Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
VOLATILE aims in the development of an innovative Volatile Fatty Acids Platform for the bioconversion of municipal solid bio-waste fraction and sludgy biowaste from other industries. The platform will be integrated in anaerobic digestion. The volatile fatty acids will be recovered continuously using sophisticated membrane technology and will be provided as feedstock / carbon source for value added ...
Read Project

 21

 FINISHED 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Read Project

 30

 FINISHED 
The growing attractiveness of cities leads to increasing population, thus rising energetic and food demands in urban areas. This makes urban waste management increasingly challenging, both in terms of logistics and environmental or health impacts. To decrease the cities’ environmental impacts and to contribute to a better resilience of urban areas towards energy or food supply crisis, waste manage ...
Read Project

 13

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

The overall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptl ...
Read Project

 12

 FINISHED 
...zation by policy makers, vi) numerical models for mapping land-cover changes to quantifiable impact on flood risks and vii) a harmonization platform, consolidating data and adding it to GEOSS and national repositories as OGC-based observations. SCENT will be evaluated in two large scale demonstrations in Kifisos Attica and Danube Delta. Our consortium covers the complete stakeholder chain: industr ...
Read Project

 10

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Next-generation biopharmaceutical downstream process (nextBioPharmDSP)

Start date: Mar 1, 2015, End date: Feb 28, 2019,

The scope of the project is the optimization of downstream process (DSP) for the production of Biopharmaceuticals. Biopharmaceuticals have been successfully used as efficient therapeutic drugs for many pathophysiological conditions since the first recombinant product, insulin, was approved in 1982. Despite its efficacy, accessibility is still limited due to extremely high costs. In the production ...
Read Project

 7

 FINISHED 

Road-, Air- and Water-based Future Internet Experimentation (RAWFIE)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The purpose of the RAWFIE initiative is to create a federation of different network testbeds that will work together to make their resources available under a common framework. Specifically, it aims at delivering a unique, mixed experimentation environment across the space and technology dimensions. RAWFIE will integrate numerous testbeds for experimenting in vehicular (road), aerial and maritime ...
Read Project

 13

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
... for planning & managing complex USaR operations7.System Integration of all the aforementioned software and hardware subcomponents (INACHUS platform)8.Contribution to standards: interaction with international organizations and public authorities in the fields of USaR, through an early defined and developed User Group, to ensure strong links with the user communities and standardisation bodies9.Con ...
Read Project

 21

 FINISHED 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Read Project

 31

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
...ers and five European destinations to provide a wider offer. The weaknesses and needs detected are: lack of resources at the centers to carry out projects for European mobility, low awareness of internationalization and European dimension thereof, difficulties in finding jobs for students Intermediate FP Madrid, need of the participants language skills and social skills reinforcement , stagnation ...
Read Project

 50

 FINISHED 

Small cEllS coordinAtion for Multi-tenancy and Edge services (SESAME)

Start date: Jul 1, 2015, End date: Dec 31, 2017,

SESAME targets innovations around three central elements in 5G: the placement of network intelligence and applications in the network edge through Network Functions Virtualisation (NFV) and Edge Cloud Computing; the substantial evolution of the Small Cell concept, already mainstream in 4G but expected to deliver its full potential in the challenging high dense 5G scenarios; and the consolidation o ...
Read Project

 21

 FINISHED 
"In addition to tight European VOC (Volatile Organic Content) legislation, the growing demand for high performance organic coatings but also improved processing and cost efficiency in formulation development, have and will continue to drive new and innovative developments in this vast industrial area. In this respect, the coatings industry is expected to gain significant technological and financia ...
Read Project

 5

 FINISHED 

DEEP Extended Reach (DEEP-ER)

Start date: Oct 1, 2013, End date: Mar 31, 2017,

The proposed project DEEP-ER (DEEP-Extended Reach) addresses two significant Exascale challenges: the growing gap between I/O bandwidth and compute speed, and the need to significantly improve system resiliency. DEEP-ER will extend the Cluster-Booster architecture of the Dynamical Exascale Entry Platform (DEEP) project by a highly scalable I/O system and will implement an efficient mechanism to re ...
Read Project

