Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Crisis incidents result in difficult working conditions for Urban Search-and-Rescue (USaR) crews. INACHUS aims to achieve a significant time reduction and increase efficiency in USaR operations by providing:1.Simulation tools for estimating the locations of survival spaces (after a structural collapse) and identify the location of survivors for different construction types and building materials2. ...
Read Project

 21

 FINISHED 

Towards a EU framework for the security of Widezones (ZONESEC)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Read Project

 19

 FINISHED 
FABRIC addresses directly the technological feasibility, economic viability and socio-environmental of dynamic on-road charging of electric vehicles.FABRIC responds to the need to assess the potential and feasibility of a more extensive integration of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of th ...
Read Project

 27

 FINISHED 
AdaptIVe will enhance the performance and improve the acceptance of automated driving of cars and trucks. The project develops new and integrated automated functions to improve traffic safety by minimizing the effects of human errors and to enhance traffic efficiency by smoother flows and reduced congestion.The approach is based on a shared control concept, assuring proper collaboration between th ...
Read Project

 32

 FINISHED 
"This work will provide a monitoring system for constructed facilities that will provide a near real time, reliable, and continuously updated assessment of the structural condition of the monitored facilities after a disaster, with enough detail to be useful for early and full recovery planning. The above assessment will be seamlessly integrated with automated, near real-time and continuously upda ...
Read Project

 10

 FINISHED 
LeanBigData aims at addressing three open challenges in big data analytics: 1) The cost, in terms of resources, of scaling big data analytics for streaming and static data sources; 2) The lack of integration of existing big data management technologies and their high response time; 3) The insufficient end-user support leading to extremely lengthy big data analysis cycles. LeanBigData will address ...
Read Project

 11

 FINISHED 

Support action for Vehicle and Road Automation network (VRA)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The improvement of sensors, power train control as well as communication, make possible the automation of vehicle driving. Vehicle prototypes are currently capable of driving automatically, in road and urban environment. The automation is provided by systems in the vehicle and/or deployed on the road infrastructure, so that the process is named Vehicle and Road Automation.Partial or full automatio ...
Read Project

 14

 FINISHED 

Harnessing Performance Variability (HARPA)

Start date: Sep 1, 2013, End date: Nov 30, 2016,

Application requirements, power, and technological constraints are driving the architectural convergence of future processors towards heterogeneous many-cores. This development is confronted with variability challenges, mainly the susceptibility to time-dependent variations in silicon devices. Increasing guard-bands to battle variations is not scalable, due to the too large worst-case cost impact ...
Read Project

 8

 FINISHED 
Southern Europe and the Mediterranean region are facing the challenge of managing its water resources under conditions of increasing scarcity and concerns about water quality. Already, the availability of fresh water in sufficient quality and quantity is one of the major factors limiting socio economic development. Innovative water management strategies such as the storage of reclaimed water or ex ...
Read Project

 23

 FINISHED 
In the past, customers invested in high cost, long service-life products. Today, they demand complex product-services capable of adapting to new customer goals and rapidly changing markets. The Use-it-wisely project will enable European manufacturers to operate successfully within this new paradigm.The project will investigate a new business model that implements continuous product-service adaptat ...
Read Project

 22

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Read Project

 27

 FINISHED 
AutoNet2030 shall develop and test a co-operative automated driving technology, based on a decentralised decision-making strategy which is enabled by mutual information sharing among nearby vehicles. The project is aiming for a 2020-2030 deployment time horizon, taking into account the expected preceding introduction of co-operative communication systems and sensor based lane-keeping/cruise-contro ...
Read Project

 13

 FINISHED 

Dynamic Social and Media Content Syndication for 2nd Screen (SAM)

Start date: Oct 1, 2013, End date: Oct 31, 2016,

Description The SAM project enables consumers to "socialise around media", via their second screens, where they are fed with relevant digital content created once and fully syndicated to all for maximum impact.Today people use “2nd screen” tablets or smartphones while watching their “1st screen” – typically a TV. They engage in activities ...
Read Project

 13

 FINISHED 
The latest developments in robotics and the associated fields of computer vision and sensors open the floor for automated robotic solutions, exploitable in the near to medium term in the field of inspection of the civil infrastructure in general and transportation tunnel infrastructure in particular. The latter infrastructure is ageing urgently requiring inspection and assessment. Presently, inspe ...
Read Project

 11

 FINISHED 

A Coherent and Rich PaaS with a Common Programming Model (CoherentPaaS)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Cloud data management, Big Data and the Internet of Things raise specific challenges with respect to scalable data management, both in real-time and offline. Big Data analytics puts the emphasis on large queries over big cloud data stores. The emerging Internet of Things applications also raise specific challenges with respect to real-time data management. Developing cloud applications at large s ...
Read Project

