Search for European Projects

22 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Despite process heat is recognized as the application with highest potential among solar heating and cooling applications, Solar Heat for Industrial Processes (SHIP) still presents a modest share of about 0.3% of total installed solar thermal capacity. As of today’s technology development stage – economic competitiveness restricted to low temperature applications; technology implementation requiri ...
Read Project

 32

 FINISHED 

Fishfriendly Innovative Technologies for Hydropower (FIThydro)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The f ...
Read Project

 26

 FINISHED 

MULTIple DRONE platform for media production (MULTIDRONE)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

MULTIDRONE aims to develop an innovative, intelligent, multi-drone platform for media production to cover outdoor events, which are typically held over wide areas (at stadium/city level). The 4-10 drone team, to be managed by the production director and crew, will have: a) increased decisional autonomy, by minimizing production crew load and interventions and b) improved robustness, security and ...
Read Project

 9

 FINISHED 
LASERLAB-EUROPE is the European consortium of major national laser research infrastructures, covering advanced laser science and applications in most domains of research and technology, with particular emphasis on areas with high industrial and social impact, such as bio- and nanophotonics, material analyses, biology and medicine. Recently the field of advanced lasers has experienced remarkable ad ...
Read Project

 26

 FINISHED 
EuPRAXIA will produce a conceptual design report for the worldwide first 5 GeV plasma-based accelerator with industrial beam quality and user areas. EuPRAXIA is the required intermediate step between proof-of-principle experiments and ground-breaking, ultra-compact accelerators for science, industry, medicine or the energy frontier (“plasma linear collider”). The study will design accelerator tech ...
Read Project

 17

 FINISHED 

volumetric medical x-ray imaging at extremely low dose (VOXEL)

Start date: Jun 1, 2015, End date: May 31, 2019,

Computerized Tomography (CT) has been one of the greatest achievements in medical imaging, but at the cost of a high, potentially harmful, X-ray irradiation dose. The ultimate goal of VOXEL is to provide an alternative to tomography with a disruptive technology enabling 3D X-ray imaging at very low dose. VOXEL aims at prototyping new cameras that will combine the X-ray penetration and nanometre sp ...
Read Project

 7

 FINISHED 
The overall aim of Real-Time-Mining is to develop a real-time framework to decrease environmental impact and increase resource efficiency in the European raw material extraction industry. The key concept of the proposed research promotes the change in paradigm from discontinuous intermittent process monitoring to a continuous process and quality management system in highly selective mining operati ...
Read Project

 14

 FINISHED 
INMARE stands for “Industrial Applications of Marine Enzymes: Innovative screening and expression platforms to discover and use the functional protein diversity from the sea”. It is a collaborative Innovation Action to streamline the pathways of discovery and industrial applications of new marine enzymes and bioactives for targeted production of fine chemicals, drugs and in environmental clean-up ...
Read Project

 26

 FINISHED 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Read Project

 28

 FINISHED 

Quantum fields and knot homologies (FIELDS-KNOTS)

Start date: Dec 1, 2013, End date: Nov 30, 2018,

This project is concerned with fundamental problems arising at the interface of quantum field theory, knot theory, and the theory of random matrices. The main aim of the project is to understand two of the most profound phenomena in physics and mathematics, namely quantization and categorification, and to establish an explicit and rigorous framework where they come into play in an interrelated fas ...
Read Project

 4

 FINISHED 
"For a vast amount of applications in the medical, industrial, research and other sectors, a good understanding of radiation protection (RP) is fundamental in order to protect workers, the public and the environment from the potential risks of ionising radiation. Within this perspective, building and maintaining an advanced level of competence in RP, assuring sufficient well-trained personnel and ...
Read Project

 14

 FINISHED 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Read Project

 42

 FINISHED 

Widely scalable Mobile Underwater Sonar Technology (WiMUST)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The WiMUST (Widely scalable Mobile Underwater Sonar Technology) project aims at expanding and improving the functionalities of current cooperative marine robotic systems, effectively enabling distributed acoustic array technologies for geophysical surveying with a view to exploration and geotechnical applications. Recent developments have shown that there is vast potential for groups of marine rob ...
Read Project

 10

 FINISHED 

Robotics Coordination Action for Europe Two (RockEU2)

Start date: Feb 1, 2016, End date: Jan 31, 2018,

The FP7 coordination action RockEU has been extremely successful in building a strong European robotics community, leading to the creation of euRobotics aisbl - the private partner of the SPARC PPP and development of the Strategic Research Agenda and the Multi-Annual Roadmap, which are the main guidelines for shaping European robotics R&D&I.RockEU2 builds on and extends this successful community i ...
Read Project

 17

 FINISHED 

solving CHAllenges in Nuclear DAta (CHANDA)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Read Project

 35

 FINISHED 

Open Project for the European Radiation Research Area (OPERRA)

Start date: Jun 1, 2013, End date: May 31, 2017,

"Within the OPERRA project, it is proposed that the MELODI Association, as a well-advanced network, takes the lead in establishing the necessary structures able to manage the long-term European research programmes in radiation protection, also taking advantage of the valuable experience gathered through the DoReMi network of excellence. Whilst in fields adjacent to low-dose risk research (radioeco ...
Read Project

 71

 FINISHED 

MyrrhA Research Infrastructure Support Action (MARISA)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Read Project

 17

 FINISHED 
"In line with the Lisbon strategy and 2020 perspective “Petrus” initiative coordinates since 2005 universities, WMOs, training organisations and research institutes efforts to develop cooperative approach to education and training (E&T) in the geological disposal with the purpose of expanding this cooperation under PETRUS3.PETRUS3 project aims at continuation of the European Cooperation in this ar ...
Read Project

 20

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 

Multi-Robot Cognitive Systems Operating in Hospitals (MOnarCH)

Start date: Feb 1, 2013, End date: Mar 31, 2016,

Description MOnarCH targets the development of a novel framework to model mixed human-robot societies, and its demonstration using a network of heterogeneous robots and sensors, in the pediatric area of an oncological hospital. It will handle uncertainties introduced by people and robots, generate natural interactions and engage in edutainme ...
Read Project

 9

 FINISHED 
This proposal aims to close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address th ...
Read Project

 50

 FINISHED 
Background The promotion of EMAS and broader sustainable development is a priority of the 6th Environment Action Programme, as is the development of a thematic strategy on the sustainable use of resources. Before the project’s start, there had been only two EMAS registrations in Portugal and none for agriculture (EU-wide there are only 12 in this sector ...
Read Project

 11