 17

 FINISHED 

Geologic Carbon Storage (CO2-REACT)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

The CO2-REACT ITN has been created to address twin objectives: (1) to provide urgently needed training in CO2 storage preparing candidates for critical roles in the coming years and (2) to significantly advance our understanding of the fate and consequences of CO2 injection into the subsurface during carbon storage efforts. The CO2-REACT ITN addresses these objectives through a balanced combinat ...
Read Project

 11

 FINISHED 
The consortium led by UKER and EuroHYP, the European Stroke Research Network for Hypothermia, proposes a large, multicentre clinical trial which will assess mild hypothermia as a novel treatment for ischemic stroke.Stroke is the second cause of death world-wide and the second cause of lost disability-adjusted life years in high-income countries. Stroke incidence rises exponentially with age, so it ...
Read Project

 38

 FINISHED 
As today’s energy policy decisions are not only very complex, but also fundamentally political decisions, the necessity to build them on sound, unbiased and up-to-date information/knowledge makes energy policy analysis and advice from a broad array of non-commercial actors key to effective policy formulation. Taking this into account, it is the aim of this project to establish a multidisciplinary ...
Read Project

 13

 FINISHED 
The goal of i-locate is twofold. First it will create a virtual hub for indoor open geographical data regarding public spaces (hospitals, public offices, shopping malls, museums etc). This will have significant economic business impact and it will be enable a number of indoor/outdoor (based on existing open data) businesses.The second goal is to create a easy-to-integrate open middleware for indoo ...
Read Project

 25

 FINISHED 
Hybrid-EVs and Full-EVs on the market are products where the Internal-Combustion-Engine (ICE) is supplemented by an electric-motor (HEV) or replaced by an all-electric power-train (FEV). Neither approach address lightweight or modularity inheriting the same disadvantages as conventional ICEV - Electrification of mobility must face a conceptual rEVOLUTION! This project breaks the paradigm of curren ...
Read Project

 25

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Read Project

 27

 FINISHED 
...states. The consortium includes 6 city authorities, major ITS actors (research institutes, information service providers, car industry) and the most important networks of European cities and international public transport operators.Led by public authorities the consortium supports 3 key approaches: effectiveness of solutions ensuring deployment perspectives of maximum 5 years; scalability of servi ...
Read Project

 26

 FINISHED 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

... to the five most motivated cities for a 6 to 8 months demonstration in each city.To change the legal framework CityMobil2 will establish a workgroup with scientists, system builders, cities, and the national certification authorities. The workgroup will to deliver a proposal for a European Directive to set a common legal framework to certify automated transport systems.Finally an industrial study ...
Read Project

 49

 FINISHED 

Mineral Scale formation: from the atomic to the field scale (MINSC)

Start date: Jun 1, 2012, End date: May 31, 2016,

The MINSC Initial Training Network (ITN) is comprised of partners from first-rate universities and high-level industrial partners located in the United Kingdom, France, Denmark, Iceland, Germany, Norway, and Italy. The prime aims of this network is to provide research and training opportunities to a new generation of young fellows in fundamental and collaborative research projects related to the n ...
Read Project

 9

 FINISHED 
The recent devastating earthquakes and associated tsunamis in Japan, Indonesia, and Haiti, which killed more than half a million people, highlighted how mankind is still far away from a satisfactory level of seismic risk mitigation. Among the regions around the Mediterranean Sea for which earthquakes represent a major threat to their social and economic development, the area around the Marmara Se ...
Read Project

 21

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

... and industrial partners and to create a highly effective technology transfer highway, allowing industry to rapidly absorb and exploit new discoveries.The Flagship will be aligned with European and national priorities to guarantee its successful long term operation and maximal impact on the national industrial and research communities.Together, the scientific and technological objectives and opera ...
Read Project

