Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 
...tricity interconnection target of 10%[1].The LowUP Project has a two-fold strategy: 1) on one hand, to target goals (i) and (ii) of these climate challenge with a 42 months duration project where innovation will be the core activity, and 2), on other hand, to successfully present different technological solutions which will enable the participation of low grade thermal energy sources in the energ ...
Read Project

 13

 FINISHED 
Manufacturing represents approximately 21 % of the EU’s GDP and 20 % of its employment, providing more than 30 million jobs in 230 000 enterprises, mostly SMEs. Moreover, each job in industry is considered to be linked to two more in related services. European manufacturing is also a dominant element in international trade, leading the world in areas such as automotive, machinery and agricultural ...
Read Project

 13

 FINISHED 
The Green INSTRUCT project will develop a prefabricated modular structural building block that is superior to conventional precast reinforced concrete panels by virtue of its reduced weight, improved acoustic and thermal performance and multiple functionalities. The Green INSTRUCT block consists of over 70% of CDW in weight. The Green INSTRUCT project will: (i) achieve sustainability and cost sav ...
Read Project

 15

 FINISHED 
A recent evaluation of FP7 projects executed by the EC, showed that an estimated 80% of funded Health projects lacks valorisation. The “UTILE” proposal presents the EU-Health Innovation Marketplace, an online tool to better valorise the FP7 Health and Horizon2020 SC1 project results. This marketplace will actively bring together Innovation Providers (i.e. technology push) and the Innovation Develo ...
Read Project

 11

 FINISHED 

Data-Driven Bioeconomy (DataBio)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

The data intensive target sector selected for the DataBio project is the Data-Driven Bioeconomy, focusing in production of best possible raw materials from agriculture, forestry and fishery/aquaculture for the bioeconomy industry to produce food, energy and biomaterials taking into account also various responsibility and sustainability issues. DataBio proposes to deploy a state of the art, big dat ...
Read Project

 49

 FINISHED 
Despite the proclaimed benefits (i.e. scalability, reliability, cost-effectiveness) of Future Internet (FI) technologies (i.e. edge & cloud computing, IoT/CPS) for factory automation, their adoption from manufacturers remains low for various reasons, including technology issues (e.g., poor situation awareness, limited deployments, no standards-based reference implementations) and the lack of a smo ...
Read Project

 12

 FINISHED 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Start date: Jun 1, 2016, End date: May 31, 2019,

...rgery, brain function monitoring and rehabilitation. The ASTONISH partners cover the full value chain, from semiconductor manufacturing to clinical centres testing the final application. The proposed innovations improve the global competitiveness of the European industry in the healthcare domain.
Read Project

 25

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
5TOI_4EWAS project will focus on Targeted Open Innovation in energy, water and agriculture societal challenges through a balanced innovation-friendly ecosystem in the Southern Mediterranean Neighborhood (SMN) based on quintuple helix and NEXUS approach. The project will enhance and support regional smart specialization and development by increasing research capacity, effective mobility of young in ...
Read Project

 25

 FINISHED 
...ical, Electronics Equipment (WEEE) generated and the threat of competition from Asia. To sustain its growth, to manage the impact of WEEE and to face the competition from Asia, the industry needs innovations in key areas. One such area is the drive for ultra-miniaturisation/ultlra-functionality of equipment. The key current road block/limitation to achieving the goal of ultra-miniaturisation/funct ...
Read Project

 14

 FINISHED 
The RESLAG project proposal is aligned with the challenges outlined in the call WASTE-1-2014: Moving towards a circular economy through industrial symbiosis. In 2010, the European steel industry generated, as waste, about 21.8 Mt of steel slag. The 76 % of the slag was recycled in applications such as aggregates for construction or road materials, but these sectors were unable to absorb the total ...
Read Project

 22

 FINISHED 

MinWaterCSP - Minimized water consumption in CSP plants (MinWaterCSP)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

