Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Photonic Integrated Circuits Assembly and Packaging Pilot Line (PIXAPP)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

PIXAPP will establish the world’s first open access Photonic Integrated Circuit (PIC) assembly & packaging Pilot Line. It combines a highly-interdisciplinary team of Europe’s leading industrial & research organisations. PIXAPP provides Europe’s SMEs with a unique one-stop-shop, enabling them to exploit the breakthrough advantages of PIC technologies. PIXAPP bridges the ‘valley of death’, providing ...
Read Project

 20

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

... and IoT have the capacity for disruptive impacts on highly and fully automated driving along all value chains towards a global vision of Smart Anything Everywhere.In order to stay competitive, the European automotive industry is investing in connected and automated driving with cars becoming moving “objects” in an IoT ecosystem eventually participating in BigData for Mobility. AUTOPILOT brings Io ...
Read Project

 43

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 

Green Electronics with Diamond Power Devices (GreenDiamond)

Start date: May 1, 2015, End date: Apr 30, 2019,

The key to the efficient transmission and conversion of low-carbon electrical energy is the improvement of power electronic devices. Diamond is considered to be the ultimate wide bandgap semiconductor material for applications in high power electronics due to its exceptional thermal and electronic properties. Two recent developments - the emergence of commercially available electronic grade single ...
Read Project

 15

 FINISHED 

effective Container inspection at BORDer control points (C-BORD)

Start date: Jun 1, 2015, End date: Nov 30, 2018,

Efficient NII (non-intrusive inspection) of containerised freight is critical to trade and society. Freight containers are potential means for smuggling (e.g. tobacco), illegal immigration, trafficking of drugs, mis-declared goods and dangerous illicit substances, including explosives, nuclear material, chemical and biological warfare agents and radioactively contaminated goods. One inspection NII ...
Read Project

 19

 FINISHED 
The integration of innovative lightweight materials like CFRP into multi-material design (MMD) environments in aeronautic applications brings along a paradigm shift in initial design, manufacturing and in maintenance, repair and overhaul (MRO). Essential cost reductions over the whole aircraft lifecycle demand innovative processes meeting the specific requirements of MMD in general and specificall ...
Read Project

 14

 FINISHED 
...s new technology. One challenge consists in the development of methods that reliably identify, characterize and quantify nanomaterials (NM) both as substance and in various products and matrices. The European Commission has recently recommended a definition of NM as reference to determine whether an unknown material can be considered as 'nanomaterial' (2011/696/EU). The proposed NanoDefine project ...
Read Project

 30

 FINISHED 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

"Forensic investigation is a key component in the fight against crime and the protection of EU societies. At present it is hampered by a lack of protocols and training in carrying out forensic analysis on CBRN-contaminated materials. The aim of GIFT-CBRN is to develop a forensic toolbox for investigating CBRN incidents. This toolbox would provide (1) procedures, sampling methods and detection of C ...
Read Project

 20

 FINISHED 

Single European Secure Air-cargo Space (EUROSKY)

Start date: May 1, 2013, End date: Apr 30, 2017,

EUROSKY will deliver a high impact programme for advanced air-cargo security and facilitation measures to safeguard international supply chains and the security of citizens while fostering international co-operation and a broad stakeholder engagement from all segments of the air-cargo industry.The main outputs will be:1. The EUROSKY Blueprints to provide a Europe wide cooperative model for air car ...
Read Project

 24

 FINISHED 
...inding biologically-homogenous groups of patients, and developing a clinical research network will overcome the limitations in target identification, early triage and clinical trials. Hence, leading European institutions and three SMEs will partner with the EFPIA to: a) develop in vitro models, and animal models that carry confirmed genetic risks, and in these animals to focus on cross-species e ...
Read Project

 29

 FINISHED 
The NanoMILE project is conceived and led by an international elite of scientists from the EU and US with the aim to establish a fundamental understanding of the mechanisms of nanomaterial interactions with living systems and the environment, and uniquely to do so across the entire life cycle of nanomaterials and in a wide range of target species. Identification of critical properties (physico-che ...
Read Project

