Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"Background: A significant proportion of pre-diabetics, show macro and micro vascular complications associated with hyperglycaemia. Although many trials have demonstrated the efficacy of lifestyle and pharmaceutical interventions in diabetes prevention, no trial has evaluated the extent to which mid- and long-term complications can be prevented by early interventions on hyperglycaemia.Aims: To ass ...
Read Project

 37

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
NIWE project will demonstrate a new production process able to decrease the embodied energy of the foundry products by over 25%, reducing drastically its carbon footprint. The demonstration will be performed in the aluminium, iron and steel sectors.The expected energy efficiency gains are due to a new furnace that, by means of a power transmission system based on induction, will allow a highly fle ...
Read Project

 10

 FINISHED 
The TRADEIT project is a multidisciplinary, multi-sectorial collaborative project supporting a Network of Traditional Food SMEs and Food Researchers in the areas of Collaboration, Innovation, Entrepreneurship, Knowledge and Technology Transfer to increase the competitiveness and inter-regional advantage of Traditional Food Producing SMEs. This will be achieved through focused regional coordination ...
Read Project

 20

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 

Sustainable Organic and Low-input Dairying (SOLID) (SOLID)

Start date: Apr 1, 2011, End date: Mar 31, 2016,

"Organic and low-input dairy farming systems are increasingly noted as delivering multifunctional benefits to the agricultural industry and society but technical and economic constraints prevent widespread adoption. SOLID will deliver an innovative toolbox of novel methodologies that will contribute to the competitiveness of the dairy industry and increase the effectiveness with which these benefi ...
Read Project

 26

 FINISHED 

Operationalising Psychosocial Support in Crisis (OPSIC)

Start date: Feb 1, 2013, End date: Jan 31, 2016,

Complex emergencies such as earthquakes, flooding, bombings, and the recent massacre in Utøya (Norway) can seriously affect entire populations and rip nations apart, with long-term psychosocial consequences impacting the most vulnerable as well as the helpers for years following the disaster.A large number of high quality European guidelines and tools for psychosocial support interventions in cris ...
Read Project

 11

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 

Trans-national cooperation among ICT NCPs (Idealist2014)

Start date: Oct 1, 2011, End date: Dec 31, 2014,

The main objective of Idealist2014 is reinforcing the network of National Contact Points (NCP) for ICT under FP7, by promoting further trans-national cooperation within this network. This cooperation will not be reduced to only ICT NCPs but also a degree of collaboration and networking with similar networks in parallel themes (Security, SSH, ENV, Transport, Energy, Health,...etc) especially in the ...
Read Project

 25

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
T-TRANS project aims at providing information on innovation mechanisms for the Intelligent Transportation Systems domain, encouraging and facilitating an accelerated market deployment of related innovative products and services. A deep analysis of the current activity in Intelligent Transportation Systems shows an increasing importance of this transport research and application domain to support m ...
Read Project

 9

 FINISHED 
Description The main goal of the universAAL project is to make it easier for the ICT industry in Europe to develop and successfully deploy AAL solutions. To achieve this, the project is developing an open standardized platform/specification on which the AAL service providers can quickly and cheaply build AAL services. The project also assist ...
Read Project

 21

 FINISHED 

OPEN INNOVATION Mechanisms in Smart Cities (Open Cities)

Start date: Nov 1, 2010, End date: Dec 31, 2013,

The success of cities is linked to their efficiency, in reducing transaction costs and providing services. However, in order to maintain this success, cities have reinvented themselves many times through history.Today, Information Technologies are doomed to be the key driver of a new wave of innovation in cities that will lead, one more time, to their reinvention.However, public procurement and ma ...
Read Project

 15

 FINISHED 

Cost-Effective Solar AiR conditioning (CESAR)

