Search for European Projects

33 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Start date: Jan 1, 2014, End date: Dec 31, 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Read Project

 64

 FINISHED 

Online Network TraffIc Characterization (ONTIC)

Start date: Feb 1, 2014, End date: Jan 31, 2017,

Accurate identification and categorization of network traffic is a crucial task in many network management and engineering activities, such as QoS evaluation, capacity planning and attack detection. Terabytes of data may be transferred through the core network of a typical ISP every day, and an exponential growth in traffic is expected in the short-term, with more than 50 billions of Internet-conn ...
Read Project

 7

 FINISHED 
Today, an average family spends annually over 50 Euros on No-Failure-Found (NFF) investigations - a known problem of an unknown origin. Tomorrow, the electronic engine control system in a car will be dying after two-three years of operation due to CMOS ageing. Actions are urgently needed!A group of European experts will unite their forces in BASTION to fight against ageing and NFF issues. The proj ...
Read Project

 8

 FINISHED 
Traditional security solutions based on custom hardware like smart cards, set-top boxes, and dongles, are not convenient on mobile devices like smartphones and tablets. Software protection is therefore utterly important; it can be a maker and breaker in domains like multi-screen mobile TV, software licensing, and credentials and sensitive data stored on mobile devices. However, current software pr ...
Read Project

 8

 FINISHED 
Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Read Project

 11

 FINISHED 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Read Project

 15

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Read Project

 116

 FINISHED 

SECURity at the network EDge (SECURED)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Protection of mobile devices from Internet threats is usually achieved by installing appropriate tools (e.g. anti-virus, personal firewall, parental control) on each device. However, this poses several issues: it requires privileged access on the device, appropriate protection tools may not exist on all the platforms or their capabilities may vary greatly across the different devices, and tools ma ...
Read Project

 8

 FINISHED 
ICT is recognized as being a key player against climate change: pervasive sensors and actuators can efficiently control the whole energy chain (Smart Thermal/Electricity Grid). On the other side, advances on 3D modeling, visualization and interaction technologies enable user profiling and real-time feedback to promote energy efficient behaviors. To unlock the potentiality of these technologies, th ...
Read Project

 15

 FINISHED 
Share-PSI 2.0 brings together a critical mass of government agencies and organisations responsible for implementing the new PSI Directive. Lead by the W3C, the consortium includes the Open Group and Open Geospatial Consortium as fellow standards bodies plus the PSI Alliance, Open Knowledge Foundation, Open Data Institute and PwC as the primary contractor in the ISA Programme's work on interoperabi ...
Read Project

 42

 FINISHED 

CLoud approach for Innovation in Public Services (CLIPS)

Start date: Feb 1, 2014, End date: Jul 31, 2016,

The CLIPS project aims at introducing a new approach to deliver innovative public services, through the cloud-computing approach involving the community in the process (PPPP public-private-people-partnership). The main idea of CLIPS is to provide to the community a methodology and a toolkit which allow civil servants and other external stakeholders (both citizens and businesses) to co-operate in ...
Read Project

 13

 FINISHED 
PASTEUR4OA will support the aim of encouraging the development of matching policies on open access and open data in the European Union according to the European Commission’s recent Recommendation on“Access to and preservation of scientific information” (July 2012) and in view of maximizing alignment with the Horizon 2020 policy on access to the research funded by the Commission. The project will h ...
Read Project

 15

 FINISHED 
The current maintenance policies, including e.g. RCM (Reliability Centred Maintenance) and TPM (Total Productive Maintenance), can be generally useful in answering questions such as “how much maintenance should be done on this machine?” “How frequently should this part be replaced?” “How many spare parts should be kept in stock?” “How should the shutdown be scheduled?” It is generally accepted tha ...
Read Project

 14

 FINISHED 

Unifying Cloud and Carrier Networks (UNIFY)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Read Project

 16

 FINISHED 

Low-energy and Reliable reconfigurable processing systems (LORELEI)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

This proposal deals with electronic embedded systems, i.e., with electronic systems which have been designed to perform a dedicated task.These systems must match specific constraints demanded by the targeted application, and may include cost, performance, real-time capabilities, volume, weight, and power. The last parameter emerged as a crucial one in the last decade, not only because of the incre ...
Read Project

 2

 FINISHED 

Openly Accessible Services and Interacting Society (OASIS)

Start date: Feb 1, 2012, End date: Oct 31, 2015,

In many regions of Europe, citizens and businesses are faced with the difficulty or impossibility of finding information and services provided by local public authorities on the internet. Any such information currently available is often segmented and isolated in a non-user friendly manner. The current project will facilitate access to information, public services and economic promotion by groupin ...
Read Project

 15

 FINISHED 

Secure idenTity acrOss boRders linKed 2.0 (STORK 2.0)

Start date: Apr 1, 2012, End date: Sep 30, 2015,

"Secure idenTity acrOss boRders linKed 2.0" builds on the success and results of STORK by taking further steps to decisively push the lines for wider uptake of eID in Europe, aiming at realising a single European electronic identification & authentication area. Its highly innovative focus lies on the convergence of private and public sectors in an operational framework and infrastructure encompass ...
Read Project