 30

 FINISHED 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Read Project

 18

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

..., Brain Simulation, High Performance Computing, Medical Informatics, Neuromorphic Computing and Neurorobotics, and create a user community of research groups from within and outside the HBP, set up a European Institute for Theoretical Neuroscience, complete a set of pilot projects providing a first demonstration of the scientific value of the platforms and the Institute, develop the scientific and ...
Read Project

 116

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Read Project

 33

 FINISHED 

Monitoring Atmospheric Composition and Climate -III (MACC-III)

Start date: Aug 1, 2014, End date: Aug 31, 2015,

...y of the atmospheric services provided by MACC-II. Its continued provision of coherent atmospheric data and information, either directly or via value-adding downstream services, is for the benefit of European citizens and helps meet global needs as a key European contribution to the Global Climate Observing System (GCOS) and the encompassing Global Earth Observation System of Systems (GEOSS). Its ...
Read Project

 39

 FINISHED 

Combined Highly Active Anti-retroviral Microbicides (CHAARM)

Start date: Jan 1, 2010, End date: Jun 30, 2015,

This proposal is for a large scale collaborative project in which we propose both to develop novel microbicides directed against new intracellular targets and to investigate novel combinations of highly active anti-retroviral drugs which may be particularly effective as microbicides. Combinations may enhance efficacy but equally importantly will increase the genetic barrier to the development of r ...
Read Project

 34

 FINISHED 
"The objective of the CARENA project is to accelerate the introduction of membrane reactors into the European chemical industry by the development of novel material and processes for the conversions of alkanes and CO2 into valuable chemicals. In a future environment with higher cost of crude oil and of CO2, the European chemical industry can only remain competitive by radical innovation. Process i ...
Read Project

 18

 FINISHED 

Structural performance of multi-metal component (MULTIMETAL)

Start date: Feb 1, 2012, End date: Jan 31, 2015,

...erve to promote common understanding of structural integrity assessment of DMWs in existing and future NPPs of EU member states. This will be the technical basis towards the development of harmonised European codes and standards for multi-metal components, which is currently not available.
Read Project

 13

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 
"CATO proposes to develop a comprehensive Open Toolbox for dealing with CBRN crises due to terrorist attacks using non-conventional weapons or on facilities with CBRN material. CATO will:• combine CBRN knowledge, planning & response know-how, DSS building blocks and dedicated models and algorithms• enable the development of specific holistic CBRN-DSS• cover the entire CBRN disaster life cycle from ...
Read Project

 28

 FINISHED 
...• Finding a reliable replacement for Helium-3, which is the major consumable for today's RPM (Radiation Portal Monitors) devices for neutron detection and has become close to unavailable in the European Union.----------SCINTILLA will innovate in two technology areas that offer complementary capabilities for detecting and identifying neutron and gamma addressing different usage contexts:• Scintilla ...
Read Project

 10

 FINISHED 

Electricity Demand and Supply Harmonizing for EVs (e-DASH)

Start date: Sep 1, 2011, End date: Nov 30, 2014,

...l in order to prevent damages of FEV batteries.\nIt is the objective of e-DASH to develop those IC Technologies and processes that are needed to achieve the real-time integration of "FEVs" in the European Electricity Grid to enable an optimum electricity price to the customer and at the same time allows an effective load balancing in the grid.\nGreat emphasis is placed on the "openness of the V2OE ...
Read Project

 15

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

...R-ED will aggregate a consistent and interoperable mix of technologies and processes, covering all aspects, from risk assessment to complete training packages.SECUR-ED rationale is to create a global European improvement in mass transportation security through the development of packaged modular solutions validated through the demonstrations, and made available to the full community of operators.T ...
Read Project

 44

 FINISHED 
...derground observatory to search for rare events and study terrestrial and astrophysical neutrinos. The Astroparticle Roadmap of ApPEC/ASPERA strongly supports this, recommending that: “a new large European infrastructure of 100'000-500'000 ton for proton decay and low-energy neutrinos be evaluated as a common design study together with the underground infrastructure and eventual detection of acce ...
Read Project

 39

 FINISHED 
...he service lines will cover air quality, climate forcing, stratospheric ozone and solar radiation. MACC II will deliver products and information that support the establishment and implementation of European policy and wider international programmes. It will acquire and assimilate observational data to provide sustained real-time and retrospective global monitoring of greenhouse gases, aerosols and ...
Read Project

