Variant-independent investigation on the development of Danube waterway between Straubing and Vilshofen (EU Study)
Start date: Oct 1, 2008, End date: Mar 30, 2013 PROJECT  FINISHED 

The Danube river section from Straubing to Vilshofen is a major bottleneck in the Trans-European Network regarding loaded draught and nautical difficulties. For many years, possible packages of measures have been discussed to establish homogenous shipping transport conditions and to reduce the risk of naval accidents.While the rest of the waterway has been adapted to a draught depth of 2.5 m almost all-the-year, several restrictions arise frequently due to alternating water levels in the (free flowing) section between Straubing and Vilshofen. The possible loaded draught between Straubing and Vilshofen is only 1.6 m in case of low water. On average, a draught value of 2.50 m is only available 144 days p.a. At the same time, the existing flood prevention system has to be consistently enhanced up to a 100-year flood event in due consideration of the waterway development.After many years of interdisciplinary studies and political negotiations on the possibilities for improving shipping conditions, including flood control and implementation of a regional planning procedure, there was no agreement about the variant to be used. Finally two remaining variants in discussion (variant A and variant C2.80) with different benefit and different impacts were perused in the course of this study, as part of Priority Project 18 (Waterway axis Rhine/Meuse-Main-Danube).ObjectivesThe task of the study was to examine and prepare technical and ecological planning for the Danube development between Straubing and Vilshofen for both above-mentioned variants to bring about the final decision concerning the execution of the preferred variant including the ability to carry out administrative procedures required as quickly as possible.Therefore, planning had to be executed in great detail (planning approval depth). All impacts and decision-related aspects, especially with regard to navigation, engineering, economic feasibility and environmental compatibility (regionally and globally), had to be assessed. The main objective was to provide a secure basis for informed political decision, but explicitly without giving any recommendation.

Looking for a partnership?
Have a look at
Ma Région Sud!
https://maregionsud.up2europe.eu

Coordinator

Details

  • 50.1%   13 350 000,00
  • Other (EUSDR projects related)
  • Project on KEEP Platform