Search for European Projects

15 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Epithelial cell derived Thymic Stromal Lymphopoietin (TSLP) instructs dendritic cells (DCs) via the expression of OX40L to induce Th2 polarization and is both necessary and sufficient for the development of airway inflammation. TSLP and OX40L are therefore promising targets for the development of new therapies for allergic asthma. The aim of this project is to study the potential of targeting huma ...
Read Project

 1

 FINISHED 
...nergy efficiency and carbon reduction footprint against a broader system-level smart city energy efficiency, while maximizing the use of renewable energy. GEYSER will originally combine innovative AC/DC data center optimized design practices with real time smart synergistic IT infrastructure (computing, storage), cooling and power subsystems for energy monitoring and control, with flexible supply ...
Read Project

 11

 FINISHED 

Modular Power BUS for space vehicles (MPBUS)

Start date: Apr 25, 2014, End date: Aug 1, 2016,

...ower bus architecture combining ejectable batteries with the main bus through intelligent nodes. These nodes are able to communicate between them and a battery controller using an improved, data over DC line technology, expected to reduce the total weight in 2 main areas: improving the use of the batteries and reducing the total weight due to harness.The consortium is formed by two Spain SMEs, one ...
Read Project

 4

 FINISHED 

Advanced Avionic Applications Simulation Platform (AAASP)

Start date: Aug 28, 2013, End date: Aug 27, 2015,

...creating a high quality basis for specific model development.- Accurate and robust SaberRD models according to equipment designs covering the typical architecture of electric networks like AC and DC generators, a power center, AC/DC DC/DC, AC/AC converters and machine loads- Two types of models will be provided to allow analysis on different levels:- Functional models for large time frame analysis ...
Read Project

 2

 FINISHED 

Scalable and Secure Infrastructures for Cloud Operations (SSICLOPS)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

...on of cloud resources the SSICLOPS projects will investigate high-performance, vertically integrated network stacks for intra/inter-cloud communication and efficient, scalable, and secure intra/inter-DC and client-facing transport mechanisms. The project will design, implement, demonstrate, and evaluate three specific use cases, namely a cloud-based in-memory database, the analysis of physics expe ...
Read Project

 14

 FINISHED 
...implementation• Application of the 3L-T-Type inverter which can be derived from a 2L-inverter with three additional, bidirectional switches which connect the AC terminals with the center-tapped DC link• And applying of appropriate modulation techniques which make use of switching states with reduced CMV levelsThe resulting solutions will be compared with a state-of-the-art 2L-VSI power core based ...
Read Project

 2

 FINISHED 

HYPHEN: Hybrid Photonic Engines for Massive Cloud Connectivity (HYPHEN)

Start date: Aug 1, 2015, End date: Jan 31, 2017,

... essential services to “the cloud” are combining to push current data-center infrastructures to their limits. This applies in particular to communication networks within and between data centers (DC), which limit scalability of computing and storage already today. Wavelength-division multiplexing (WDM) transmission schemes are key to overcome these bottlenecks, increasing the throughput of inter-D ...
Read Project

 1

 FINISHED 

Zavod O - Kids In Action 3

Start date: Aug 1, 2016, End date: Nov 30, 2017,

Longterm EVS project "Zavod O – Kids in Action 3"will connect five daily centers in the wider area of Škofja Loka, Slovenia: MDC Blok (Youth Daily Care Center Blok), PUM (Project learning of Youth), Daily Care Center DCΩ, Daily center Podlbnik (all in Škofja Loka) and Daily Care Center Škrlovec in Kranj. First two are run by the NGO, DC Škrlovec, DCΩ and DC Podlubnik work under the Center for Soc ...
Read Project

 9

 FINISHED 

Zavod O - Kids in Action 2.1

Start date: Jan 1, 2016, End date: Jan 31, 2017,

Longterm EVS project "Zavod O – Kids in Action 2.1"will deepen the cooperation of five daily centers in the wider area of Škofja Loka, Slovenia: MDC Blok (Youth Daily Care Center Blok), PUM (Project learning of Youth), Daily Care Center DCΩ, Daily center Podlbnik (all in Škofja Loka) and Daily Care Center Škrlovec in Kranj. First two are run by the NGO, DC Škrlovec, DCΩ and DC Podlubnik work unde ...
Read Project

 6

 FINISHED 

Zavod O - Kids in Action 2

Start date: Aug 1, 2015, End date: Jan 31, 2017,

Longterm EVS project "Zavod O – Kids in Action 2"will connect five daily centers in the wider area of Škofja Loka, Slovenia: MDC Blok (Youth Daily Care Center Blok), PUM (Project learning of Youth), Daily Care Center DCΩ, Daily center Podlbnik (all in Škofja Loka) and Daily Care Center Škrlovec in Kranj. First two are run by the NGO, DC Škrlovec, DCΩ and DC Podlubnik work under the Center for So ...
Read Project

 9

 FINISHED 
Project HOPE arose from participation in several national and international activism projects. The exchange focuses on helping youth understand and engage in democratic processes. In order to achieve this involvement, youngsters need to be educated about European institutions. By practical implementation of simulation of the work of the European Parliament following the theoretical lectures, we be ...
Read Project

 4

 FINISHED 
The project is planned for a duration of 24 months starting probably in October 2004. Main target of the project is to develop a set of criteria and a rating scale for security staff qualification (including training and experience) to provide transparency and comparability on an international level. The rating is foreseen to be the basis for reciprocal acknowledgement of national qualification un ...
Read Project

 16

 FINISHED 
This double transfer proposal answered its main aim which was strengthening SME sector through empowering its IT specialists by giving them innovative method of training which would work towards the improvement of employees skils and in effect the improvement of European VET system.
Read Project

 6

 FINISHED 
A full interactive educational program for training modules of mechatronics and biomechatronics.
Read Project

 5

 FINISHED 
Reasons: SMEs throughout Europe are not prepared to meet the challenge of ageing labour force. It is common for the management to underestimate older employees due to stereotyping, lack of knowledge, lack of mobility and willingness to learn. On the other hand, rapid growth of ICT contributes to the fact that older people feel unsecure. Lack of ICT skills and knowledge of modern languages makes th ...
Read Project

 6