Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

"Forensic investigation is a key component in the fight against crime and the protection of EU societies. At present it is hampered by a lack of protocols and training in carrying out forensic analysis on CBRN-contaminated materials. The aim of GIFT-CBRN is to develop a forensic toolbox for investigating CBRN incidents. This toolbox would provide (1) procedures, sampling methods and detection of C ...
Read Project

 20

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 
PELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, l ...
Read Project

 12

 FINISHED 

Graduate and Executive Nuclear Training and Lifelong Education (GENTLE)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

The GENTLE project is a pan-European effort in the field of education and training (E&T) on Nuclear Energy. It brings together leading European academic and research institutions with the goal to set up a life-long learning programme, strongly supported by stakeholders from industry. GENTLE focuses on two E&T domains: (a) the education of students by means of student research experiences in the nu ...
Read Project

 12

 FINISHED 

Safety of ACtinide Separation proceSSes (SACSESS)

Start date: Mar 1, 2013, End date: Jun 30, 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Read Project

 26

 FINISHED 
Safety issues are of fundamental importance for the acceptance and sustainable application of nuclear energy. Actinides play a central role in the nuclear fuel cycle from mining, fuel fabrication, energy production, up to treatment of used fuel by reprocessing, partitioning and transmutation and/or finally management and disposal of radioactive waste. A fundamental understanding of actinide proper ...
Read Project

 12

 FINISHED 

Safe ExploitAtion Related CHemistry for HLM reactors (SEARCH)

Start date: Nov 1, 2011, End date: Apr 30, 2015,

"In accordance with the ESNII roadmap MYRRHA will be the first HLM cooled nuclear system to be deployed in Europe. The SEARCH project aims to support the licensing process of MYRRHA by investigating the safe chemical behaviour of the fuel and coolant in the reactor. The control of the oxygen content and the management of impurities in the melt will be studied. A second critical issue in the safety ...
Read Project

 13

 FINISHED 
SCINTILLA aims at building an innovative comprehensive toolbox of devices and best-of-breed technologies for the enhanced detection and identification of difficult to detect radioactive sources and nuclear material:• Dealing with the challenge of masked and shielded material• Developing effective solutions, which are reliable, portable / mobile and cost effective• Finding a reliable replacement fo ...
Read Project

 10

 FINISHED 
The EURATOM FP7 Collaborative Project “Fast / Instant Release of Safety Relevant Radionuclides from Spent Nuclear Fuel (CP FIRST-Nuclides)” is established with the overall objective to provide for improved understanding of the fast / instantly released radionuclides from disposed high burn-up UO2 spent nuclear fuel. This issue is given a high priority in the SRA of the IGD-TP. The outcome of the p ...
Read Project

 11

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 
The objective of the proposal is based on the outcome of PATEROS CA to assess more in depth the regional approach to P&T implementation. It will respond to one of the key-topics put forward by the Strategic Research Agenda of SNETP. The project intends to look at the economical aspects of the most realistic scenario for P&T with the hypothesis: limit the MA bearing fuel transport and limit the MA ...
Read Project

 11

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35

 FINISHED 
Up to now fuel development and qualification has been a long and expensive process essentially based on an empirical approach. European experts currently have an adequate knowledge of conventional fuel manufacturing and its behaviour under operating conditions encountered during 50 years of industrial application and R&D activities. For innovative fuel systems, however, the empirical approach has ...
Read Project

 19

 FINISHED 
"This project aims at improving drug delivery to cancer cells by developing targeted radiotherapy with alpha-emitting radionuclides. Alpha particles emitted by radionuclides have short tracks (about 100 microns) in body tissues. As a result, they should be most appropriate to treat small-size tumours and isolated cancer cells. This project proposes the development of improved vectors and targeting ...
Read Project

 11