 154

 FINISHED 
...mistry, infrasound, eruption monitoring, physical volcanology, satellite studies of plumes, meteorology, ash dispersal forecasting, and civil defence. This European consortium leads the way for multi-national volcanological collaboration with the aim of mitigating the effects of major eruptions that pose cross-border hazards. Iceland is selected as a laboratory supersite area for demonstration bec ...
Read Project

 27

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 

Logistics for Energy Crops' Biomass (LOGISTEC)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

Cost-efficient, environmental-friendly and socially sustainable biomass supply chains are urgently needed to achieve the 2020 targets of the Strategic Energy Technologies-Plan of the European Union, which are likely to be impeded by the potential scarcity of lignocellulosic biomass from agriculture. Innovative techniques for crop management, biomass harvesting and pre-treatment, storage and transp ...
Read Project

 24

 FINISHED 
The aim of this pilot is to integrate a huge amount of environmental data put at disposal by the involved national/regional environmental agencies and other public and private environmental stakeholders through the integration and harmonisation of existing services in order to answer to the requests of environmental monitoring and reporting drafted by the European, national and local policies and ...
Read Project

 19

 FINISHED 
Offshore wind and tidal energy generation is becoming an increasingly important component of the world’s energy mix with Europe at the forefront of this technological revolution. Continued strong growth is predicted. However, a growing problem is manifesting itself within the industry.The submarine cables that are an essential infrastructural component of offshore energy now account for 80% of ins ...
Read Project

 9

 FINISHED 

Future Internet Technologies for MANufacturing (FITMAN)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

According to the 2010 EC Competitiveness Report, Manufacturing is still the driving force of Europe's economy, contributing over € 6553 billion in GDP and providing more than 30 million jobs. It covers more than 25 different industrial sectors, largely dominated by SMEs, and generates annually over € 1535 billion (42%) worth of value added services.The mission of the FITMAN (Future Internet Techno ...
Read Project

 41

 FINISHED 
In BIOCLEAN project, novel and robust microorganisms (aerobic and anaerobic bacteria, and fungi) able to extensively degrade polyethylene (PE), polypropylene (PP), polystyrol (PS) and polyvinyl chloride (PVC) polymers and plastics will be isolated from actual-site aged plastic wastes obtained from several European marine and terrestrial sites, composting facilities and landfills, and obtained via ...
Read Project

 20

 FINISHED 

SMArt systems Co-design (SMAC)

Start date: Oct 1, 2011, End date: Mar 31, 2015,

Smart systems consist of heterogeneous subsystems and components providing different functionalities; they are normally implemented as "Multi-Package on a Board". To fully exploit the potential of current nanoelectronics technologies, as well as to enable the integration of existing/new IPs and "More than Moore" devices, smart system miniaturization and "Multi-Chip in a Package" implementation are ...
Read Project

 18

 FINISHED 
The goal of 3D-LightTrans project is to provide groundbreaking, highly flexible and adaptable low-cost technologies for manufacturing of 3D textile reinforced plastic composites (in the following referred to as textile reinforced plastics or TRP), including innovative approaches for the individual processes and its integration in complete manufacturing chains, which will enable to shift them from ...
Read Project

 18

 FINISHED 
Mobility2.0 will develop and test an in-vehicle commuting assistant for FEV mobility, resulting in more reliable and energy-efficient electro-mobility. In order to achieve a maximum impact, Mobility2.0 takes an integrated approach of addressing the main bottlenecks of urban FEV mobility: 'range anxiety' related to the limited FEV range, scarcity of parking spaces with public recharging spots, and ...
Read Project

 11

 FINISHED 

Ultra Wide Context Aware Imaging (PANORAMA)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Read Project

 17

 FINISHED 
The diagnosis and discrimination of infectious diseases (such as leishmaniasis, dengue, malaria, HIV, chagas) in geographic regions with poor or low-density medical infrastructure is of high socioeconomic importance. While so-called "rapid in-vitro diagnostic (ivD) tests" for single diseases are already on the market, more complex analytical protocols are necessary to clearly identify a certain tr ...
Read Project

 8