Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
MELODIC will enable data-intensive applications to run within defined security, cost, and performance boundaries seamlessly on geographically distributed and federated cloud infrastructures. Serving the user’s needs and constraints, MELODIC will realise the potential of Cloud computing for big data and data-intensive applications by transparently taking advantage of distinct characteristics of ava ...
Read Project

 7

 FINISHED 

Pervasive Ubiquitous Lightwave SEnsor (PULSe)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

PULSe's objective is to optimize, industrialize and create the conditions for a market exploitation of the first cost -effective Brillouin distributed sensing solution based on a synergy of innovations on interrogator equipment, strain sensing cable and open-access application support tools.
Read Project

 5

 FINISHED 

Ultra-Low PoweR technologIes and MEmory architectures for IoT (PRIME)

Start date: Dec 1, 2015, End date: Mar 31, 2019,

The goal of the PRIME project is to establish an open Ultra Low Power (ULP) Technology Platform containing all necessary design and architecture blocks and components which could enable the European industry to increase and strengthen their competitive and leading eco-system and benefit from market opportunities created by the Internet of Things (IoT) revolution. Over 3 years the project will deve ...
Read Project

 19

 FINISHED 
EU28 currently generates 461 million tons per year of ever more complex construction and demolition waste (C&DW) with average recycling rates of around 46%. There is still a significant loss of potential valuable minerals, metals and organic materials all over Europe.The main goal of HISER project is to develop and demonstrate novel cost-effective technological and non-technological holistic solut ...
Read Project

 29

 FINISHED 
NEXTRUST objective is to increase efficiency and sustainability in logistics by developing interconnected trusted collaborative networks along the entire supply chain. These trusted networks, built horizontally and vertically, will fully integrate shippers, LSPs and intermodal operators as equal partners. To reach a high level of sustainability, we will not only bundle freight volumes, but shift t ...
Read Project

 31

 FINISHED 

Predictable Flexible Molten Salts Solar Power Plant (PreFlexMS)

Start date: Jun 1, 2015, End date: May 31, 2018,

Predictability and flexibility are key enablers to increase CSP penetration in the energy mix by a) increasing dispatchability b) making CSP less/not reliant on subsidies c) supporting stable grid operation d) enabling operators to access new revenue streams (electricity trading, ancillary services). Today CSP plants with molten salt storage only partly achieve these objectives. Key enabling techn ...
Read Project

 16

 FINISHED 

Electrification of public transport in cities (ELIPTIC)

Start date: Jun 1, 2015, End date: May 31, 2018,

The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars:• Safe integratio ...
Read Project

 34

 FINISHED 

Range of Electric SOlutions for L-category VEhicles (RESOLVE)

Start date: May 1, 2015, End date: Apr 30, 2018,

RESOLVE proposal aims at enabling the development of a range of cost-effective, energy efficient and comfortable ELVs (Electric L-category Vehicles) that will primarily attract ICE car drivers to switch to ELVs for daily urban commutes.EU cities are increasingly congested due to the demand and usage of motor vehicles that results in emissions and noise levels increase and scarcer parking, affectin ...
Read Project

 14

 FINISHED 
The objective is to provide a novel methodology and a comprehensive ICT solution for collaborative design of product-services (Meta Products) and their production processes. The effective extension of products with new services in different sectors (automotive, home appliances, automation equipment etc.) will be achieved by means of Ambient Intelligence (AmI) technology, Lean and Eco-design princi ...
Read Project

 16

 FINISHED 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Read Project

 48

 FINISHED 
The Erasmus+ Project “Innovation, Competence and Success for the Future Professionals in the European Context”-ICS-CE aims at the collaboration of “Stefan Procopiu” High-School,Vaslui, Romania with partners from four European countries: Poland, Spain, Germany and Portugal. The mobilities proposed by the project address students from 9th, 10th and 11th grades high-school and vocational education f ...
Read Project

 5

 FINISHED 
EcoShopping project aims to build a holistic retrofitting solution for commercial buildings to reduce primary energy consumption down to less than 80kWh/m2 per year and increase the share of RES (Renewable Energy Sources) more than 50% compared to the state of the art. The approach will be systemic by developing (1). Novel thermal insulation solutions using cost effective materials to further redu ...
Read Project

