Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The manufacturing industry is entering a new era in which new ICT technologies and collaboration applications are integrated with traditional manufacturing practices and processes, which brings virtual organisations to factories, i.e. Manufacturing 2.0. Virtual factory to future manufacturing slows the flexible amalgamation of manufacturing resources in multiple organisations to create timely, dem ...
Read Project

 5

 FINISHED 
...ersectoral organisation of the consortium with partners from academia and companies that need these future experts to develop new instruments, screen drugs and chemicals in living systems and develop software to analyse and model medical images. The full training programme is based on an optimal balance between training through research and many network-wide training events, including conferences ...
Read Project

 11

 FINISHED 
PrEstoCloud project will make substantial research contributions in the cloud computing and real-time data intensive applications domains, in order to provide a dynamic, distributed, self-adaptive and proactively configurable architecture for processing Big Data streams. In particular, PrEstoCloud aims to combine real-time Big Data, mobile processing and cloud computing research in a unique way th ...
Read Project

 11

 FINISHED 
...or increased security, data protection privacy and vast resource (de)-allocation. Towards this end, and building upon this umbrella concept, the Unicorn vision can be considered two-fold: to enable software developers to design and develop secure and elastic applications and to increase the awareness of all stakeholders, in particular SMEs and Startups. Unicorn will ...
Read Project

 11

 FINISHED 
...ment teams for these platforms and the contributions will be released back to the used platforms as open source. The integrated MELODIC platform will be maintained and exploited by a professional software house, and tested in several demanding real world applications: scalable Customer Relationship Management, real-time optimised traffic routing, and fast and scalable processing of genomic data.
Read Project

 7

 FINISHED 
The OPENHYBRID project will overcome the technical and commercial barriers of current hybrid manufacturing systems to deliver a single manufacturing system capable of undertaking a wider range of processes in a seamless automated operation. The new system will offer unrivalled flexibility in terms of materials, including the ability to switch between powder and wire feed-stock within a single part ...
Read Project

 14

 FINISHED 
Current practice is such that a production system is designed and optimized to execute the exact same process over and over again. The planning and control of production systems has become increasingly complex regarding flexibility and productivity, as well as the decreasing predictability of processes. The full potential of open CPS has yet to be fully realized in the context of cognitive autonom ...
Read Project

 16

 FINISHED 
...N will collaborate to the consolidation of the Hybrid Manufacturing value chain by means of a consortium specially selected for linking research results to technological necessities in the fields of software, monitoring, automation, materials, standardization and end-users.KRAKEN machine will be devoted to the production and reparation of functional parts of any size with dimensional tolerances un ...
Read Project

 15

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 
"Industry 4.0 is the next developmental stage in the organisation of the manufacturing value chain. ICT-based systems will play a major role, mainly by creating a virtual copy of the physical world and facilitating decentralised structures through Cyber-Physical Systems (CPS). Over the IoT, CPS cooperate with each other and humans in real-time. Via the Internet-of-Services, internal and cross-orga ...
Read Project

 9

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Industrial optimal design using adjoint CFD (IODA)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Adjoint-based methods have become the most interesting approach in numerical optimisation using Computational Fluid Dynamics (CFD) due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are member ...
Read Project

 10

 FINISHED 
The objective of the BIG IoT project is to ignite really vibrant Internet of Things (IoT) ecosystems. We will achieve this by bridging the current interoperability gap between the vertically integrated IoT platforms and by creating marketplaces for IoT services and applications. Despite various research and innovation projects working on the Internet of Things, no broadly accepted professional IoT ...
Read Project

 14

 FINISHED 

Holistic Benchmarking of Big Linked Data (HOBBIT)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

... of the BLD lifecycle. In contrast to existing benchmarks, we will provide modular and easily extensible benchmarks for all industry-relevant BLD processing steps that allow to assess whole suites of software that cover more than one step.The infrastructure necessary to run the evaluation campaigns will be made available. Our architecture will rely on web interfaces and cloud infrastructures to en ...
Read Project

 12

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Start date: May 1, 2015, End date: Oct 31, 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Read Project

 19

 FINISHED 
MAYA aims at developing simulation methodologies and multidisciplinary tools for the design, engineering and management of CPS-based (Cyber Physical Systems) Factories, in order to strategically support production-related activities during all the phases of the factory life-cycle, from the integrated design of the product-process- production system, through the optimization of the running factory, ...
Read Project

 11

 FINISHED 

Multi-ObjecTive design Optimization of fluid eneRgy machines (MOTOR)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The MOTOR project focuses on ICT-enabled design optimization technologies for fluid energy machines (FEMs) that transfer mechanical energy to and from the fluid, in particular for aircraft engines, ship propellers, water turbines, and screw machines. The performance of these machines essentially depends on the shape of their geometry, which is described by functional free-form surfaces. Even small ...
Read Project

 11

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Clouds and mobile applications have been two key drivers for innovation in the last decade, strengthening industry competitiveness and economic growth. The current technological and social landscape calls for a shift towards the introduction of a hybrid computing paradigm, following the rise and limitations of mobile applications. BASMATI aims at providing a complete ecosystem that integrates clou ...
Read Project

