Search for European Projects

38 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This proposal responds to the first Open Calls issued by the Shift2Rail Joint Undertaking, as part of Shift2Rail Horizon 2020 programme. It specifically addresses the topic S2R-OC-IP5-03-2015: Intelligent freight wagon with predictive maintenance. This topic is complementary with topic S2R-CFM-IP5-02-2015: Start-up activities for Freight Automation. The INNOWAG project will work towards increasing ...
Read Project

 11

 FINISHED 
The establishment of good governance will effectively secure the confidence of the industry to use the Interoperability Framework (IF) semantic technologies that will be established under the IP4 Shift2Rail program. The objective of the Governance of the IF for Rail and Intermodal Mobility (GoF4R) project is to define sustainable governance for the IF that will create the right conditions to intro ...
Read Project

 16

 FINISHED 

Semantic Transformations for Rail Transportation (ST4RT)

Start date: Nov 1, 2016, End date: Oct 31, 2018,

The objective of the proposal is research in semantic, ontology based automation of transformations between heterogeneous data formats, and its application to a complex ‘after-sales’ process use case in an actual run-time demonstration scenario. The technology will leverage Shift2Rail Interoperability Framework (IF) components developed in the IT2Rail “lighthouse” project, extending it for use in ...
Read Project

 8

 FINISHED 
DYNAFREIGHT stands for Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains. The project will provide inputs for the development of the next railway freight propulsion concepts within S2R. Two main areas will be addressed: 1. Freight running gear for locomotives: DYNAFREIGHT will design and develop the necessary concepts that will allow a locomotive fre ...
Read Project

 11

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 

Satellite Technology for Advanced Railway Signalling (STARS)

Start date: Feb 1, 2016, End date: Jan 31, 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Read Project

 18

 FINISHED 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Read Project

 34

 FINISHED 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Start date: May 1, 2015, End date: Oct 31, 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Read Project

 33

 FINISHED 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Read Project

 48

 FINISHED 
This proposal specifically addresses the topic MG.9.6-2014. Strengthening the research and innovation strategies of the transport industries in Europe.The aim of SETRIS is to deliver a cohesive and coordinated approach to research and innovation strategies for all transport modes in Europe. To fulfil the aim of SETRIS, the following objectives are envisaged:1. To identify synergies between the tra ...
Read Project

 18

 FINISHED 

Next Generation Train Control (NGTC)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Read Project

 21

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 
The transportation industry has for a long time been engaged in the application of new lightweight materials for primary structural design in an effort to develop more energy efficient structures to meet low emissions targets without compromising public safety.This is also true for the rail industry, but the implementation of new lightweight materials has been slow mainly due to the lack of suita ...
Read Project

 19

 FINISHED 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Read Project

 20

 FINISHED 

Eddy CUrrent Brake Compatibility (ECUC)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

The ECUC (Eddy-Current Brake Compatibility) project's objective is to prove that linear eddy-current brake (ECB) is a very effective and applicable solution for increasing the braking capacity of new high speed trains and solving the concerns raised by infrastructure managers by proposing concrete and realistic solutions to overcome the drawbacks that ECB have experienced on some lines.This propos ...
Read Project

 9

 FINISHED 
"A sustainable and efficient freight transport in Europe plays a vital role in having a successful and competitive economy. Freight transport is expected to grow by some 50 % (in tonne-kilometres) by 2020. However rail has, in many areas, been displaced from a dominant position as road transport services have grown and developed in capability and levels of sophistication that have not been matche ...
Read Project

 31

 FINISHED 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Read Project

 18

 FINISHED 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Read Project

 15

 FINISHED 

European Railway Electromagnetic Compatibility (EUREMCO)

Start date: Oct 1, 2011, End date: Dec 31, 2014,

The current authorisation process for placing into service rail vehicles according to Technical Specifications for Interoperability and national safety rules is a very long and costly process. The Technical Specifications for Interoperability (TSI) provide common regulations for the placing in service of rail vehicle, when such common understanding and harmonized rules exist. This is not the case ...
Read Project

 19

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 

Make Rail The Hope for protecting Nature (MARATHON)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

MARATHON aims at extracting the maximum productivity from the existing rail infrastructure for producing efficiency, reducing operating costs and attracting new traffic to rail.This represents a market requirement for producing efficiency, reducing operating costs and attracting new traffic to rail. In fact, due to its fragmentation, the railway system efficiency is created through harmonisation a ...
Read Project