 17

 FINISHED 
The vocational training at the dual vocational college (Duales Berufskolleg) incorporates a job placement of several weeks or months. The trainees in the Ortenaukreis, as well as the training companies, the zweiteSchule gemeinnützige Gesellschaft (a non-profit organization), and the Kaufmännische Schulen Lahr work closely together for the mobility project. Local companies have been sending their t ...
Read Project

 14

 FINISHED 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Read Project

 24

 FINISHED 
The project is a continuation and is complementary to the assumptions of the mobility project being currently done in the Erasmus+ programme, and just completed mobility project in Leonardo da Vinci programme. The project participants will be 72 students from technical and vocational school of ZS No. 2 in Sanok, studying to become telecommunications technican, mechanic technician, automotive te ...
Read Project

 5

 FINISHED 

DYNamic citizens @ctive for sustainable MObility (DYN@MO)

Start date: Dec 1, 2012, End date: Nov 30, 2016,

CIVITAS-DYN@MO is an ambitious project with strategic importance to sustainable mobility planning in four dynamic European cities. Aachen (DE), Gdynia (PL), Koprivnica (HR) and Palma (ES) will jointly develop "Mobility 2.0" systems and services, implement city and citizen-friendly, electric mobility solutions and vehicles, and engage in a dynamic citizen dialogue for mobility planning and service ...
Read Project

 27

 FINISHED 
The vision of ReBORN is to demonstrate strategies and technologies that support a new paradigm for re-use of production equipment in old, renewed and new factories; maximizing the efficiency of this re-use and making the factory design process much easier and straight forward, shortening ramp-up times and increasing production efficiency and flexibility. This paradigm will give new life to decommi ...
Read Project

 19

 FINISHED 
The 3rd Energy Package clearly boosts the development of an Integrated European balancing mechanism. In this context, ACER has in 2011 started the development of the Framework Guidelines on Electricity Balancing.It is expected from the ACER statements that Demand Response will play significant role in the future integrated balancing market allowing Virtual Power Plants, comprising Demand Response ...
Read Project

 13

 FINISHED 

Future Internet Social and Technological Alignment Research (FI-STAR)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Read Project

 44

 FINISHED 
According to the International Energy Agency, the Manufacturing sector is at worldwide level responsible for approximately 37% of primary energy consumption being, in most of the developed countries, it is the largest energy consumer and CO2 producer. In this new competitive scenario, European manufacturers have to rethink the current ideas of manufacturing and factories, to be prepared for the n ...
Read Project

 19

 FINISHED 
The proposed research programme will focus on pervasively adaptive software systems for the development of an open modular computational INtelligence software platform For Evolving and Robust predictive systems (INFER) applicable in various commercial settings and industries. The main innovation of the project is a novel type of environment in which the “fittest” predictive model for whatever purp ...
Read Project

 4

 FINISHED 

Trusted Biometrics under Spoofing Attacks (TABULA RASA)

Start date: Nov 1, 2010, End date: Apr 30, 2014,

The TABULA RASA project will address some of the issues of direct (spoofing) attacks to trusted biometric systems. This is an issue that needs to be addressed urgently because it has recently been shown that conventional biometric techniques, such as fingerprints and face, are vulnerable to direct (spoof) attacks.Direct attacks are performed by falsifying the biometric trait and then presenting th ...
Read Project

 11

 FINISHED 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Start date: Sep 1, 2010, End date: Oct 31, 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Read Project

 18

 FINISHED 
Service-oriented computing has attracted significant attention over recent years. While this innovative approach provides enormous potential for software development in an open, networked environment, the very different constraints and quality concerns in different domains have so far led to a heterogeneous landscape of service platforms.While a single integrated platform would be highly desirable ...
Read Project

 9

 FINISHED 
ARTreat targets at providing a patient-specific computational model of the cardiovascular system, used to improve the quality of prediction for the atherosclerosis progression and propagation into life-threatening events that need to be treated accordingly. ARTreat will provide a three-level patient model describing the 3d arterial tree anatomy, the patient-specific blood flow and blood particle d ...
Read Project

 23

 FINISHED 
The principal objective of the CILECCTA project is to bring together a top class consortium of academic and industrial researchers, associations and enterprises – both SMEs and LEs – to develop a suite of software that is: capable of full Life Cycle Cost Analysis (LCCA); compatible with codified Price Banks (PBs) and Life Cycle Inventories (LCIs) across Europe; customisable / configurable for whol ...
Read Project

