of Labor Statistics, the job growth rate ranges from 38% to 56% across the co ...
Read Project

 11

 FINISHED 
Scan4Reco will develop a novel portable, integrated and modular solution for customized and thus cost-effective, automatic digitization and analysis of cultural heritage objects (CHOs), even in situ. A multi-sensorial 3D scanning - facilitated by a mechanical arm – will collect multi-spectra data and then, a hierarchical approach for 3D reconstruction of CHOs will be applied, enabling multi-layere ...
Read Project

 10

 FINISHED 

MIND

Start date: Jul 31, 2015, End date: Aug 31, 2018,

Zowel in Duitsland als in Nederland is de Life Science & Health sector een innovatieve sector met veel groeipotentieel voor de toekomst. Daarbij heeft de zorg ook te maken met grote maatschappelijke uitdagingen. Denk bijvoorbeeld aan de vergrijzing en nieuwe ziektebeelden. In het Duits- Nederlandse grensgebied is veel kennis op het gebied van Life Science & Health. Er zijn in beide landen verschil ...
Read Project

 29

 FINISHED 
Chronic cancer treatment places new demands on patients and families to manage their own care. The iManageCancer project will support this challenge and provide a cancer disease self-management platform designed according to the specific needs of patient groups and focusing on the wellbeing of the cancer patient with special emphasis on psycho-emotional evaluation and self-motivated goals. The pla ...
Read Project

 11

 FINISHED 
NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Read Project

 24

 FINISHED 

Train-to-NZEB: The Building Knowledge Hubs (Train-to-NZEB)

Start date: Jun 1, 2015, End date: Jun 1, 2018,

The Train-to-NZEB project is designed to establish a functioning network of training and consultation centres (Building Knowledge Hubs, BKHs), providing practical trainings, demonstrations and complex consulting services for the implementation of nearly-zero energy buildings (NZEB). Using the improved training facilities, the BKHs will provide enhanced capacity for conduction of trainings on curri ...
Read Project

 12

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 
European water utilities face many problems related to their 3,5 million km’s of distribution networks. Large parts of water distribution networks have to be rehabilitated requiring investments of € 20 billion/year. Prioritization and optimization of investments is needed urgently. In many countries, water quality needs improvement in order to reduce health risks and resources for water production ...
Read Project

 21

 FINISHED 
The main objectives of DESSIN are- To demonstrate and promote innovative solutions to water-related challenges with a focus on: (i) water quality issues related to the implementation of the Water Framework Directive (WFD) and (ii) water scarcity.- To demonstrate a methodology for the valuation of ecosystem services (ESS) as catalyser for innovation in water management.DESSIN will launch demonstrat ...
Read Project

 21

 FINISHED 

Sustainable Innovative Mobilisation of Wood (SIMWOOD)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

"SIMWOOD presents a novel idea for an innovative, integrated approach to multifunctional forestry and enhanced wood mobilisation across European forest regions. The project targets a multitude of forest owners and stakeholders to spread integrated, transferable solutions and viable policies to unlock immobile forest resources and ensure sustainable forest functions. A novel pan-European Informatio ...
Read Project

 29

 FINISHED 
Microalgae are a promising feedstock for sustainable supply of commodities and specialties for food and non-food products. Despite this potential the implementation is still limited which is mainly due to unfavourable economics. Major bottlenecks are the lack of available biomass at acceptable costs and the absence of appropriate biorefinery technologies. The 4-year MIRACLES project aims to resolv ...
Read Project

 27

 FINISHED 
As stated by the marine research decision makers in Europe in the “Ostend Declaration” in 2010, a major challenge is to support the development of a truly integrated and sustainably funded European Ocean Observing System. This will be achieved with more long-term measurements of key parameters but is impaired by the costs and lack of reliability of ocean sensors in general. The NeXOS project aims ...
Read Project

 22

 FINISHED 
"The concept of the proposed project lies in the development of lightweight and flexible protective clothing, incorporating smart functionalities and designated for law enforcement authorities.Up to now, research on the protective gear of this group concentrated on the ballistic properties of the body armour. However, in spite of the improvements, modern body armours still have some of the same dr ...
Read Project

 10

 FINISHED 
Description The goal of the BALANCE project is to realize an exoskeletal robot that improves the balance performance of humans, targeted at users facing balance-challenging conditions or suffering from a lack of ability to walk or maintain balance during walking. The proposed exoskeleton is human-cooperative in the sense that the control of ...
Read Project

 8

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 
Developing robust, reproducible, interoperable and collaborative hyper-models of diseases and normal physiology is a sine qua non necessity if rational, coherent and comprehensive exploitation of the invaluable information hidden within human multiscale biological data is envisaged. Responding to this imperative in the context of both the broad Virtual Physiological Human (VPH) initiative and the ...
Read Project

 17

 FINISHED 
"OILTEBIA (Optical Imaging and Laser TEchniques for BIomedical Applications) is an Initial Training Network (ITN) that seeks to train researchers in a multidisciplinary environment where pulsed laser technology, sensor and signal processing techniques meet in the biomedicalenvironment to achieve novel optical imaging technologies from bench to bedside, spanning from basic research and drug discove ...
Read Project

 10

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
In this proposed integrating project we will develop innovative in-line high throughput manufacturing technologies which are all based on atmospheric pressure (AP) vapour phase surface and on AP plasma processing technologies. Both approaches have significant potential for the precise synthesis of nano-structures with tailored properties, but their effective simultaneous combination is particularl ...
Read Project

 24