Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Read Project

 15

 FINISHED 
... will be investigated to establish an across-the-board comparative study. The data collected through this comprehensive comparative study will be extremely valuable for the OEMs of this project (i.e. GKN, PWC, and HDI) to understand the pros and cons of these DED systems and will help them to select suitable repair and re-manufacturing strategies. The tests conducted in this research are also extr ...
Read Project

 4

 FINISHED 
PERFoRM - Production harmonizEd Reconfiguration of Flexible Robots and Machinery aims to the conceptual transformation of existing Production Systems towards plug&produce production systems in order to achieve a flexible manufacturing environments based on rapid and seamless reconfiguration of machinery and robots as response to operational or business events.These objectives require research acti ...
Read Project

 18

 FINISHED 
With the ULTIMATE project five experienced research groups and four major European engine manufacturers will develop innovative propulsion systems to fulfill the SRIA 2050 key challenges. One of the most challenging targets is the 75% reduction in energy consumption and CO2-emissions. Technologies currently at TRL 3-5, cannot achieve this aim. It is estimated that around a 30% reduction must come ...
Read Project

 11

 FINISHED 

Real-time dynamic control system for laser welding (RADICLE)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

...ontrol system will include pre- and post-welding measurement as well as in-process monitoring, control and fault prevention / fixing. The project has 4 large, end-user partners - Rolls-Royce, Alstom, GKN and CRF (FIAT) therefore the impact of RADICLE is expected to be very large.The overall impacts of successful implementation of the RADICLE technology through our consortium and the wider welding ...
Read Project

 12

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
Icing conditions are one of the most severe for aircraft and engines as experienced in the certification process and in-service events. Certification tests are never simple because icing phenomena is a very complex domain and designers have access to a very low level of prediction capability compare to other fields, mainly relying on a very fragmented knowledge based on empirical past experience. ...
Read Project

 15

 FINISHED 

Self-Healing Thermal Barrier Coatings (SAMBA)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"This project deals with the creation of a new, unique self-healing thermal barrier coating (TBC) for turbines and other thermally loaded structures in order to realize a significant extension of the lifetime of critical high-temperature components. The concept is based on novel Al2O3 coated Mo-Si particles embedded in the TBC layer, typically consisting of yttria-stabilised zirconia. As the curre ...
Read Project

 9

 FINISHED 

Full Aero-thermal Combustor-Turbine interactiOn Research (FACTOR)

Start date: Dec 1, 2010, End date: Nov 30, 2016,

To achieve lower Specific Fuel Consumption (SFC) and CO2/NOx emissions, modern turbomachineries operate at high velocities and high temperature conditions. The lack of confidence in the prediction of combustor-turbine interactions leads to apply extra safety margins on components design. Therefore, the understanding of combustor-turbine flow field interactions is mandatory to preserve High Pressur ...
Read Project

 24

 FINISHED 

Thermal Overall Integrated Conception of Aircraft (TOICA)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Thermal behaviour of aircraft has recently become a crucial subject due to many factors: increasing number of complex systems required by modern, more electric, commercial aircraft, the introduction of hotter engines with higher by-pass ratios, the increased use of composite material in aircraft structures, or the confinement of highly dissipative equipment and systems in smaller areas to earn spa ...
Read Project

 34

 FINISHED 
The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Read Project

 33

 FINISHED 
The headline objective of this project is to develop a suite of advanced sensors, instrumentation and related systems in order to contribute to the development of the next generation of green and efficient gas turbine engines (AAT.2012.1.1-3&4).Sensors are a vital enabling technology for gas turbines and are critical to validation of design tools, new products, engine control, and health monitorin ...
Read Project

 16

 FINISHED 

Surface Heat Exchangers for Aero-Engines (SHEFAE)

Start date: Feb 1, 2013, End date: Jan 31, 2016,

"The Project aim is to develop and demonstrate an advanced structural surface cooler mounted in an appropriate core fairing composite structure. Currently surface coolers are an integral feature of advanced turbofan engine designs. They contribute to achieving the best engine performance by maintaining oil and fuel temperatures within defined limits and by virtue of their mounting on the inside of ...
Read Project

 6

 FINISHED 
The concept of the MERLIN project is to reduce the environmental impact of air transport using Additive Manufacturing (AM) techniques in the manufacture of civil aero engines. MERLIN will develop AM techniques, at the level 1 stage, to allow environmental benefits including near 100% material utilisation, current buy to fly ratios result in massive amounts of waste, no toxic chemical usage and no ...
Read Project

 16

 FINISHED 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Start date: Apr 1, 2009, End date: Sep 30, 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Read Project

 51

 FINISHED 

Flutter-Free Turbomachinery Blades (FUTURE)

Start date: Jul 1, 2008, End date: Jun 30, 2013,

"FUTURE brings together European and international well reputed centres-of-excellence in order to reach major scientific & technical objectives in striving towards flutter-free turbomachine blades. By advancing the state-of-the-art in flutter prediction capabilities and design rules, the FUTURE project will lead to benefits in terms of decreased development cost, reduced weight and fuel consumptio ...
Read Project

 26

 FINISHED 
"With aging engines and the increase of air traffic in the next 20 years, a central challenge in the aeronautical industry will concern the increase of the efficiency of maintenance which still represents around 20% of an operator’s indirect operating costs. This challenge is particularly important for metallic parts within the engine aircraft industry, because of the criticity of rotative compone ...
Read Project

 14

 FINISHED 

Advanced flexible automation cell (FLEXA)

Start date: Jun 1, 2008, End date: Nov 30, 2012,

"Truly flexible automation of -low volume, -high value per part components, -managing quality assurance aspect throughout the value chain is a key research area for the manufacturing and production community in Europe. The FLEXA project has identified key elements for delivering advancement in this area. The key areas of research will be; cell design solutions in line with product design decisions ...
Read Project

 17

 FINISHED 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Read Project

 59

 FINISHED 
"Air traffic is predicted to grow by 5% per year in the short and medium term. Technology ad-vances are required to achieve this growth without unacceptable levels of noise. FLOCON addresses this issue by reducing fan noise at source through the development of innovative concepts based on flow control technologies. FLOCON is aimed primarily at reducing fan broadband noise. This is one of the most ...
Read Project

 17

 FINISHED 
"ACCENT addresses the relevance to the call 7.1: “Aeronautics and Air Transport” by “Improving Cost efficiency” and quality of safety critical aircraft engine components. The manufacture of safety critical rotating components in modern aero engines is by nature very conservative. In order to achieve the required engine performance, thermal and mechanical stresses are pushed to the maximum, which i ...
Read Project

 14

 FINISHED 

valiDation of Radical Engine Architecture systeMs (DREAM)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Read Project

 46