 13

 FINISHED 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

European cities face four main mobility problems: congestion, land use , safety and environment. One of the main causes of such problems is the car-ownership rate. The centres of large cities address this issue combining efficient mass transits with car restriction policies but peripheral areas and smaller cities remain dominated by private cars.CityMobil has demonstrated how automating road vehi ...
Read Project

 49

 FINISHED 
In a world of multi-stakeholder information and assets provision on top of millions of real-time interacting and communicating things, COSMOS aims at enhancing the sustainability of smart city applications by allowing IoT based systems to reach their full potential. COSMOS will enable things to evolve and act in a more autonomous way, becoming more reliable and smarter. Things will be able to lear ...
Read Project

 10

 FINISHED 

European Smart Mobility Resource Manager (MyWay)

Start date: Sep 1, 2013, End date: Feb 29, 2016,

For many decades, urban planning and transport evolved around the private car, which has resulted in problems such as congestion, noise, pollution, etc. To tackle these adverse impacts and improve the livability of Europe's cities, citizens today can benefit, next to the private vehicle, public transport and non-motorised modes, from a variety of new sustainable and complementary mobility schemes, ...
Read Project

 14

 FINISHED 
FastInCharge will last 36 months and be lead by a consortium of 9 partners (France, Spain, Greece, Bulgaria, Italia and Slovakia): 1 SME specialised in charging infrastructure for electric vehicles (DBT), 1 industrial group of automotive engineering (BATZ), 3 research organisations, specialists of contactless power, automotive engineering and energy management systems (Tecnalia, TU Gabrovo, NTU At ...
Read Project

 9

 FINISHED 
A significant amount of network capacity needs to be available throughout the disaster and affected areas to support effective Public Protection and Disaster Relief (PPDR) communications where mobility is the main requirement. At the very early response stages voice communications are critical, after which non-voice communications are an important requirement dependent on the nature of the disast ...
Read Project

 11

 FINISHED 

SMARTgrid KeY NEighborhood indicator cockpit (SMARTKYE)

Start date: Nov 1, 2012, End date: Apr 30, 2015,

SMARTKYE strategic goal is to develop a system for the future smart grid neighbourhood that will enable better business\ndecisions to be made based on real-time fine-grained data. Key end-users targeted are the public authorities who can monitor\nand manage key indicators in neighbourhoods with the goal of better energy efficiency and CO2 reduction.\nSMARTKYE results in short:\n- An open architect ...
Read Project

 7

 FINISHED 
"The E-SPONDER is a suite of real-time data-centric technologies which will provide actionable information and communication support to first responders that act during abnormal events (crises) occurring in critical infrastructures. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and ou ...
Read Project

 17

 FINISHED 
Cerebral Palsy (CP) is one of the most frequently conditions in childhood, with an incidence of 2 per 1,000 live births. In the EU there is 1.3 out of 15 million persons with CP in the world. This neurological disorder affects body movement, balance and posture and almost always is accompanied by other cognitive or sensory impairments like mental retardation, deafness and vision problems. The seve ...
Read Project

 11

 FINISHED 
Offering collective and participative experiences to real-world and online communities is at the heart of the Future Media Internet (FMI) and will form an essential part of entertainment, education, collaborative working, product and service innovation and advertising. Communities involved potentially include hundreds of professionals, tens of thousands at live public events and millions online. C ...
Read Project

 25

 FINISHED 

Building service testbeds on FIRE (BonFIRE)

Start date: Jun 1, 2010, End date: Dec 31, 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Read Project

 26

 FINISHED 
The goal of the VISION project is to advance the competitiveness of the EU economy by introducing a powerful ICT infrastructure for reliable and effective delivery of data-intensive storage services, facilitating the convergence of ICT, media and telecommunications. This infrastructure will support the setup and deployment of data and storage services on demand, at competitive costs, across dispar ...
Read Project

 13

 FINISHED 

Transatlantic TUmour MOdel Repositories (TUMOR)

Start date: Apr 1, 2010, End date: Sep 30, 2013,

The project aims at developing a European clinically oriented semantic-layered cancer digital model repository from existing EU projects that will be interoperable with the US grid enabled semantic-layered digital model repository platform at CViT.org (Center for the Development of a Virtual Tumor, Massachusetts General Hospital (MGH), Boston, USA) which is NIH/NCI-caGRID compatible. This interope ...
Read Project

 6

 FINISHED 

Building the PaaS Cloud of the Future (4CaaST)

Start date: Jun 1, 2010, End date: Aug 31, 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Read Project

