Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Aerodynamic rigs for VHBR IP turbine (ORBIT)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The ORBIT project targets the environmental and competitiveness challenge of the European aeronautics sector, by addressing the topic of experimental validation rig testing to develop aerodynamic technologies for the multi-stage IP turbine of the Very High Bypass Ratio engine (VHBR).The advancement of multi-stage IP Turbine technologies, as an important contributor to the VHBR engine concept, will ...
Read Project

 1

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 

WING STRUCTURAL TEST DEVELOPMENT METHOD (WISDOM)

Start date: Jan 14, 2013, End date: Dec 13, 2016,

The proposal approach innovative solutions for the design and manufacturing of the test rig and the definition of the method and prformance for the structural testing of two different kinds of configuration for the outer wings within a Smart Fixed Wing Aircraft.The WISDOM proposal, understand that the test philosophy is to demonstrate that major components tests can be performed on flight test air ...
Read Project

 3

 FINISHED 
"In order to reduce the sensor number, one has to be based on signals carrying information about the “global” structure state. The structure’s vibrational behavior is definitely a global characteristic. The idea is thus the development of a vibration based, in flight, SHM platform, which can be applied in aircraft structures in practice.The main practical problem for the application of vibration b ...
Read Project

 7

 FINISHED 

Development of Electric Smart Actuator for gas turbine engines (E-SEMA)

Start date: Apr 1, 2012, End date: Oct 31, 2014,

"The E-SEMA project will design, manufacture and test an innovative concept of light, reliable and smart electrical actuator for an inlet guide vane or stator vane application of gas turbine engines that will be capable of interfacing and connecting to the engine control unit in a plug-and-play manner. This innovative concept of smart electrical actuator will be based on a multi-disciplinary appro ...
Read Project

 6

 FINISHED 
"Modern aircraft structures have to comply with severe requirements: they have to be light as well as safe. These requirements lead to an increased use of composite materials in the aircraft industry. However, new materials also require new techniques in order to inspect aircraft components during production in a non-destructive way.The primary goal of the DOTNAC project is to develop a safe, con ...
Read Project

 10

 FINISHED 

Development of high power density electrical actuators (HP-SMART EMA)

Start date: Jan 1, 2010, End date: Jun 30, 2013,

"The HP-SMART-EMA project will develop and test an innovative concept of extremely light, reliable and smart electrical actuator for control systems of turbine engines that will be capable of interfacing and connecting to the engine / turbine control unit in a plug-and-play manner. This innovative concept of smart electrical actuators will be based on a multi-disciplinary approach that will consid ...
Read Project

 6

 FINISHED 

Flutter-Free Turbomachinery Blades (FUTURE)

Start date: Jul 1, 2008, End date: Jun 30, 2013,

"FUTURE brings together European and international well reputed centres-of-excellence in order to reach major scientific & technical objectives in striving towards flutter-free turbomachine blades. By advancing the state-of-the-art in flutter prediction capabilities and design rules, the FUTURE project will lead to benefits in terms of decreased development cost, reduced weight and fuel consumptio ...
Read Project

 26

 FINISHED 
"The increasing use of composites, sandwich and lightweight structures and parts in new airplanes leads to a need of adapted Non Destructive Testing techniques for such new materials. Various NDT techniques are currently used for flaw detection or mechanical characterization during the development of aerostructures. There is a constant need for improved inspection methods; with increased reliabili ...
Read Project

 6

 FINISHED 

valiDation of Radical Engine Architecture systeMs (DREAM)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Read Project

 46

 FINISHED 

AIRCRAFT INTEGRATED STRUCTURAL HEALTH ASSESSMENT II (AISHA II)

Start date: May 1, 2008, End date: Oct 31, 2011,

"The safe use of complex engineering structures such as aircrafts can only be guaranteed when efficient means of damage assessment are in place. Whereas the design of civil structures is nowadays based on a damage tolerance approach and time based inspection cycles, it is envisaged that the large cost associated with this approach can be drastically reduced by switching to a condition based mainte ...
Read Project

 14