paration of Necessary Documentation for River Trai.. (Preparation of Neces..)
paration of Necessary Documentation for River Training and Dredging Works on selected locations along the Danube River in Serbia
(Preparation of Necessary Documentation for River Training and Dredging Works on selected locations along the Danube River in Serbia)
Start date: May 12, 2011,
End date: Jun 9, 2014
PROJECT
FINISHED
Critical sections on the Danube River in Serbia are identified in the Master Plan for IWW Transport in Serbia (2006). The objective of this project is to finalise thenecessary designs and tender documentation for river training works on six selected critical sections on the Danube river from Bezdan to Serbia in order to start rivertraining works and improve navigation safety conditions. The project also includes pre-feasibility study / general design and feasibility study / conceptual design for allcritical sections on the Danube waterway from Bezdan to Belgrade. Works are foreseen between 2013 and 2016.ObjectivesNecessary designs and tender documentation for river training works on six critical sections on the Danube River in Serbia finalized, in order to start rivertraining works and improve navigation safety conditions.
Get Access to the 1st Network for European Cooperation
Log In