Search for European Projects

33 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...ry of the Thales Group, worldwide leader in the development and production of space products, responsible for thruster equipment and integrated EPS. European industrial partners are: Thales, OHB, Airbus and Aerospazio, who bring their expertise in spacecraft mission studies, equipment development and testing capacities. The University of Greifswald will provide plasma simulation to support the thr ...
Read Project

 10

 FINISHED 
Effective EU support to a large external crisis requires new approaches. In response to this challenge and to identified user and market needs from previous projects, Reaching Out proposes an innovative multi-disciplinary approach that will optimize the efforts, address a wide spectrum of users and maximize market innovation success.This approach results in five main objectives: to1. Develop a Col ...
Read Project

 29

 FINISHED 

EUROPEAN ROBOTIC GOAL-ORIENTED AUTONOMOUS CONTROLLER (ERGO)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

European Robotic goal-oriented autonomous COntroller (ERGO)The specific objective of ERGO is thaen to deliver the most advanced but flexible space autonomous framework/system suitable for single and/or collaborative space robotic means/missions (orbital and surface rovers) demanding robust operations with adaptable levels of autonomy.Due to the intrinsic similarities of addressed scenarios, especi ...
Read Project

 8

 FINISHED 

Speaker Identification Integrated Project (SIIP)

Start date: May 1, 2014, End date: Apr 30, 2018,

SIIP is a break-through Suspect Identification solution based on a novel Speaker-Identification (SID) engine fusing multiple speech analytic algorithms (e.g. voiceprints recognition, Gender/Age/Language/Accent ID, Keyword/ Taxonomy spotting and Voice cloning detection). This Fused Speaker Identification will result in significantly higher true-positive speaker identification, reduced False-Positiv ...
Read Project

 20

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Hybrid Propulsion Module for transfer to GEO orbit (HYPROGEO)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

Independent access to space is a key component of the European Space Policy. The competition is increasing in this area both for the full launching systems and the key subsystems. Cost-effectiveness becomes the main driving factor.HYPROGEO ambition is to study a propulsion module based on Hybrid chemical propulsion. Hybrid propulsion is not a new technology but its application to a transfer module ...
Read Project

 15

 FINISHED 

Global ATM security management (GAMMA)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Read Project

 23

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Advanced Forest Fire Fighting (AF3)

Start date: May 1, 2014, End date: Apr 30, 2017,

In recent years, the frequency of large-scale forest fires has increased significantly owing to a number of factors including the effects of climate change, urbanisation, poor landscape management and malevolent acts. These so-called “Mega-fires” are particularly destructive and difficult to control with the technologies and systems currently available to fire fighters and emergency agencies. The ...
Read Project

 20

 FINISHED 
Icing conditions are one of the most severe for aircraft and engines as experienced in the certification process and in-service events. Certification tests are never simple because icing phenomena is a very complex domain and designers have access to a very low level of prediction capability compare to other fields, mainly relying on a very fragmented knowledge based on empirical past experience. ...
Read Project

 15

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
In the next decade, EU industries developing Critical Real-Time Embedded Systems (CRTES) (safety, mission or business critical) will face a once-in-a-life-time disruptive challenge caused by the transition to multicore processors and the advent of manycores, tantamount to complex networked systems. This challenge brings the opportunity to integrate multiple applications onto the same hardware plat ...
Read Project

 11

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
"The proposed HYPER System is a scaleable and flexible portable power platform technology representing significant advances in terms of fuel cell development, hydrogen storage and associated supply. R&D will generate both new scientific knowledge and new technologies for exploitation. Specifically the project will:• Focus on developing a system based on application specific operational and perform ...
Read Project

 7

 FINISHED 
"SPIDER PLUS objective is to provide a new 2050 mobility VISION through a Strategic Design & Plan, and a Road Map delivering Sustainable Solutions by then. In such Plan the electrified Rail has a central role both for passengers and freight. The productivity of the available resources supported by ICT and other technologies, is maximized by the combination of infrastructural nodes with spatial and ...
Read Project

 14

 FINISHED 
The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Read Project

 20

 FINISHED 
In all industrial sectors, Non Destructive Evaluation techniques play a critical role for ensuring structures reliability, plant safety and increasingly also for ensuring quality and efficiency of products and processes. The emerging use of numerical simulation is a major trend in the field with tremendous potential benefits in terms of costs reduction, enhanced diagnosis reliability and consequen ...
Read Project

 20

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 
The objective of PRACTICE project is to improve the preparedness and resilience of the EU member states and associated countries to an attack from a terrorist group using non conventional weapons such as CBRN (Chemical, Biological, Radiological and/or Nuclear agents) materials. The existing situation is characterized by a fragmented structure as regards technology, procedures, methods and organiza ...
Read Project

 28

 FINISHED 

Packaging of futuRe Integrated ModulAr Electronics (PRIMAE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

"Affordable transport for the citizen relies on innovative solutions and technologies that will result in lower costs and lead-time of the aircraft and its systems. In this area, the packaging of on-board computers is an important contributor.The Packaging of futuRe Integrated ModulAr Electronics (PRIMAE) objective is to develop a new flexible, robust and open aeronautical packaging for the next g ...
Read Project

 20

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 
...ng of the technology. The initial market strategy will be to concentrate on the EC market, where the consortium has a strong market presence and a clear route to market through the partnership with Airbus.
Read Project

 6

 FINISHED 

Extended Non-Destructive Testing of Composite Bonds (ENCOMB)

Start date: Nov 1, 2010, End date: Apr 30, 2014,

"Even though composite materials are already used in the manufacturing of structural components in aeronautics industry a consequent light-weight design of CFRP primary structures is limited due to a lack of adequate joining technologies. In general, adhesive bonding is the optimum technique for joining CFRP light-weight structures, but difficulties in assessing the bond quality by non-destructive ...
Read Project

 15

 FINISHED 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Read Project

 34

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Start date: Apr 1, 2010, End date: Mar 31, 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Read Project

 40

 FINISHED 

innovative Systems for Personalised Aircraft Cabin Environment (iSPACE)

Start date: Sep 1, 2009, End date: Dec 31, 2012,

"The focus of this proposal is to improve passengers’ comfort and well-being while fulfilling specific human needs in the treated case ""living environment in an airplane"". To address the individual passenger and her/his needs this will be done in the frame of an individual and innovative seat environment. Thus passengers’ choice with regard to comfort will be increased directly. Therefore, iSPAC ...
Read Project

 10

 FINISHED 

Planetary Robotics Vision Ground Processing (PRoVisG)

Start date: Oct 1, 2008, End date: Jun 30, 2012,

PROVISG will build a framework for planetary robotic vision ground processing - develop the technology to better process and visualise existing & future data from planetary missions to maximize value-adedd exploitation of the data for research, technology and education - increase public awareness of such missions and the EC contribution to their scientific evaluation.We define robotic planetary sp ...
Read Project

 14

 FINISHED 

ASSET – Aeronautic Study on Seamless Transport (ASSET)

Start date: Jun 1, 2008, End date: Nov 30, 2011,

"Airport ground processes still conceal a considerable potential for improvement of time efficiency. Recent studies from Eurocontrol Performance Review Commission prove that insufficient punctuality in air transport results mainly from variance in off-block times. This leads to poor predictability and sizeable inefficiencies throughout the whole air transport system. Aim of proposed project is to ...
Read Project

 15

 FINISHED 
Es liegen noch keine Ergebnisse vor.
Read Project

 14

 FINISHED 
Es liegen noch keine Ergebnisse vor.
Read Project

 14