Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The EU and Turkey face mounting challenges both in relation to one another and internationally. The EU is confronted with an economic crisis which is likely to make differentiation a growing phenomenon. Turkey faces polarisation between different political forces, the state and civil society. The neighbourhood is unravelling to the east and south and a power shift is under way at global level. Thi ...
Read Project

 15

 FINISHED 
The project HERITAG aims to develop an interdisciplinary reform in higher education programmes at master level and continuing education integrating Geo-information Technologies (GIT) applied to cultural heritage documentation, tourism management and entrepreneurship.The project promotes the synergy of three main groups of stakeholders: Universities, industry and Administration. The curricular refo ...
Read Project

 16

 FINISHED 

BIOMECHATRONIC EPP UPPER LIMB PROSTHESIS (BIOMECHATRONICS EPP)

Start date: Aug 16, 2013, End date: Apr 16, 2018,

Upper limb prostheses have made considerable scientific progress in the last 20 years. This progress though is based on velocity control, which is not the best option for subconscious control. Extended Physiological Proprioception (EPP) provides position control and has been proven to be better as a control methodology for upper-limb prostheses than velocity control. EPP is difficult to implement ...
Read Project

 1

 FINISHED 
The innovative and challenging objective of the MASTER project is the numerical modeling and optimum design of complex carbon nanotube (CNT)-reinforced composite morphologies, via a novel and computationally efficient molecular mechanics-based, multiscale stochastic numerical simulation approach, in conjunction with a robust optimization methodology. The rationale of the project is to propose a ge ...
Read Project

 1

 FINISHED 

Critical State Soil Mechanics Revisited: Fabric Effects (SOMEF)

Start date: Mar 1, 2012, End date: Feb 28, 2018,

The theory of Critical State Soil Mechanics (CSSM) has become a paradigm within the framework of which elastoplastic soil constitutive models have been developed for the last 50 years. The present project will constructively challenge this paradigm from a missing fundamental perspective, namely the effect of soil fabric on the premises of CSSM.The current CSSM postulates that at critical state the ...
Read Project

 4

 FINISHED 
"MARS will support managers and policy makers in the practical implementation of the WFD, of related legislation and of the Blueprint to Safeguard Europe’s Water Resources by conducting new research and synthesising existing knowledge concerning effects and management of multiple stressors in surface water and groundwater bodies; by advising the 3rd RMBP cycle and the revision of the WFD; and by d ...
Read Project

 25

 FINISHED 

Nanostructured Biocompatible/Bioactive Materials (NanoBioMat)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

The primary goal of the Joint Exchange Program (Project) is to create multicomponent materials for biomedical applications and to combine knowledge and experience of the different scientific groups concerning interdisciplinary milestones of the proposal in order to deliver the final product.In the framework of the Project the following materials: porous and nonporous silica oxides, nanostructured ...
Read Project

 4

 FINISHED 
With numerous European industries heavily depended on imported REE raw materials, there is a need for EU to secure a viable supply of REE minerals as well as develop from the ground up the currently non-existent European REE extraction and processing industry. The goal of the EURARE project will be (i) to characterize the potential REE resources in Europe; and (ii) to research, develop, optimize a ...
Read Project

 23

 FINISHED 
The main objectives of DESSIN are- To demonstrate and promote innovative solutions to water-related challenges with a focus on: (i) water quality issues related to the implementation of the Water Framework Directive (WFD) and (ii) water scarcity.- To demonstrate a methodology for the valuation of ecosystem services (ESS) as catalyser for innovation in water management.DESSIN will launch demonstrat ...
Read Project

 21

 FINISHED 
"Innovative processes with streamlining and improved control will be conducted in FIBRALSPEC, through Unit for Continuous PAN-based Carbon Fiber Pilot Production. Testing of laminates and prepregs production based the new developed carbon fibres followed by manufacturing of laminates/coupons and high-performance filament wound tubes are also foreseen (equipment for delivering precise volumes the m ...
Read Project

 11

 FINISHED 

Preparing for Extreme And Rare events in coastaL regions (PEARL)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Coastal floods are one of the most dangerous and harmful natural hazards affecting urban areas adjacent to shorelines. Rapid urbanisation combined with climate change and poor governance means a significant increase in the risk of local surface flooding coinciding with high water levels in rivers and high tide or storm surges from the sea, posing a greater risk of devastation to coastal communiti ...
Read Project

 26

 FINISHED 
The BYEFOULING project will address high volume production of low toxic and environmentally friendly antifouling coatings for mobile and stationary maritime applications. The technology will fulfil the coating requirements as a result of the incorporation of novel antifouling agents and a new set of binders into coating formulations for maritime transportation and fishing vessels, floating devices ...
Read Project

 19

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 

THE MICRO ALGAE BIOREFINERY (D-FACTORY)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