 5

 FINISHED 

5G Exchange (5GEx)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

... unification via NFV/SDN compatible multi-domain orchestration by producing (i) an open platform enabling cross-domain orchestration of services over these multiple domains, with a set of open source software tools and extensions that can be utilised outside the scope of 5GEx; (ii) a Sandbox Network enabling experimentation and validation of the devised architecture, mechanisms, and business model ...
Read Project

 20

 FINISHED 
China is already an important global actor in the fields of research and innovation, and has the potential of becoming a leading force in the next few decades. The shift in China’s strategy focusing towards R&I and transforming the essence of its economy has been complimented with massive public investments in research and technology. The EU having recognised the leading role China is expected to ...
Read Project

 13

 FINISHED 

Synergistic Fouling Control Technologies (SEAFRONT)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

Marine biofouling, the unwanted colonization of marine organisms on surfaces immersed in seawater has a huge economic and environmental impact in terms of maintenance requirements for marine structures, increased vessel fuel consumption, operating costs, greenhouse gas emissions and spread of non-indigenous species. The SEAFRONT project will aim to significantly advance the control of biofouling a ...
Read Project

 19

 FINISHED 
The vision of PaaSword is to maximize and fortify the trust of individual, professional and corporate customers to Cloud -enabled services and applications, to safeguard both corporate and personal sensitive data stored on Cloud infrastructures and Cloud-based storage services, and to accelerate the adoption of Cloud computing technologies and paradigm shift from the European industry. Thus, PaaSw ...
Read Project

 10

 FINISHED 
The objective of DREAMS is to develop a cross-domain architecture and design tools for networked complex systems where application subsystems of different criticality, executing on networked multi-core chips, are supported.DREAMS will deliver architectural concepts, meta-models, virtualization technologies, model-driven development methods, tools, adaptation strategies and validation, verification ...
Read Project

 16

 FINISHED 
EURenOmics will integrate several established consortia devoted to rare kidney diseases with eminent need and potential for diagnostic and therapeutic progress (i.e. steroid resistant nephrotic syndrome, membranous nephropathy, tubulopathies, complement disorders such a haemolytic uraemic syndrome, and congenital kidney malformations). The Consortium has access to the largest clinical cohorts asse ...
Read Project

 29

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 

Accelerated Checkpoint Design Integration Test and Evaluation (XP-DITE)

Start date: Sep 1, 2012, End date: Jul 31, 2017,

The aim of the XP-DITE project is to develop, demonstrate and validate a comprehensive, passenger centred approach to the design and evaluation of integrated security checkpoints (CPs) at airports. The approach encompasses a variety of different types of requirements, relating to security, airport operations and societal aspects. An ethical framework will be defined which enables designers and op ...
Read Project

 15

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Automated Comparison of X-ray Images for cargo Scanning (ACXIS)

Start date: Sep 1, 2013, End date: May 31, 2017,

The main objectives of the project ACXIS are to develop a manufacturer independent reference data base for X-ray images of illegal and legitimate cargo, procedures and algorithms to uniform X-ray images of different cargo scanners and measurement parameters, and an automated identification of potentially illegal cargo. Historic images of real detections and images of illegal cargo mock-ups as well ...
Read Project

 7

 FINISHED 
Most things we rely on in our everyday life will contain sensors and electronic-based information and have enough computing power to run embedded software applications which connect to the Internet and clouds to get access to virtually unlimited resources. This future computing continuum, composed of a wide set of heterogeneous platforms, promises to be a fertile environment to engineer advanced s ...
Read Project

 7

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

SmArt water management with Integrated Decision support systems (SAID)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

"The need for providing high quality water to citizens and to reduce damages produce by floods and droughts has motivated research and development of many software-based decision support systems (DSSs). However, despite the notable technical advances DSSs, most of the water infrastructures in Europe are still managed by expert operators based on traditional best practices but with little support f ...
Read Project

 11

 FINISHED 
...aging HPC resources. Workflows are of key importance in today's product/production development processes were products show ever increasing complexity integrating geometry, mechanics, electronics and software aspects. Such complex products require multi-domain simulation, simulation-in-the-loop and synchronized workflows based on interoperability of data, services and workflows.CloudFlow is an SME ...
Read Project

 29

 FINISHED 
...competitive advantage and the quality of service delivered to their customers, making their offerings more appealing and improving their outreach to potential customers, particularly the pan-European software industry. PaaSport will also facilitate European Software SMEs to deploy business applications on the best-matching Cloud PaaS and to seamlessly migrate these applications on demand. Therefor ...
Read Project

 12

 FINISHED 

xLiMe – crossLingual crossMedia knowledge extraction (xLiMe)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Europe is different from other large media markets such as the US or China in that information is being generated in different languages and distributed via diverse streams of localised media channels. Automatic analysis is complicated further by different content types (audio, video, text) and different channels (mainstream, social media). Thus, information can only be analysed independently for ...
Read Project

 9

 FINISHED 

REVEALing hidden concepts in Social Media (REVEAL)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Description Revealing hidden concepts in social media.The world of media and communication is currently experiencing enormous disruptions: from one-way communication and word of mouth exchanges, we have moved to bi- or multidirectional communication patterns. No longer can a selected few (e.g. media organisations and controllers of commun ...
Read Project

 11

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Start date: Oct 1, 2011, End date: Sep 30, 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Read Project

 45