 18

 FINISHED 
PowerUp aims to develop the Vehicle-2-Grid (V2G) interface, involving a full development cycle of physical/link-layer specification, charging control protocol design, prototyping, conformance testing, field trials, and standardisation. Its results will ensure that FEVs smoothly integrate into emerging smart-grid networks. Thereby the efficiencies resulting from robust grid operation may be achieve ...
Read Project

 11

 FINISHED 

Optimized Infrastructure Services (OPTIMIS)

Start date: Jun 1, 2010, End date: May 31, 2013,

With the challenges of service and infrastructure providers as the point of departure, OPTIMIS focuses on open, scalable and dependable service platforms and architectures that allow flexible and dynamic provision of advanced services.The OPTIMIS innovations can be summarized as a combination of technologies to create a dependable ecosystem of providers and consumers that will be the foundation of ...
Read Project

 16

 FINISHED 
Description New tools for application development on many-core systemsThe current trend in computing architectures is to integrate in embedded devices an increasing number of processing cores. Latest generation smart phones carry two processors plus graphic accelerators while in the near future we can envision to scale up to 16 or 32 proc ...
Read Project

 8

 FINISHED 
Description PONTE is a European project standing for Efficient Patient Recruitment for Innovative Clinical Trials of Existing Drugs to other Indications.PONTE provides a platform following a Service Oriented Architecture (SOA) approach that offers intelligent automatic identification of individuals eligible to participate in clinical trials ...
Read Project

 11

 FINISHED 

Low-cost Miniature Laserscanner for Environment Perception (MiniFaros)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Description Novel low-cost miniature Laserscanner for Advanced Driver Assistance Systems enhancing road safety The wish and determination for considerably fewer accidents have been pronounced by a number of European stakeholders, like the EU programme ‘Halving the number of road accident victims i ...
Read Project

 7

 FINISHED 

Science Night Out (SNO)

Start date: Jun 1, 2012, End date: Dec 31, 2012,

"The main idea of the “Science Night Out” proposal is to offer to the general public a night of going out and enjoying themselves with science.A common opinion that goes around when people are talking about science is that it is boring and somehow not relevant to their everyday life and personal interests. Researchers are though of as people with grey hair and white robes hiding inside their – if ...
Read Project

 2

 FINISHED 
"Bone fractures represent a major health problem in the increasingly elder population. The correct prediction of bone fracture risk in bone disease, e.g. osteoporosis, is a mandatory issue for the prevention of traumatic events and related medical efforts. The assessment of the fracture risk is based on the clinical evaluation of bone mineral density, but with an estimation error ranging from 20% ...
Read Project

 1

 FINISHED 

Policy Simulation in Virtual Spaces (+Spaces)

Start date: Jan 1, 2010, End date: Sep 30, 2012,

Positiv Spaces (+Spaces) aims to provide novel technologies and instruments that will allow government bodies to measure public opinion on a large scale and seize the outcomes of prospective policy measures by leveraging the power of the communities. From the +Spaces perspective, Virtual Spaces (VS) form a vast reserve of group knowledge that, once aggregated and properly processed, can be incorpo ...
Read Project

 8

 FINISHED 

Controlling Chronic Diseases related to Metabolic Disorders (METABO)

Start date: Jan 1, 2008, End date: Aug 31, 2012,

The aim of METABO is to set up a comprehensive platform, running both in clinical settings and in every-day life environments, for continuous and multi-parametric monitoring of the metabolic status in patients with, or at risk of, diabetes and associated metabolic disorders.The type of parameters that will be monitored, in addition to traditional clinical and biomedical parameters, will also inc ...
Read Project

 27

 FINISHED 

Self-Configurable Cognitive Video Supervision (SCOVIS)

Start date: Mar 1, 2008, End date: Feb 28, 2011,

SCOVIS will investigate weakly supervised learning algorithms and self-adaptation strategies for analysis of visually observable procedures. SCOVIS research directly affects ease of deployment and minimises effort of operation of monitoring systems and is unique in the sense that it links object learning using low-level object descriptors and procedure learning with adaptation mechanisms and activ ...
Read Project

 7

 FINISHED 
Small European companies compete on their know-how and hence have to use knowledge to their advantage. They are constrained by the scarcity of their resources such as land, labor, and capital, thus they must do more with less. As a result, knowledge housed in European SMEs, must be leveraged so that goals can be achieved in an effective and efficient manner. However, knowledge management programs ...
Read Project

 9

 FINISHED 
The regions of southeast Mediterranean are characterized by expanded inner space and isolated areas. Those makes difficult the socially, technologically, and economical integration and consequently, the equally and efficient provision of services like health care services. The main objective of the project INTERMED is to implement a platform that will enhance the provision of medical services for ...
Read Project

 5