Search for European Projects

31 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
Despite improved understanding of the links between ecosystem health, provision of ecosystem services and human well-being, further conceptual and empirical work is needed to make the ideas of ecosystem services (ESS) and natural capital (NC) operational. OpenNESS will therefore develop innovative and practical ways of applying them in land, water and urban management: it will identify how, where ...
Read Project

 39

 FINISHED 
Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Read Project

 46

 FINISHED 
The main goal of the ENHANCE project is to develop and analyse new ways to enhance society’s resilience to catastrophic natural hazard impacts, by providing new scenarios and information in selected hazard cases in close collaboration with stakeholders, and by contributing to the development of new multi-sector partnerships (MSPs) to reduce or redistribute risk. Innovation in MSPs is essential, a ...
Read Project

 24

 FINISHED 

Initiative Towards sustAinable Kerosene for Aviation (ITAKA)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

ITAKA project is expected to support the development of aviation biofuels in an economically, socially, and environmentally sustainable manner, improving the readiness of existing technology and infrastructures. This will be achieved through the first of its kind collaborative project in the EU, that will develop a full value-chain in Europe to produce sustainable drop-in Hydroprocessed Esters and ...
Read Project

 16

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
Hydrogen is foreseen to be the energy vector of the future. However, there are still significant barriers to store and transport hydrogen, especially in small portable applications. The success of a portable Fuel Cell system depends to a large extent on the fuel supply that should be accomplished in a cost-effective and comfortable manner.The present project proposes a power supply comprising a me ...
Read Project

 10

 FINISHED 
The NanoPhoSolar project aims to overcome the limitations relating to the efficiency and performance of a range of photovoltaic (PV) systems by developing a transparent NanoPhosphor down converting material capable of absorbing Ultra Violet (UV) and short wavelength visible light and re-emitting in the more useful longer wavelength visible spectrum(range 525-850nm).This will enable the efficiency ...
Read Project

 14

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

Performance and validation of HIGH-rate constructed WETlands (HIGHWET)

Start date: Oct 1, 2013, End date: Sep 30, 2015,

This project is addressed to improve the capacity and effectiveness of constructed wetland (CW) systems as sustainable wastewater (WW) treatment technology. HIGHWET project aims to develop and validate new configurations of CWs to obtain high rate CWs for treating different types of WW.HIGHWET system approach will enhance the implementation of these treatment technologies not only due to their low ...
Read Project

 6

 FINISHED 
"The aim of the project is to design, produce and validate a demonstrator of a Steerable Aircraft Parachute System for rescue of small and medium size airplanes, such as Light Sport Aircrafts (LSA), weighting up to 500 kg, as well as for space capsules, and navigated within the frame of the Global Navigation Satellite System GNSS (e.g. GPS/EGNOS/Galileo).Once the emergency system is activated by t ...
Read Project

 9

 FINISHED 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Start date: May 1, 2011, End date: Apr 30, 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Read Project

 33

 FINISHED 
Background In 2009, the EU produced 3 264 422 tonnes of plastic sacks and bags – including cones – made from polymers, as much as 85% using ethylene. In Spain, where this project is based, some 13.5 billion commercial plastic bags are made every year. Production of these bags has a high environmental impact – the main issues being use of non-renewab ...
Read Project

 1

 FINISHED 

EUropean DATa (EUDAT)

Start date: Oct 1, 2011, End date: Mar 31, 2015,

EUDAT is our proposal for the next stage in the realisation of the vision of "data as infrastructure". The EUDAT consortium includes representatives from each stage of the value chain that has evolved to deliver scientific knowledge to researchers, citizens, industry and society as a whole. It includes funding agencies that invest in research infrastructures and programmes of research, infrastruct ...
Read Project

 28

 FINISHED 
More than 60% of all reported diseases in modern industrial countries are said to have their origin from malnutrition (low vitamin intake, high caloric food (fat and sugar)). As an important cause of this the high consumption of fat (saturated and trans-fatty acids, salt (sodium) and sugar (mono- and disaccharides) has been identified. With the change of society, the consumer’s pattern towards fo ...
Read Project

 17

 FINISHED 

Cross-lingual Knowledge Extraction (X-Like)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

The goal of the X-LIKE project is to develop technology to monitor and aggregate knowledge that is currently spread across global mainstream and social media, and to enable cross-lingual services for publishers, media monitoring and business intelligence.In terms of research contributions, the aim is to combine scientific insights from several scientific areas to contribute in the area of cross-li ...
Read Project

 8

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
The challenges facing international intermodal container logistics is efficiency and security. These seemingly conflicting issues have a common solution: supply chain visibility, where data for visibility can be shared between business and government.Since technical solutions already exist, the challenge lies in integrating solutions across the supply chain. CASSANDRA will:•Facilitate the adoption ...
Read Project