MinWaterCSP addresses the challenge of significantly reducing the water consumption of CSP plants while maintaining their overall efficiency. Its objective is to reduce evaporation losses and mirror cleaning water usage for small- and large-scale CSP plants through a holistic combination of next generation technologies in the fields of i) hybrid dry/wet cooling systems ii) wire structure heat tran ...
Read Project

 12

 FINISHED 
To meet the greenhouse gas reduction targets set by the European Commission and to reduce the reliance on imported energy sources from not-EU countries, the energy efficiency sector vitally needs basic analytical and decision support tools. This is especially true for large scale energy-consumer plants (for ex. foundries) but also for medical centres which typically (1) use large amounts of energy ...
Read Project

 10

 FINISHED 

frontierCities2 - Another Level of Impact (frontierCities2)

Start date: Dec 1, 2016, End date: Nov 30, 2018,

frontierCities2 – Another Level of Impact represents a quantum leap in the scope, ambition and service. This acceleration programme focused on FIWARE-supported solutions in the Smart Cities area, answering to new opportunities to achieve significant success and impact in promoting FIWARE-supported solutions across European cities and city environments. frontierCities2 – Another level of impact res ...
Read Project

 7

 FINISHED 

SURveillance Video Archives iNvestigation assisTant (SURVANT)

Start date: Nov 1, 2016, End date: Oct 31, 2018,

All around the world, organizations and agencies deploy video surveillance to monitor and protect property and public infrastructure, driven by various factors like increasing crime rate, security threats, terrorism acts and even monitoring of law enforcement. The influx of surveillance footage from a growing number of cameras operating at higher resolutions, such as HD, coupled with the desire to ...
Read Project

 5

 FINISHED 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Start date: Nov 1, 2015, End date: Oct 31, 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c ...
Read Project

 23

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 
...tegration for residential and communities’ microgrids that represent a large market in Europe, that is estimated to grow with a CAGR of 35% from $ 0.7 billion in 2014 to $ 4.2 billion in 2020.The innovation of this action is twofold:• Develop and commercialize a storage system module of 10 kW, 40 kWh based on a breakthrough technology, originally developed by Harvard University and implemented in ...
Read Project

 5

 FINISHED 

Creating links to speed-up innovation in the bio economy (BioLinX)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

BioLinX will bridge research and innovation efforts in the bioeconomy by building three large clusters in Europe and initiating within them a range of powerful linking and innovation acceleration processes. The BioLinX partners have leading roles in the bioeconomies of South West Netherlands and Flanders, the Nordic Countries and Northern Italy and in the lignocellulose, agro- and agro-waste feed ...
Read Project

 9

 FINISHED 
...ropean industrial leadership in STE; e) Expand joint activities among research centres by offering researchers and industry a comprehensive portfolio of research capabilities, bringing added value to innovation and industry-driven technology; f) Establish the European reference association for promoting and coordinating international cooperation in concentrating solar energy research. To that end, ...
Read Project

 42

 FINISHED 
BIO-GO-For-Production is a Large Scale Collaborative Research Project that aims to achieve a step change in the application of nanocatalysis to sustainable energy production through an integrated, coherent and holistic approach utilizing novel heterogeneous nanoparticulate catalysts in fuel syntheses. BIO-GO researches and develops advanced nanocatalysts, which are allied with advanced reactor con ...
Read Project

 16

 FINISHED 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Start date: May 1, 2014, End date: Oct 31, 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Read Project

 18

 FINISHED 
Despite recent evolutions of tools/practices in the Architecture Engineering, Construction and Facility Management have already resulted in considerable advances, some limitations remain, related to the complexity and variability of building life cycles, addressing building end user awareness and participation, lack of new business models, life cycle fragmentation, limited interoperability of the ...
Read Project

 21

 FINISHED 
The scientific targets of the EUROSUNMED project are the development of new technologies in three energy field areas, namely photovoltaics (PV), concentrated solar power (CSP) and grid integration (GI), in strong collaboration with research institutes, universities and SMEs from Europe in the north side of the Mediterranean sea and from Morocco and Egypt from the south of the sea. The focus in PV ...
Read Project