 65

 FINISHED 
READY4SmartCities operates in a European context where other initiatives are currently running in order to create a common approach on Smart Cities, Such initiatives, even if of fundamental importance for the EU, have some relevant gaps not allowing them to fully cover fundamental aspects for Smart Cities, i.e. to define a common data framework allowing full interoperability among different city s ...
Read Project

 11

 FINISHED 
New safety standards, such as ISO 26262, present a challenge for companies producing safety-relevant embedded systems. Safety verification today is often ad-hoc and manual; it is done differently for digital and analogue, hardware and software.The VeTeSS project will develop standardized tools and methods for verification of the robustness of safety-relevant systems, particularly against transient ...
Read Project

 26

 FINISHED 

SMArt systems Co-design (SMAC)

Start date: Oct 1, 2011, End date: Mar 31, 2015,

Smart systems consist of heterogeneous subsystems and components providing different functionalities; they are normally implemented as "Multi-Package on a Board". To fully exploit the potential of current nanoelectronics technologies, as well as to enable the integration of existing/new IPs and "More than Moore" devices, smart system miniaturization and "Multi-Chip in a Package" implementation are ...
Read Project

 18

 FINISHED 
The existing building stock in European countries accounts for over 40% of final energy consumption in the European Union (EU) member states, of which residential use represents 63% of total energy consumption in the buildings sector. In this scenario, the EcoThermo proposal will address specific needs and will pursue challenges in order to introduce breakthrough technologies into the market.The E ...
Read Project

 10

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Legal Aspects of Public Sector Information 2.0 (LAPSI 2.0)

Start date: Jan 1, 2013, End date: Dec 31, 2014,

The objective of the LAPSI 2.0 thematic network is to identify the remaining legal barriers and obstacles to access and re-use of public sector information (PSI) on the European content market, and to provide measures and tools to overcome or reduce these barriers and to stimulate the progress of the European market towards open data. LAPSI 2.0 brings together academic experts with stakeholders f ...
Read Project

 22

 FINISHED 

Led-based intelligent street lighting for energy saving (LITES)

Start date: Dec 1, 2009, End date: Nov 30, 2014,

The main objective of the LITES project is to demonstrate in real life experimentation that intelligent street lighting using solid-state lights LED drastically reduces energy consumption. The lighting service delivered is compliant with road classes CE2-CE5, S- and A- according to the standard of EN13201. That means that our device can be installed in secondary street, commercial access, allotmen ...
Read Project

 6

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
Recent trends in embedded system architectures brought a rapid shift towards multicore, heterogeneous and reconfigurable platforms. This makes chip design enormously complex and imposes a large effort for the programmers to develop their applications. For this reason, new and more efficient tools for software development are needed to ensure software productivity and time to market of new applica ...
Read Project

 8

 FINISHED 

Secure Web OS Application Delivery Environment (webinos)

Start date: Sep 1, 2010, End date: Dec 31, 2013,

The webinos project will define and deliver an Open Source Platform and specific components for the Future Internet, which will enable web applications and services to be used and shared consistently and securely over a broad spectrum of converged and connected devices, including mobile, PC, home media (TV) and in-car units. Promoting a "single service for every device" vision, webinos will move t ...
Read Project

 23

 FINISHED 

Bayesian Biometrics For Forensics (BBfor2)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

With various forms of biometric technologies becoming available, there is a growing need for scientists who are able to assess the merits of these technologies when applied to forensics. The Marie Curie ITN `Bayesian Biometrics for Forensics,' or BBfor2, will provide a training infrastructure that will educate Early Stage Researchers in the core biometric technologies of speaker, face and fingerpr ...
Read Project

 9

 FINISHED 
Protecting critical infrastructures providing communications, energy, or healthcare presents increasing ICT challenges as ICT itself has become vital to them. Internet-scale ICT infrastructures ("infrastructure clouds") promise scalable virtualised computing, network, and storage resources over the Internet. They provide scalability and cost-efficiency but pose significant new privacy and resilien ...
Read Project

 16

 FINISHED 

Virtual Campus Hub

Start date: Oct 1, 2011, End date: Sep 30, 2013,

Description Virtual Campus Hub (VCH)Higher education and industrial innovation are challenged by today's fast development in the natural sciences, engineering, technology, and economy, underpinned by the dramatic advances in information technology. Education in universities and their effort in innovation haven’t really adjusted to this trend ...
Read Project

 4

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15

 FINISHED 

Thematic Network on Legal Aspects of Public Sector Information (LAPSI)

Start date: Mar 22, 2010, End date: Aug 31, 2012,

Information generated and collected by public sector entities represents a veritable minefield; it might make a much greater contribution to EU economies and societies, if current legal barriers to access and re-user were removed. The LAPSI project will deal both with established PSI areas (geographic, land register data, etc.) as well as novel areas (cultural data from archives, libraries, scien ...
Read Project

 20

 FINISHED 
Le projet se propose de systématiser et de promouvoir l'utilisation des archives cadastrales pour la gestion des écosystemes et le développement durable des territoires transfrontaliers. Achievements: Etudes d'applicationRecherche scientifiqueGuide pratique d'interpréta ...
Read Project

 6