Road bridge at km 0+540 of the Danube–Black Sea Ca.. (Road bridge at km 0+..)
Road bridge at km 0+540 of the Danube–Black Sea Canal and the works related to the road and access infrastructure for the Port of Constan?a
(Road bridge at km 0+540 of the Danube–Black Sea Canal and the works related to the road and access infrastructure for the Port of Constanţa)
Start date: Dec 31, 2009,
End date: Dec 30, 2013
PROJECT
FINISHED
The project is necessary for connecting the Constanta Port to the Bucharest–Constanta highway (A2), establishing a direct link between the Northern and the Southern part of the Constanta Port. Works are related to the building of a bridge over the Danube–Black Sea Canal as well as to the various access roads, ramps and passageways related to the bridge.
Get Access to the 1st Network for European Cooperation
Log In