 18

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

...xperimentations in applicativedomains: electro-mobility, smart buildings, infrastructures and smart cities, industrial production,energy production and energy virtual market,-Point out the accessible innovations thanks to new services,-Lead the way to further standardization work.The strategy adopted in the project has four major dimensions:-An innovation strategy based on business and technology ...
Read Project

 87

 FINISHED 
CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Read Project

 13

 FINISHED 
CITI-SENSE will develop “citizens’ observatories” to empower citizens to contribute to and participate in environmental governance, to enable them to support and influence community and societal priorities and associated decision making. CITI-SENSE will develop, test, demonstrate and validate a community-based environmental monitoring and information system using innovative and novel Earth Observa ...
Read Project

 32

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

... engineering in a certification and safety context which is expected to have global impact.By bringing together large enterprises and various industrial domains CRYSTAL will setup a sustainable innovation eco-system. By harmonizing the demands in the development of safety-relevant embedded systems including multi-viewpoint engineering and variability management across different industrial domains, ...
Read Project

 70

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 
... cities w.r.t smart mobility uptake, it brings together an innovative dual approach of a pan-European focus in parallel with four local geographical focal points in B, I, SI, and UK. The consortium's innovation support has the capacity to deliver pan-European reach through the involvement of Europe's largest innovation and commercialisation support network (EBN Network), combined with a range of ...
Read Project

 7

 FINISHED 

FOrecast and Roadmapping for MAnufacturing Technologies (FORMAT)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

"The analysis of emerging technologies and their potential impact on markets, economies and societies requires reliable and repeatable methods and tools since the related information plays a critical role for strategic decisions of private and public organizations. All existing techniques reveal several weaknesses such as limited accuracy on middle and long-term forecast; poor repeatability; poor ...
Read Project

 6

 FINISHED 
Infection prevention measures aim to ensure the protection of people who might be vulnerable to acquiring an infection both in the general community and while receiving care due to health problems. The basic principle of infection prevention and control is hygiene. Hygiene could be divided in personal hygiene (e.g. hand washing) and inanimate object disinfection (e.g. use of chemicals for cleaning ...
Read Project

 8

 FINISHED 
INERTIA will introduce the Internet of Things/Services principles to the Distribution Grid Control and DSM Operations. It will provide an overlay network for coordination and active grid control, running on top of the existing grid and consisting of distributed and autonomous intelligent Commercial Prosumer Hubs. This way, it will address the present "structural inertia" of DG by introducing more ...
Read Project

 11

 FINISHED 

Future Internet Social and Technological Alignment Research (FI-STAR)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Read Project

 44

 FINISHED 

Future Internet Technologies for MANufacturing (FITMAN)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

...sed Production.iii. Virtual Factories Trials: APR (SME) plastic industry – Collaboration valorisation, TANet (SME) manufacturing resource management – Networked Business Innovation, COMPLUS (SME) LED smart lighting – Collaborative Production,GEOLOC (SME) Machinery for wood industry – Project-based Collaboration.
Read Project

 41

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 
"The DISCOVER-IT objective is to support SMEs innovation processes through an advanced information system based on semantic technologies. The project starts from the results reached in the European project ""INSEARCH"", consisting in a prototype information system able to support SMEs in the search and extraction of knowledge related to innovation process present in structured and unstructured inf ...
Read Project

 9

 FINISHED 
ADVISE aims to design and develop a unification framework for surveillance-footage archive systems, in an effort to deal with the increasingly critical need to provide automated and smart surveillance solutions.This need arises due to the continuous growth of surveillance systems in scale, heterogeneity and utility. There are two major obstacles: the variety on the technical components of the surv ...
Read Project

 11

 FINISHED 

Human-enhanced time-aware multimedia search (CUBRIK)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

Description The multimedia search engine with a human touch.No search is the same and no knowledge domain requirements are identical, so how can the full potential of search intelligence be exploited?How can search computation be boosted with intuition, lateral thinking, conceptual associations, trusted opinions and domain knowledge?How c ...
Read Project

 17