 39

 FINISHED 
... major challenges. Tackling these challenges requires extensive exchange of data, information and knowledge between medical scientists, sequencing centres, bioinformatics networks and industry at the European level. The GEUVADIS (genetic European variation in disease) Consortium aims at developing standards in quality control and assessment of sequence data, models for data storage, exchange and a ...
Read Project

 17

 FINISHED 
... scale Mock-up analyses. The end product of the project (“STYLE TOOLS”) will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project will interact with the European Network of Excellenc ...
Read Project

 21

 FINISHED 

Embryonic Stem cell-based Novel Alternative Testing Strategies (ESNATS)

Start date: Apr 1, 2008, End date: Sep 30, 2013,

...uce, refine and replace animal tests, to lower testing cost, and to support medium/high throughput testing. ESNATS objectives will be achieved in a 5 year multi-disciplinary collaboration of leading European researchers in alternative testing, toxicology, ESC research, genomics, modelling, and automation. The consortium will also include representatives from regulatory bodies, the pharmaceutical ...
Read Project

 34

 FINISHED 
"Terrorist attacks by bombing or CBR-agents are threats with a low probability but with disastrous consequences. There is strong need to protect people, the societal community and critical infrastructures and utilities against being damaged, destroyed or disrupted by deliberate acts of terrorism. Solutions have to be derived to realize sufficient resilience of the urban infrastructure for rare occ ...
Read Project

 11

 FINISHED 

Genotype-To-Phenotype Databases: A Holistic Solution (GEN2PHEN)

Start date: Jan 1, 2008, End date: Jun 30, 2013,

...P biomedical knowledge environment. The project will then utilise these elements to construct an operational first-version of that knowledge environment, by the projects end. This will consist of a European-centred but globally-networked hierarchy of bioinformatics GRID-linked databases, tools and standards, all tied into the Ensembl genome browser. The project has the following specific objective ...
Read Project

 23

 FINISHED 
...s new tools such as Safetypedia, Atlas of Emerging Risks, Reference Library... The project has a solid industry leadership and involves the leading EU R&D institutions. It is coordinated by the European Virtual Institute for Integrated Risk Management, the EEIG guaranteeing the sustainability of the results after the project.
Read Project

 67

 FINISHED 
For E.V.s, the development of an interactive electric energy ICT & Service interface between the vehicle and its electricity infrastructure is of utmost importance, next to creating effective business models.The rationale of this project is to contribute significantly to neutralize the driver's "range anxiety" and encourage the customers to embark the fully electric road transport.Therefore the ob ...
Read Project

 12

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

...ed during SARNET Phase 1; - Analyzing experimental results in order to elaborate a common understanding of relevant phenomena; - Developing the ASTEC code (including its applicability to all types of European NPPs), which capitalizes in terms of physical models the knowledge produced within SARNET2; - Developing Scientific Databases, in which all the results of research programmes are stored in a ...
Read Project

 45

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 
"The carbon Environmental Service (CARBONES) will provide the first multi-decadal reanalysis of the global carbon cycle and a service to provide a rolling update of this analysis. This will include the "essential climate variables" (defined by the Global Climate Observing System) of atmospheric carbon dioxide, leaf area and biomass in various categories. No integrated reanalysis includes these cli ...
Read Project

 15

 FINISHED 

Integrated Mobile Security Kit (IMSK)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Read Project

 29

 FINISHED 

IT Future of Medicine (ITFoM)

Start date: May 1, 2011, End date: Apr 30, 2012,

Data-rich, individualised medicine poses unprecedented challenges for IT, in hardware, storage and communication. We propose a data-driven, individualised medicine of the future, based on molecular/physiological/anatomical data from individual patients. We shall make general models of human pathways, tissues, diseases and ultimately of the human as a whole. Individualised versions of the models, ...
Read Project

 25

 FINISHED 

Integrated European Industrial Risk Reduction System (IRIS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

...spect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligation to reconsider their risk and safety policies, having a more competitive industry and more risk informed and innovation accepting society in vision. Theref ...
Read Project

 37