Start date: Dec 1, 2011, End date: Nov 30, 2013,

"Summer electricity use is growing year upon year, mainly due to air conditioning (AC) demand. Electricity grids are increasingly experiencing problems during the hottest summer days, to deal with the increasing demand of electricity from air conditioning systems.Absorption cooling can be a solution to this growing problem, as it can supply cooling from a heating source, with only a very small ele ...
Read Project

 7

 FINISHED 
Assembly of transient and stable signaling platforms in the plasma membrane of cells has been implicated in functions as varied as death and survival, polarity, differentiation, migration, cell-cell communication, virus entry, exocytosis, endocytosis. Naturally, the assembly of signaling microdomains requires the use of most complex molecular mechanisms capable of transducing intrinsic or extrinsi ...
Read Project

 1

 FINISHED 
"EULARINET (Co-ordinating Latin America Research and Innovation NETworks) goal is to strengthen bi-regional dialogue on S&T between EU Member States (MS) and Latin American Partner Countries (LAPC) at policy, programme and institutional (research entities) level, thus contributing to a three fold objective: a) promote the joint identification, setting up, implementation and monitoring of mutual in ...
Read Project

 20

 FINISHED 

Magnetic Scaffolds for in vivo Tissue Engineering (MAGISTER)

Start date: Dec 1, 2008, End date: Nov 30, 2012,

The main driving idea of the project is the creation of conceptually new type of scaffolds able to be manipulated in situ by means of magnetic forces. This approach is expected to generate scaffolds with such characteristics as multiple use and possibly multipurpose delivery in order to repair large bone defects and ostheocondral lesions in the articular surface of the skeletal system. The major ...
Read Project

 21

 FINISHED 

ANDALUSIAN RESEARCHERS´NIGHT 2012 (ANDARES)

Start date: May 1, 2012, End date: Nov 30, 2012,

"As part of the Innovation policy of Andalusian Region, Fundación Descubre (www.fundaciondescubre.es) with the University of Almeria, University of Cordoba, University of Granada, University of Huelva, University of Malaga, Pablo de Olavide University, University of Seville, Jaen University and National Research Council (CSIC), the Association of Promoters and Producers of Renewable Energy and th ...
Read Project

 11

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35

 FINISHED 
Dendrimers are new materials obtained with a highly controlled molecular structure in several space orientations. Liquid Crystals (LC) Dendrimers are a part of them that incorporate directional properties to these materials. If we append active molecules into these engineered molecules, we can obtain multifunctional anisotropic molecules that open the possibility of achieving a wide variety of phy ...
Read Project

 10

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 
MyOcean is THE PROJECT to set up infrastructures, services and resources to prepare the operational deployment of first Marine Core Services. My Ocean answers to the topic SPA.2007.1.1.01 - development of upgraded capabilities for existing GMES fast-track services and related (pre)operational services. MyOcean is proposed by a consortium of 67 partners spread in maritime countries: - federated aro ...
Read Project

 60

 FINISHED 
The co-operative Metafight project will perform functional studies to understand the dissemination and outgrowth of metastasis through systematic analysis of the Core Invasive Machinery contained within integrin-mediated ECM attachment structure. It includes a large and discretely localised intracellular signalling network which drives migration and invasion. Our strategy is based on the hypothesi ...
Read Project

 10

 FINISHED 

Deployment of Remote Instrumentation Infrastructure (DORII)

Start date: Feb 1, 2008, End date: Jul 31, 2010,

The DORII project aims to deploy e-Infrastructure for new scientific communities, where on the one hand the ICT technology is still not present at the appropriate level, but on the other hand it is demanded to empower its daily work. We deal with a group of scientific users, and this is a reference for DORII, with experimental equipment and instrumentation that are not integrated or integrated onl ...
Read Project

 13

 FINISHED 
"To develop adequate and well accepted security for mass transportation in Europe and the citizens affected by it, is a formidable task. The malicious threats, particularly those posed by terrorists, require a comprehensive approach: if security improvements are patchy, perpetrators are likely to find the loopholes left. With their open access points and interconnections, surface mass transportati ...
Read Project

 13