 19

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 
"EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, r ...
Read Project

 24

 FINISHED 
"Rail traffic has increased much in the last decade. This development and the need for model shift from road to rail to decrease CO2 emission, creates a challenge for the railway industry to improve capacity in the network while the need of capacity for maintenance also increases.The challenge of the project is to do more effective inspection and maintenance in less time.Therefore the project focu ...
Read Project

 18

 FINISHED 

Clean European Rail - Diesel (CleanER-D)

Start date: Jun 1, 2009, End date: Jan 31, 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Read Project

 27

 FINISHED 
TIGER Project developed under the 7FP addresses the issues of promoting sustainable logistics introducing innovative railway services connecting the sea ports of the European Union with the Hinterland. This is done with particular attention to the flows generated to/from the Far East and South East Asia, involving all European major Ports, suffering from traffic congestion. In particular, two Nort ...
Read Project

 19

 FINISHED 

Railway Induced Vibration Abatement Solutions (RIVAS)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

"Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. ...
Read Project

 27

 FINISHED 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Read Project

 23

 FINISHED 

Supporting the Transport Research Arena 2012 conference (TRA2012)

Start date: Jan 1, 2011, End date: Dec 31, 2012,

"This project will give support for organising and promoting the Transport Research Arena 2012 in Athens. It will reinforce the scientific excellence of the conference and cement its position as the main transport research event in Europe.The fourth Transport Research Arena (TRA) will be organised in Athens, Greece, in April 2012 and is expected to be supported by five stakeholder organisations; : ...
Read Project

 11

 FINISHED 

Transport Fire Safety Engineering in the European Union (TRANSFEU)

Start date: Apr 1, 2009, End date: Nov 30, 2012,

There is an urgent need to have a confident toxicity measurement methodology that contributes to the existing level of surface transport fire safety, which is the most difficult issue to assess in case of fire. The lack of confidence in the robustness of the existing product toxicity classification forbids its acceptance as a standard which prevent the European industry from common safety rules an ...
Read Project

 22

 FINISHED 
The recent EU Commission paper on the establishment of a “Primary European Rail Freight Network” is the confirmation that Europe wants to develop a long term freight sustainable mobility.Infrastructure investments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the ...
Read Project

 23

 FINISHED 

Modular Urban Transport Safety and Security Analysis (MODSafe)

Start date: Sep 1, 2008, End date: Aug 31, 2012,

The European Urban Guided Transport sector (Light rails, Metros, but also Tramways and Regional Commuter trains) is still characterized by a highly diversified landscape of Safety Requirements, Safety Models, Responsibilities, Roles, Safety Approval, Acceptance and Certification Schemes. While a certain convergence in architectures and systems can be observed the safety life cycle still differs f ...
Read Project

 22

 FINISHED 

ERRAC Road Map

Start date: Jun 1, 2009, End date: Jul 31, 2012,

ERRAC- ROADMAP covers research related to all types of freight and passenger rail services as well as their interaction with other modes within the transport system (High Speed and conventional rail over long, medium and short distances, as well as urban rail and co-modal services), the implementation of such research, and to support the various activities of the European Rail Research Advisory Co ...
Read Project

 21

 FINISHED 
"The current interoperability approval process for new High Speed and Conventional railway vehicles in Europe is a very long and costly process. The Technical Specifications for Interoperability provide common regulations for the homologation of new rolling stock but do not directly eliminate the current burdens regarding new vehicle approval on each network. In this context, the pantograph/catena ...
Read Project

 16

 FINISHED 
"The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. AEROTRAIN will help meet the business sce ...
Read Project

 18

 FINISHED 
The environmental, societal, and economic drivers of an efficient urban transport system are well acknowledged and are reflected in the local transport plans of all major urban areas. The overall concept of the project is to facilitate the achievement of this goal by generating solutions to currently identified barriers that form the project imperatives, which have been established through close c ...
Read Project

 16

 FINISHED 

INtegrated European Signalling System (INESS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Read Project

 31

 FINISHED 
"The purpose of SKILLRAIL is to contribute to the enhancement of the transport sector by fostering a better match between the human resources needs to make railways a more competitive and innovative sector and the offer of skills coming out of the different research based education and training institutions across Europe.Rail transport in Europe is a future-oriented industry and is striving to off ...
Read Project

 10