Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Vision Inspired Driver Assistance Systems (VI-DAS)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Read Project

 16

 FINISHED 
Current research efforts on 5G Radio Access Networks (RAN) strongly focus on mmWave access to realize enhanced mobile broadband (eMBB) services. However, there are many unsolved issues to deploy mmW ave 5G RAN. The most critical issue is backhauling since it is infeasible to provide 10 Gigabit Ethernet backhaul everywhere. Meanwhile, Mobile Edge Computing (MEC) have obtained much attention in 5G n ...
Read Project

 5

 FINISHED 
FUTEBOL composes a federation of research infrastructure in Europe and Brazil, develops a supporting control framework, and conducts experimentation-based research in order to advance the state of telecommunications through the investigation of converged optical/wireless networks. Current wireless trends (cell densification, coordinated communication, massive MIMO) pose a new set of challenges tha ...
Read Project

 5

 FINISHED 
Understanding properties of nanoparticles (and in general of nano-functionalized materials) and how they behave in living systems is a relatively new area of scientific study. The scientific community has not yet been able to derive harmful properties of nanomaterials from the properties of the bulk material. So a precautionary approach is required when handling and using these materials in circum ...
Read Project

 15

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 

Next Generation I/O for Exascale (NEXTGenIO)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

The overall objective of the Next Generation I/O Project (NEXTGenIO) is to design and prototype a new, scalable, high-performance, energy efficient computing platform designed to address the challenge of delivering scalable I/O performance to applications at the Exascale. It will achieve this using highly innovative, non-volatile, dual in-line memory modules (NV-DIMMs). These hardware and systemwa ...
Read Project

 9

 FINISHED 
... reliable positioning subsystem. A good example of these new requirements can be witnessed in the increasing interest in navigation at lane-level, with applications such as enhanced driver awareness, intelligent speed alert and simple lane allocation. As well as the accuracy of positioning data being a big driver, there is also a question around the adaptability of navigation systems to these appl ...
Read Project

 10

 FINISHED 
The 5G CHAMPION project ambitions to deliver the first 5G system proof-of-concept in conjunction with the 2018 South Korean Winter Olympics. Key novel 5G building blocks will be developed and implemented into a new architectural approach providing an efficient end-to-end system performance encompassing cutting edge 5G radio-access, core-network and satellite technologies.It will be the first time ...
Read Project

 10

 FINISHED 
... The RealValue consortium is a truly cohesive partnership which has full participation and commitment from the whole energy supply chain. The consortium includes: technology developers (Glen Dimplex, Intel); energy system modelling specialists (UCD, DIW, RTU); energy market specialists (VTT); socio-economic experts (Oxford University); electricity network operators (ESBN, EirGrid) and energy utili ...
Read Project

 12

 FINISHED 
The objective of SPEED-5G is to research and develop technologies that address the well-known challenges of predicted growth in mobile connections and traffic volume. A major challenge is the cost of meeting the objective, in terms of both infrastructure and deployment. Today, lack of dynamic control across wireless network resources is leading to unbalanced spectrum loads and a perceived capacit ...
Read Project

 10

 FINISHED 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Read Project

 24

 FINISHED 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Read Project

 19

 FINISHED 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Read Project

 18

 FINISHED 
... users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Chalmers an ...
Read Project

 19

 FINISHED 

DEEP Extended Reach (DEEP-ER)

Start date: Oct 1, 2013, End date: Mar 31, 2017,

... more applications increasing scientific throughput, and the loss of computational work through system failures will be substantially reduced.DEEP-ER will build a prototype with the second generation Intel® Xeon Phi processor, a uniform high-speed interconnect across Cluster and Booster, non-volatile memory on the compute nodes, and network attached memory providing high-speed shared memory access ...
Read Project

 17

 FINISHED 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Read Project

 8

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Read Project

 27

 FINISHED 

Millimetre-wave Evolution for Backhaul and Access (MiWEBA)

Start date: Jun 1, 2013, End date: May 31, 2016,

Due to the popularization of smart phones and tablets in recent years, the traffic of data on conventional networks are predicted to be increased by 1000 times in the next 10 years. To face the severe issue of system capacity shortage due to the increasing data traffic in cellular networks, standardization on heterogeneous networks with overlay deployment of low-power base stations in the service ...
Read Project

 5

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
The MADNESS project aims at the definition of innovative system-level design methodologies for embedded systems, able to drive the optimal composition of an heterogeneous MPSoC architecture, according to the requirements and the features of a given target application field.The proposed methodologies will extend the classic concept of design space exploration, to cope with high heterogeneity, techn ...
Read Project

 9

 FINISHED 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Start date: Apr 1, 2010, End date: Mar 31, 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Read Project

 40

 FINISHED 

Nanoscale Silicon-Aware Network-on-Chip Design Platform (NaNoC)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Description The objective of this project is to develop an innovative network-on-chip oriented design platform constituting a toolkit for the construction of NoC-based multi-core systems in nanoscale technologies The NaNoC project aims at developing an innovative design platform for future Network ...
Read Project

 8

 FINISHED 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Read Project

 12

 FINISHED 

COmpact MOdelling Network (COMON) (COMON)

Start date: Dec 1, 2008, End date: Nov 30, 2012,

"The goal of our Network is to address the full development chain of Compact Modeling (CM) of advanced CMOS and III-V technologies, from the technology level to the system level. Our mission is driven by the need to enhance scientific knowledge, transfer scientific and technological knowledge from academia to industry, to strengthen the European integrated circuit (IC) industry with powerful desi ...
Read Project

 16