Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
IMMUNOSABR is geared towards opening up a new paradigm in treating metastatic cancer by obtaining clinical proof of concept for a novel bi-modal curative treatment strategy. High precision stereotactic ablative radiotherapy (SABR) is combined with immunotherapy to form a powerful synergistic anti-tumour strategy. The approach relies on the direct cytotoxic effect of SABR, the abscopal effect of ra ...
Read Project

 17

 FINISHED 

European Human Biomonitoring Initiative (HBM4EU)

Start date: Jan 1, 2017, End date: Dec 31, 2021,

The overarching goal of the European Human Biomonitoring Initiative (HBM4EU) is to generate knowledge to inform the safe management of chemicals and so protect human health. We will use human biomonitoring to understand human exposure to chemicals and resulting health impacts and will communicate with policy makers to ensure that our results are exploited in the design of new chemicals policies an ...
Read Project

 43

 FINISHED 
With the H.C. Ørsted Fellows Programme – co-funded by Marie Skłodowska Curie Actions (COFUNDfellowsDTU) DTU will attract highly talented young researchers through incoming mobility from around the world. The Programme takes place at the Technical University of Denmark (DTU) which is a top ranked university with focus on all Engineering Sciences as well as Life Science and Biotechnology.The Program ...
Read Project

 1

 FINISHED 

Integrated Arctic observation system (INTAROS)

Start date: Dec 1, 2016, End date: Nov 30, 2021,

The overall objective of INTAROS is to develop an integrated Arctic Observation System (iAOS) by extending, improving and unifying existing systems in the different regions of the Arctic. INTAROS will have a strong multidisciplinary focus, with tools for integration of data from atmosphere, ocean, cryosphere and terrestrial sciences, provided by institutions in Europe, North America and Asia. Sate ...
Read Project

 41

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through ...
Read Project

 39

 FINISHED 

Next-generation Detection of Antigen Responsive T-cells (nextDART)

Start date: Jun 1, 2016, End date: May 31, 2021,

Our current ability to map T-cell reactivity to certain molecular patterns poorly matches the huge diversity of T-cell recognition in humans. Our immune system holds approximately 107 different T-cell populations patrolling our body to fight intruding pathogens. Current state-of-the-art T-cell detection enables the detection of 45 different T-cell specificities in a given sample. Therefore compreh ...
Read Project

 1

 FINISHED 
BIG HIT will create a replicable hydrogen territory in Orkney (Scotland) by implementing a fully integrated model of hydrogen production, storage, transportation and utilisation for heat, power and mobility. BIG HIT will absorb curtailed energy from two wind turbines and tidal turbines on the islands of Eday and Shapinsay, and use 1.5MW of PEM electrolysis to convert it into ~50 t pa of hydrogen. ...
Read Project

 12

 FINISHED 

Solar Energy Enabled for the World by High-resolution Imaging (SEEWHI)

Start date: May 1, 2016, End date: Apr 30, 2021,

THE GOALWe will derive new and fundamental insight in the relation between nano-scale structure and the performance of 3rd generation solar cells, and determine how to apply this in large-scale processing.THE CHALLENGESWe currently have a superficial understanding of the correlations between structure and performance of photovoltaic heterojunctions, based on studies of small-scale devices and mode ...
Read Project

 1

 FINISHED 

Pathway to a Competitive European FC mCHP market (PACE)

Start date: Jun 1, 2016, End date: Feb 28, 2021,

PACE is a major initiative aimed at ensuring the European mCHP sector makes the next move to mass market commercialisation. The project will deploy a total of 2,650 new fuel cell microCHP units with real customers and monitor them for an extended period. This will:- Enable fuel cell mCHP manufacturers to scale up production, using new series techniques, and increased automation. By 2018, four lead ...
Read Project

 9

 FINISHED 

Arctic Impact on Weather and Climate (Blue-Action)

Start date: Dec 1, 2016, End date: Feb 28, 2021,

Blue-Action will provide fundamental and empirically-grounded, executable science that quantifies and explains the role of a changing Arctic in increasing predictive capability of weather and climate of the Northern Hemisphere.To achieve this Blue-Action will take a transdisciplinary approach, bridging scientific understanding within Arctic climate, weather and risk management research, with key s ...
Read Project

 40

 FINISHED 

Science and Innovation with thunderstorms (SAINT)

Start date: Mar 1, 2017, End date: Feb 28, 2021,

Lightning is an extremely energetic electric discharge process in our atmosphere. It significantly affects the concentration of greenhouse gases and it threatens electrical and electronic devices, in particular, when placed on elevated structures like wind turbines or aircraft, and when these structures are built with modern composite materials with inherently low electric conductivity. In additio ...
Read Project

