REHABILITATION OF THE RAILWAY LINE SIGHISOARA – CO.. (REHABILITATION OF TH..)
REHABILITATION OF THE RAILWAY LINE SIGHISOARA – COSLARIU FOR THE TRAFFIC OF THE TRAINS AT A MAXIMUM SPEED OF 160 KM/H
Start date: Dec 31, 2010,
End date: Dec 30, 2016
PROJECT
FINISHED
Aim: to rehabilitate 96.2 km of present line (89.5 km after the modernisation) up to the corridor standards;- to ensure the technical conditions for the traffic of the passenger trains at a speed of 160 km/h and of the freight trains at a speed of 120 km/h;- to achieve the technical parameters set down in the international agreements AGC, AGTC, TER;- to implement ERTMS/ETCS Level 2 and the communications in the GSM-R system.
Get Access to the 1st Network for European Cooperation
Log In