Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 
Five major global semiconductor companies are working in the G450C consortium based in Albany N.Y. to introduce 450mm wafer semiconductor processing and are now installing the first wave of 450mm prototype systems. Intel and TSMC lead this effort with published roadmaps showing pilot lines in 2016, production in 2018. Samsung will soon follow which will force GlobalFoundries, SK Hynix, Toshiba, UM ...
Read Project

 12

 FINISHED 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Read Project

 13

 FINISHED 

European 450mm Equipment Demo Line (E450EDL)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Read Project

 44

 FINISHED 

European E&M 450mm Pilotline Readiness (EEM450PR)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

Aim of the EEM450PR project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative. It will also bring about the start of a vision to place an equipment development pilot line in the imec facility in Leuven. This will provide Europe with a complementary activity for 450mm equi ...
Read Project

 32

 FINISHED 

European 450mm Equipment & Materials Initiative (EEMI 450)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

Large-scale semiconductor fabrication is now standardised on 300mm diameter wafers. However, as demand grows and node dimensions diminish, major chipmakers are considering offsetting the growing costs of miniaturisation by increasing wafer size to 450mm to cut cost per produced die. A prerequisite is the availability of the required quality wafers and equipment able to handle larger wafers. The EN ...
Read Project

 27