 10

 FINISHED 
Municipal solids waste (MSW) are collected by municipalities and represents more than 500 kg/capita (EU-27 average), 300 million tonnes overall every year in the EU-32. Currently, approximately 50% of this volume is landfilled. More than 1.3 million tonnes of Marine rest raw material (MRRM) are generated in Europe each year. Some countries, such as Norway and Denmark, have traditionally for anima ...
Read Project

 17

 FINISHED 
The proposed project “Readiness of ICOS for Necessities of integrated Global Observations” (RINGO) aims to further development of ICOS RI and ICOS ERIC and foster its sustainability. The challenges are to further develop the readiness of ICOS RI along five principal objectives: 1. Scientific readiness. To support the further consolidation of the observational networks and enhance their quality. Th ...
Read Project

 26

 FINISHED 
More than 450.000 people are diagnosed with esophageal cancer (EC) each-year worldwide and approximately 400.000 die from the disease. Esophageal cancer is the eighth most commonly diagnosed cancer, but it is the sixth leading cause of cancer-related death, with incidence rates steeply rising. Risk factors, including gastroesophageal reflux disease and Barrett’s esophagus, may diagnostically impli ...
Read Project

 9

 FINISHED 
Alzheimer’s disease (AD) affects more than 7 million people in Europe and this figure is expected to double every 20 years. Despite intensive efforts, no disease-modifying treatments or preventive strategies are available. The lack of specific, sensitive and minimally invasive diagnostics to identify people with early-stage AD to be included in clinical drug intervention trials is among the main r ...
Read Project

 13

 FINISHED 

Precision Additive Metal Manufacturing (PAM^2)

Start date: Dec 1, 2016, End date: Nov 30, 2020,

Additive Manufacturing (AM) is a fast−growing sector with the ability to evoke a revolution in manufacturing due to its almost unlimited design freedom and its capability to produce personalised parts locally and with efficient material use. AM companies however still face technological challenges such as limited precision due to shrinkage and build−in stresses and limited process stability and ro ...
Read Project

 10

 FINISHED 
The main objective of Training4CRM is to train a new generation of 15 highly inter-disciplinary early stage researchers at the highest international level and quality, who will be immediately employable in both the academic and industrial sectors due to their highly sought after cross- and interdisciplinary insights and expertise. Training4CRM addresses existing gaps within Cell-based Regenerative ...
Read Project

 9

 FINISHED 

Technology Enabled Adolescent Mental Health (TEAM)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

There is no health without mental health. 27% of our population are young, and mental health disorders are our leading cause of disability. 50% of mental disorders emerge by 14 yrs, 75% by 24 yrs and, untreated, triple odds of having a mental health disorder in later life. TEAM’s will build a network of expertise and train a new generation of researchers to deliver more effective, affordable and f ...
Read Project

 9

 FINISHED 
SUPercontinuum broadband light sources covering UV to IR applications (SUPUVIR) will combine the efforts of 6 academic and 4 non-academic beneficiaries to train 15 ESRs for the growing industry within SC broadband light sources, giving them extensive knowledge in silica and soft-glass chemistry, preform design and fibre drawing, linear and nonlinear fibre and waveguide characterization, nonlinear ...
Read Project

 11

 FINISHED 

Multimodal, Functional Bio-Photonic Imaging (FBI)

Start date: Oct 1, 2016, End date: Sep 30, 2020,

FBI fosters education of ESRs on an emerging, multimodal imaging platform and its translation into clinical and biological applications. In FBI, 15 ESRs are trained at world-leading European academic institutions and companies, thus forming strong interdisciplinary relations between industry, technical sciences and clinical end-users.Optical imaging has huge potential to address unmet clinical nee ...
Read Project

 10

 FINISHED 

Predictive and Accelerated Metabolic Engineering Network (PAcMEN)

Start date: Oct 1, 2016, End date: Sep 30, 2020,

The world economy is dependent on fossil resources: oil, gas and coal. The fossil resources are finite and their consumption causes catastrophic environmental changes. Therefore we need to move towards sustainable economy using renewable resources for energy and chemicals production. Via metabolic engineering approach, novel microbial cells can be created that can convert biomass and waste into fu ...
Read Project

 7

 FINISHED 
MACRO CASCADE will prove the concept of the cascading marine macroalgal biorefinery i.e. a production platform that covers the whole technological chain for processing sustainable cultivated macro-algae biomass – also known as seaweed - to highly processed value added products. The macro-algae biorefinery will be capable of processing multiple feedstocks, by deploying a range of mechanical, phy ...
Read Project

 13

 FINISHED 
NoAW : No Agro-Waste.Innovative approaches to turn agricultural waste into ecological and economic assets.Driven by a “near zero-waste” society requirement, the goal of NoAW project is to generate innovative efficient approaches to convert growing agricultural waste issues into eco-efficient bio-based products opportunities with direct benefits for both environment, economy and EU consumer. To ach ...
Read Project