 19

 FINISHED 
"Terrorist attacks by bombing or CBR-agents are threats with a low probability but with disastrous consequences. There is strong need to protect people, the societal community and critical infrastructures and utilities against being damaged, destroyed or disrupted by deliberate acts of terrorism. Solutions have to be derived to realize sufficient resilience of the urban infrastructure for rare occ ...
Read Project

 11

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 
SUCCESS targets to develop a technology platform and best-practice design methods to enable the breakthrough of silicon mm-Wave SoCs for high-volume applications. Silicon technology (CMOS, SiGe) has made tremendous progress towards ever higher device cut-off frequencies. Nowadays all RF components for mm-Wave sensing applications up to 120 GHz can be realized in silicon. Silicon technology hence ...
Read Project

 9

 FINISHED 
We are a partnership of EU SMEs that has identified a promising non-thermal process that can extend wine shelf life while avoiding the use of chemical preservatives and keeping high wine quality. Pressure Change Technology PCT is a low cost process with minimum energy use, that has potential with further development and validation to be of significant commercial benefit to wine producers by provid ...
Read Project

 11

 FINISHED 
The promise of a truly mobile experience is to have the freedom to roam around anywhere and not be bound to a single location. However, the energy required to keep mobile devices connected to the network over extended periods of time quickly dissipates. In fact, the operational time, has been identified as the number one criteria by the majority of the consumers purchasing a mobile device. Moreove ...
Read Project

 11

 FINISHED 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Read Project

 12

 FINISHED 
In current wireless communications, radio spectrum and infrastructure are typically used such that interference is avoided by exclusive allocation of frequency bands and employment of base stations. SAPHYRE will demonstrate how equal-priority resource sharing in wireless networks improves spectral efficiency, enhances coverage, increases user satisfaction, leads to increased revenue for operators, ...
Read Project

 12

 FINISHED 
"NEW ED aims at closing industrial water cycles and reducing the amount of waste water streams with highly concentrated salt loads stemming from a broad range of industrial production processes by exploiting the waste components (salts) and transforming them to valuable products. This will be achieved by developing new micro- to nano-porous bipolar membranes for bipolar electrodialysis (BPMED), a ...
Read Project

 6

 FINISHED 
The use of renewable energy in the building sector is today dominated by the application of solar domestic hot water and PV systems in single-family houses. In order to significantly increase the use of renewable energy in the building sector, concepts have to be developed for large buildings. In these buildings high fractions of the energy demand can only be met with renewable energy sources, whe ...
Read Project

 27

 FINISHED 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Read Project

 18

 FINISHED 

Seamless Communication for Crisis Management (SECRICOM)

Start date: Sep 1, 2008, End date: Apr 30, 2012,

"SECRICOM is proposed as a collaborative research project aiming at development of a reference security platform for EU crisis management operations with two essential ambitions: (A) Solve or mitigate problems of contemporary crisis communication infrastructures (Tetra, GSM, Citizen Band, IP) such as poor interoperability of specialized communication means, vulnerability against tapping and misuse ...
Read Project

 14

 FINISHED 
Faced with a trend towards increasing freight transport, a global market that is constantly growing and the need for a resource-saving transport system, it is mandatory that European transport policy shifts the balance between all transport systems.`Intelligent MegaSwapBoxes for Advanced Intermodal Freight Transport’ (TelliBox) as an all-purpose loading unit will actively promote the EU’s objectiv ...
Read Project

 10

 FINISHED 

ROad Safety ATTributes exchange infrastructure in Europe (ROSATTE)

Start date: Jan 1, 2008, End date: Dec 31, 2010,

Up-to-date safety attributes are needed by road authorities and for Advanced Driver Assistance Systems (ADAS). ADAS applications are commercial products that can contribute significantly to achieving objectives for reducing the yearly number of road fatalities on European roads by half in 2010. The fact that solutions for providing access to such data, and especially to timely incremental updates ...
Read Project

 21

 FINISHED 
GEYSERS vision is to qualify optical infrastructure providers and network operators with a new architecture, to enhance their traditional business operations. Optical network infrastructure providers will compose logical infrastructures and rent them out to network operators; network operators will run cost-efficient, dynamic and mission-specific networks by means of integrated control and managem ...
Read Project

 20