The D-Factory aims to set a world benchmark for a sustainable biorefinery based on biomass from halophilic microalgae. Representing the largest (100s ha) of current commercial cultivation technologies for any microalga, Dunaliella microalgal biomass production uses raceways and lakes, and will be expanded with biorefinery concepts by drawing in European innovations in key biomass processing techno ...
Read Project

 14

 FINISHED 

AdVanced Aerodynamic Tools for lArge Rotors (AVATAR)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The motivation for the AVATAR project lies in the fact that upscaling wind turbine designs towards 10-20 MW requires radical innovations to make this feasible. Many of these innovationshave a strong aerodynamic component and can be considered as unconventional from an aerodynamic point of view. As such the analysis of the resulting rotor designs falls outside the validated range of applicability o ...
Read Project

 14

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 
"ECCO-MATE aims to create a research and training platform for the development and implementation of novel fuel mixture preparation, injection profiling, air management and staged/low temperature combustion technologies both in marine and light-duty automotive diesel engines. The marine (slow speed, large-sized, two-stroke engines) and land-transport (high speed, small-to-medium-sized, four-stroke ...
Read Project

 12

 FINISHED 
...mpatible with the existing pipeline network and storage infrastructure.The realisation of the P2G technology as proposed within HELMETH needs several development steps and HELMETH focuses on two main technical and socio-economic objectives, which have to be met in order to show the feasibility of the technology:• Elaboration of the conditions / scenarios for an economic feasibility of the P2G proc ...
Read Project

 7

 FINISHED 
In vapour-compression cycles (VCC) and more specifically in heat pumps, mechanical work is supplied to the compressor for increasing the pressure of the evaporated refrigerant. Heat is rejected in the condenser (effective heating at heating mode), for the condensation of the refrigerant, which is then expanded in a throttle valve (no power produced), in order to decrease its pressure, resulting to ...
Read Project

 8

 FINISHED 
Since 2008, Europe has been shaken by an ongoing crisis. If relevant parts of populations are exposed to socioeconomic risks, it is a distinctive characteristic of European political ethics that they must not be left alone, but should be subject to support and solidarity by budget support policy, economic development policies and social policy at different levels. But, in analogy with medical and ...
Read Project

 10

 FINISHED 

New Technologies for Tunnelling and Underground Works (NETTUN)

Start date: Sep 1, 2012, End date: Feb 28, 2017,

...TUN 54M project will enable groundbreaking change in the construction, management and maintenance of tunnels in pursuit of the goals of NMP.2011.4.0-2 via 9 focussed WPs addressing key scientific and technical challenges: (i) a multi-sensor ground prediction system for TBMs to enable effective look-ahead during boring; (ii) a robotic maintenance system that enables automation of inspection and exc ...
Read Project

 24

 FINISHED 
The project aims to deal with the numerous requirements of facade panel retrofitting by developing a light-weight, durable, cost effective and high performance panel. Its layered structure allows for separate but also synergistic function regarding high thermal and acoustic insulation, excellent mechanical properties, up to standards flame retardancy and photocatalytic activity. Employing nanofill ...
Read Project

 10

 FINISHED 
...nges. It promises to redefine fall prevention by motivating people to be more active, in a friendly way and with tele-supervision if necessary. By covering the entire value-chain (academics: National Technical University of Athens, University of Orléans, University of Barcelona; private research organization: CEIT; Industry: SingularLogic, BRAINSTORM, MEDeTIC, health service provider: MEDeTIC), KI ...
Read Project

 8

 FINISHED 
...ngs together high-level key expertise from the European creative industries, technology-based enterprises, the cultural heritage sector and higher education.Europeana Space will build 3 Spaces, the Technical, Content and Innovation Spaces: physical and virtual environments to enable the creative re-use of cultural content. They will contain online guidelines and tools, a technical framework; a p ...
Read Project

 29

 FINISHED 

Europeana Sounds

Start date: Feb 1, 2014, End date: Jan 31, 2017,

The Europeana Sounds is Europeana's 'missing' fifth domain aggregator, joining APEX (Archives), EUscreen (television), the Europeana Film Gateway (film) and TEL (libraries). It will increase the opportunities for access to and creative re-use of Europeana's audio and audio-related content and will build a sustainable best practice network of stakeholders in the content value chain to aggregate, en ...
Read Project

 24

 FINISHED 
eNanoMapper will develop a data management and analysis infrastructure together with ontologies supporting the safety assessment activities of the European Nanomaterials research and development community. The project will address the requirements of safety assessment of nanomaterials by providing databases, analysis tools and ontologies for risk assessment and linking them with existing resources ...
Read Project

 11

 FINISHED 
Construct-PV will develop and demonstrate customizable, efficient, and low cost BIPV for opaque surfaces of buildings. Opaque surfaces are selected because they represent massive wide-area spaces of untapped harvesting potential across Europe. To develop highly efficient systems, most promising PV technologies have been selected, i.e. back contact cells fabricated with MWT technology, extensively ...
Read Project

