Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 

European Prevention of Alzheimer’s Dementia Consortium (EPAD)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

Background:The secondary prevention of Alzheimer’s dementia (AD) is achievable if we can identify individuals at risk of disease progression defined by biomarker evidence of AD pathology and no or only minimal clinical symptoms and engage them in a standing adaptive clinical trial, of the highest quality, testing multiple interventions. To achieve this, EPAD will also provide the analytical infras ...
Read Project

 40

 FINISHED 
The goal of the OPERANDO project is to specify, implement, field-test, validate and exploit an innovative privacy enforcement platform that will enable the Privacy as a Service (PaS) business paradigm and the market for online privacy services.The OPERANDO project will integrate and extend the state of the art to create a platform that will used by independent Privacy Service Providers (PSPs) to p ...
Read Project

 9

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Start date: Oct 1, 2011, End date: Sep 30, 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Read Project

 45

 FINISHED 
Though survival of children with acute lymphoblastic leukaemia (ALL) has improved, relapse remains a leading cause of mortality in childhood cancer. Given the rarity of the disease, only a large international cooperative group can recruit sufficient patients for prospective studies with specific questions in biologic subgroups. Under the umbrella of the I-BFM SG all relevant mainly European study ...
Read Project

 29

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
We propose a technology that will sit at the front-end of sequencing pipelines, present and future, and will significantly enhance the quality and throughput of DNA sequencing.Although much attention has been given to throughput/cost of the sequencing process itself, the same cannot be said for the preparation of samples. Identified bottlenecks are (1) sequencing technologies require days of upfro ...
Read Project

 14

 FINISHED 

Understanding chronic pain and improving its treatment (EUROPAIN)

Start date: Oct 1, 2009, End date: Sep 30, 2015,

We will establish an international team of leading researchers and clinicians (EuroPain) to undertake multidisciplinary translational research which will: 1) increase the understanding of chronic pain mechanisms; 2)facilitate the development of novel analgesic drugs; and 3) improve the treatment of chronic pain patients.Nineteen researchers drawn from the London Pain Consortium, the Danish Pain Re ...
Read Project

 29

 FINISHED 

Human Resources for Primary Health Care in Africa (HURAPRIM)

Start date: Mar 1, 2011, End date: May 31, 2015,

"Multiple reports have documented the important deficit in human resources in health (HRH) in Africa. The causes are multiple and relate to a combination of underproduction, internal mal-distribution and inappropriate task allocation, working conditions and brain drain. The HURAPRIM-project will develop innovative interventions and policies and address the HRH crisis. The objectives of the project ...
Read Project

 10

 FINISHED 
New safety standards, such as ISO 26262, present a challenge for companies producing safety-relevant embedded systems. Safety verification today is often ad-hoc and manual; it is done differently for digital and analogue, hardware and software.The VeTeSS project will develop standardized tools and methods for verification of the robustness of safety-relevant systems, particularly against transient ...
Read Project

 26

 FINISHED 

European E&M 450mm Pilotline Readiness (EEM450PR)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

Aim of the EEM450PR project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative. It will also bring about the start of a vision to place an equipment development pilot line in the imec facility in Leuven. This will provide Europe with a complementary activity for 450mm equi ...
Read Project

 32

 FINISHED 
The network of PURESAFE – Preventing hUman intervention for incrREased SAfety in inFrastructures Emitting ionizing radiation, aims at enhancing career development and training of 15 Early-Stage Researchers in the field of systems engineering. The program trains young researchers from multidisciplinary fields, such as mechanical engineering, software engineering and robotics for the purpose of cost ...
Read Project

 8

 FINISHED 

Nanomaterials and nanotechnology for advanced photovoltaics (NanoPV)

Start date: Mar 1, 2011, End date: Feb 28, 2014,

The NanoPV project aims at making a breakthrough step-change in photovoltaics by the removal of a set of bottlenecks which have been identified to block the application of nanostructures for high-efficiency, low-cost solar cells. The bottlenecks arise from the present lack of up-scalable processes that can meet the needs for nanomaterials in PV applications, and the lack of relevant equipment and ...
Read Project

 12

 FINISHED 
The principal aim of FloodProBE is to provide cost-effective means for the flood protection and damage mitigation in urban areas. To this end, FloodProBE will develop, test and disseminate technologies, methods, concepts and tools for risk assessment and mitigation, focussing particularly on the adaptation of new and existing buildings (retrofitting) and on infrastructure networks. The three main ...
Read Project

 15

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 
Description Giving robots faster, more human-like vision through foveationTACO develops a 3D sensing system with 3D foveation properties endowing service robots with a higher level of motion and affordance perception and interaction capabilities with respect to everyday objects and environments in a more natural and human-like manner. The ...
Read Project

 7

 FINISHED 

European 450mm Equipment & Materials Initiative (EEMI 450)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

Large-scale semiconductor fabrication is now standardised on 300mm diameter wafers. However, as demand grows and node dimensions diminish, major chipmakers are considering offsetting the growing costs of miniaturisation by increasing wafer size to 450mm to cut cost per produced die. A prerequisite is the availability of the required quality wafers and equipment able to handle larger wafers. The EN ...
Read Project

 27

 FINISHED 

Thin Si film based hybrid solar cells on low-cost substrates (ThinSi)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

The ThinSi project will develop a solar cell processing chain for high throughput, cost-effective manufacturing of thin film silicon based solar cells on low-cost silicon substrates. The substrates will be made on the basis of an innovative powder-to-substrate concept. In line with the Workprogramme topic addressed, it will reduce the cost of solar cell modules compared to those made by the conven ...
Read Project

 11

 FINISHED 

REvolutionary Approaches and Devices for Nucleic Acid Analysis (READNA)

Start date: Jun 1, 2008, End date: Nov 30, 2012,

"The REvolutionary Approaches and Devices for Nucleic Acid analysis – READNA – consortium is composed of researchers from 10 academic institutions, 5 SMEs and 3 large companies. The goals of the READNA consortium are to revolutionize nucleic acid analysis methods, by 1) improving elements necessary to use the currently emerging generation of nucleic acid sequencers in a meaningful and accessible w ...
Read Project

 20

 FINISHED 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Read Project

 20

 FINISHED 
Solid state light sources based on compound semiconductors are opening a new era in general lighting and will contribute significantly to a sustainable energy saving. For a successful and broad penetration of LEDs into the general lighting market two key factors are required: high efficiency and low cost. Two new disruptive technologies based on nanostructured semiconductors are proposed to addres ...
Read Project

 14

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 
Inflammation is a complex biochemical and cellular response essential for the viability of higher organisms because of its requirement in anti-microbial defence and protection from the consequences of tissue injury. However, uncontrolled or sustained inflammation leads to several diseases with a huge social impact, ranging from autoimmune diseases to septic shock and cancer. While the requirement ...
Read Project

 11

 FINISHED 

European Privacy Open Space (PrivacyOS)

Start date: Jun 1, 2008, End date: May 31, 2010,

Protecting the privacy of citizens is increasingly becoming a core challenge of the on-going dynamic evolution of the information society. With more than 60% of the population surfing the Internet and nearly all of their data being processed online in governmental and enterprise processes, the risk of discriminatory profiling, surveillance, ID-theft, and fraud, amongst others, become omnipresent.T ...
Read Project

 16