 26

 FINISHED 

Implant Direct

Start date: Sep 1, 2012, End date: Aug 31, 2014,

ImplantDirect will create a cost-effective, faster manufacturing route for orthopaedic, maxillofacial or trauma implants, tailored to the individual needs of patients. The overall project aims are to improve the quality of the implants, reduce the recovery time, improve the quality of life for the patients and reduce the healthcare costs. This will be achieved by allowing surgeons to personalise ...
Read Project

 9

 FINISHED 
Each year Cardiovascular Disease (CVD) causes over 1.9 million deaths in the EU, causing direct health costs of €105 billion. Coronary Heart Disease (CHD), half of all CVD deaths, is the single most cause of death in Europe. Heart Failure (HF) – a CHD being the most frequent cause of hospitalization for people over 65 – has 10 million patients in the EU. Current treatment of HF entails recommendat ...
Read Project

 22

 FINISHED 
One of the key aspects towards the success of the Bologna Process and the creation of unified European Higher Education Area is the close cooperation and interaction between governments, higher education institutions, students, staff, employers and quality assurance agencies. However in practice this is hard to achieve and the process lacks the active participation of a large number of students an ...
Read Project

 13

 FINISHED 

pHotonics ELectronics functional Integration on CMOS (HELIOS)

Start date: May 1, 2008, End date: Nov 30, 2012,

Photonics on CMOS is a candidate technology for applications where functional integration is needed for improving system performance while reducing size and cost.Functional demonstration of basic building blocks such as a µlaser, a detector, coupling, and link has been realized in previous research projects. As a next step the HELIOS project proposes to integrate photonics components with integrat ...
Read Project

 22

 FINISHED 

Fast Ramp-up and Adaptive Manufacturing Environment (FRAME)

Start date: Oct 1, 2009, End date: Sep 30, 2012,

The aim of the FRAME project is a paradigm shift from the conventional human-driven ramp-up and system integration process to fully automated, self-learning and self-aware production systems. In particular, the project will deliver new methods to represent structure, capability and behaviour not only on machine level, but from a holistic point-of-view. This overall view allows the production syste ...
Read Project

 10

 FINISHED 
"Biodiesel is produced by transesterification of vegetable oils with methanol. Glycerine is a major by-product of the transesterification process. Due to the rapid increase in biodiesel production capacity in Europe also the amount of glycerine has increased rapidly. The overall project objective is to produce methanol from crude glycerine, and re-use the methanol in the biodiesel plant. This proj ...
Read Project

 7

 FINISHED 

Complex Systems for an ICT-enabled Energy System (ComplexEnergy)

Start date: Nov 1, 2009, End date: Feb 28, 2011,

The European Energy Policy aims at achieving three core objectives: sustainability, competitiveness and security of supply. The achievement of these objectives requires a profound transformation of the energy system that will imply a huge and coordinated effort across several areas. This effort must rely on a sound analysis of different policy approaches, regulatory measures and technological choi ...
Read Project

 2

 FINISHED 

Researchers in the Kitchen (RESKITCHLAB)

Start date: Jun 1, 2010, End date: Dec 31, 2010,

"The ResKitchLab: Researchers in the Kitchen proposal consists in two different activities which are very relate to each other. First, six main Events on the 24th September 2010, which will gather around 15000 people, organised by seven public entities: UdG, UMU, CNIEH, CSIC in Galicia, FULP and UniOvi. Second, a whole project period event starting at the very beginning of the project. The differe ...
Read Project

 9

 FINISHED 
Ultra-Wide Band (UWB) is a wireless technology which exhibits unique features such as spectrum coexistence with other wireless services, RF front-end simplicity (enabling potential low cost terminals), good radio wave propagation (robustness against multi-path fading, material penetration) and high bitrate. Current UWB implementations target short-range ultra-high bitrate point-to-point wireless c ...
Read Project

 13

 FINISHED 
"The plastic processing industry faces many challenges, although the use of plastics grows with new opportunities and applications To take advantage, SMEs have to innovate and diversify their business offer. Clusters assist this process by joining technical centres to monitor technological development, and suppliers of equipment and materials to improve competitiveness. The plastic processing indu ...
Read Project

 11

 FINISHED 
The TransAtlantic Double degree in International Business (TADIB) partners propose a bachelor double degreeprogram that will involve three universities and 48 students who wiil all obtain a double degree. The threeuniversities are Aarhus School of Business at Aarhus University, Universidad Carlos HE de Madrid and ClemsonUniversity.The partners are also proposing an innovative enhanced cohort exper ...
Read Project

 3