 12

 FINISHED 
The project aims to support the advancement of the bi-regional STI policy dialogue between the EU MS/AC and the Eastern Partnership countries, with an explicit focus on the Societal Challenges that have been identified to be of mutual interest for the two regions, namely Climate Change, Energy and Health. In particular the project will identify actions and stakeholders and will implement innovativ ...
Read Project

 21

 FINISHED 
The building envelope (roof, façade and basements) is the key element to address in order to achieve the energy efficiency in the retrofitting of buildings, where the façade represent the largest part of the heat transmission surface and includes a number of critical components (like windows, balconies, ventilation units,etc) and thermal bridge phenomena.The present project aims to develop an ener ...
Read Project

 18

 FINISHED 
... order to establish reliable analysis and design procedures and to provide background for an update of current structural codes. The adopted approach starts from material and technology development. Technical and economical feasibility of the envisaged construction systems will be demonstrated by performing parallel experimental and theoretical studies and will be validated by prototypes construct ...
Read Project

 16

 FINISHED 
Saving energy and water in the Dairy industry, by introducing innovations in the processing plant. Namely RF heating, solar thermal energy, mono-disperse atomising, dryer modelling, inline monitoring, cleaning with enzymes and membrane technology. With these technologies energy and water loops are closed instead of lost in the plant. These technologies will be demonstrated in pilot facilities.The ...
Read Project

 19

 FINISHED 

New Generation of orthopaedic Biomaterials (NEWBIOGEN)

Start date: Aug 1, 2014, End date: Oct 31, 2016,

Biomaterials industry and especially the orthopaedics sector represent a large market globally with growth rates of 7-15%. Unfortunately current biomaterials are not optimal and cause pain and distress to a large number of patients. Particularly their life cycle is very small compared to the average starting age of musculoskeletal disorders. The raw materials used can cause neurological problems a ...
Read Project

 11

 FINISHED 

Energy Efficient Safe SHip OPERAtion (SHOPERA)

Start date: Oct 1, 2013, End date: Oct 31, 2016,

The 2012 guidelines on the attained Energy Efficiency Design Index (EEDI) for new ships (MEPC.212(63)) represent a major step forward in implementing the REGULATIONS ON ENERGY EFFICIENCY OF SHIPS (resolution MEPC.203(62)). There are, however, serious concerns regarding the sufficiency of propulsion power and of steering devices to maintain the manoeuvrability of ships in adverse conditions, hence ...
Read Project

 23

 FINISHED 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Read Project

 18

 FINISHED 
Directed self-assembly (DSA) of block copolymers is one of the most promising techniques to enable the continued miniaturization of ICs and to boost the performance in More Moore. It combines top-down photolithography for creation of guiding patterns with engineered new materials and processes to facilitate cost effective bottom-up techniques for pattern density multiplication and defect rectifica ...
Read Project

 7

 FINISHED 

Adjoint-based optimisation of industrial and unsteady flows (AboutFlow)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

Adjoint-based methods have become the most interesting approach in CFD optimisation due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are members of the EC FP7 project FlowHead which develops ...
Read Project

 9

 FINISHED 

AdS/CFT beyond the N=4 SYM paradigm (AdSCFTbNf)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

This proposal concerns research in the direction of finding string theory duals for gauge theories beyond the N = 4 universality class; theories that have genuinely less supersymmetry and unquenched flavor. Arguably, the next simplest example afterN= 4 SYM is N=2 SU(N_c) SYM coupled to N_f=2N_c fundamental hypermultiplets.The theory admits a Veneziano expansion of large N_c and large N_f, with N_f ...
Read Project

 1

 FINISHED 
Cities are expected to play a key role in the implementation of Europe 2020 strategy. The city authorities need to lead relevant actions towards energy-efficient neighborhoods. Engaging city authorities in this respect is of paramount importance.Although there are plenty of energy and other related data sets available in city level, their appropriate integration for local authorities' decision sup ...
Read Project

 12

 FINISHED 
Exaflop computing will make a considerable impact on several areas of engineering and applied sciences, where current high-end computing capabilities are deemed grossly insufficient. The overall aim of the NUMEXAS project is to develop, implement and validate the next generation of numerical methods to be run under exascale computing architectures. This will be done by implementing a new paradigm ...
Read Project

 5

 FINISHED 

Policy Compass

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The main goal of the project is to develop a research prototype of an easy-to-use, highly visual and intuitive tool for social networks and e-participation platforms, called the Policy Compass, enabling citizens and public officials to easily create, apply, share, embed, annotate and discuss causal models, charts and graphs of historical data from trusted open data sources. The aim is to develop m ...
Read Project

 7