 32

 FINISHED 
AQUAEXCEL2020 aims to integrate top class European aquaculture research facilities of very diverse nature, covering all relevant scientific fields for research and innovation in aquaculture, from genetics to technology through pathology, physiology and nutrition. It will put in place a user-friendly one-stop access to high-quality services and resources from 39 installations covering both establis ...
Read Project

 22

 FINISHED 
Sediments preserve a history of the evolution of the Earth’s surface and its response to a changing climate – a history that can only be read reliably if we know the age of the sediments. Luminescence dating is widely used in quaternary geology and archaeology, and is applicable to almost all sediments from the last 0.5 Ma – it dates the last time the sediment grains were exposed to daylight. RELO ...
Read Project

 2

 FINISHED 

Adaptive Management of Barriers in European Rivers (AMBER)

Start date: Jun 1, 2016, End date: May 31, 2020,

Rivers rank among some of the most threatened ecosystems in the world, and are the focus of costly restoration programmes that cost billions to taxpayers. Much of Europe depends on water from rivers for drinking, food production, and the generation of hydropower, which is essential for meeting the EU renewable energy target. Yet only half the EU surface waters have met the WFD’s 2015 target of goo ...
Read Project

 21

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 
Drug resistance is limiting our ability to treat most infectious diseases and forms of cancer. Indeed this relentless evolution is the major driver of treatment failure for diseases that are responsible for over half of the global disease related mortality. Yet, the underlying principles that guide this evolutionary response are poorly understood, in particular with regards to understanding the im ...
Read Project

 1

 FINISHED 

Citizen Led Air pollution Reduction in Cities (CLAiR-CITY)

Start date: May 1, 2016, End date: Apr 30, 2020,

CLAiR-City will apportion air pollution emissions and concentrations, carbon footprints and health outcomes by city citizens’ behaviour and day-to-day activities in order to make these challenges relevant to how people chose to live, behave and interact within their city environment. Through an innovative engagement and quantification toolkit, we will stimulate the public engagement necessary to a ...
Read Project

 17

 FINISHED 
European aquaculture production provides direct employment to 80,000 people and a 3-billion € annual turnover. Parasites cause severe disease outbreaks and high economic losses in finfish aquaculture. The overarching goal of ParaFishControl is to increase the sustainability and competitiveness of European Aquaculture by improving understanding of fish-parasite interactions and by developing innova ...
Read Project

 31

 FINISHED 

Climate change and European aquatic RESources (CERES)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

CERES advances a cause-and-effect understanding of how future climate change will influence Europe’s most important fish and shellfish populations, their habitats, and the economic activities dependent on these species. CERES will involve and closely cooperate with industry and policy stakeholders to define policy, environment, social, technological, law and environmental climate change scenarios ...
Read Project

 26

 FINISHED 
CELTA: Convergence of Electronics and Photonics Technologies for Enabling Terahertz Applications aims to produce the next generation of researchers who will enable Europe to take a leading role in the multidisciplinary area of utilizing Terahertz technology for applications involving components and complete systems for sensing, instrumentation, imaging, spectroscopy, and communications. All these ...
Read Project

 13

 FINISHED 
Omics data is not leveraged effectively in the biotechnology industry due to lack of tools to rapidly access public and private data and to design cellular manipulations or interventions based on the data. With this project we aim to make a broad spectrum of omics data useful to the biotechnology industry covering application areas ranging from industrial biotechnology to human health. We will dev ...
Read Project

 10

 FINISHED 

Preventing and mitigating farmed bivalve diseases (VIVALDI)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

The overarching goal of VIVALDI is to increase the sustainability and competitiveness of the European shellfish industry by improving the understanding of bivalve diseases and by developing innovative solutions and tools for the prevention, control and mitigation of the major pathogens affecting the main European farmed shellfish species: Pacific oyster (Crassostrea gigas), mussels (Mytilus edulis ...
Read Project

 21

 FINISHED 
The health expenditure in the EU is expected to rise by 350% by 2050 compared to an economic expansion of only 180% and the provision of Long Term Care (LTC) will pose an increasing challenge to the sustainability of public finances in the EU, due to an ageing population. REACH therefore represents a solution that seeks to prevent elderly citizens from loss of function and a decline of being able ...
Read Project

 18

 FINISHED 

Next generation sepsis diagnosis (SMARTDIAGNOS)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

Sepsis is a potentially fatal condition that arises when the body’s response to an infection damages its own tissues and organs. It is mainly caused by bacteria and fungi, which spread through the blood circulation. It is one of the biggest public health issue in the EU and worldwide due to its high incidence, mortality, human and economic cost. Early diagnosis is crucial to the management of seps ...
Read Project

 10

 FINISHED 
The INSIGHT project aims at developing a Monitoring, Diagnostic and Lifetime Tool (MDLT) for Solid Oxide Fuel Cell (SOFC) stacks and the hardware necessary for its implementation into a real SOFC system. The effectiveness of the MDLT will be demonstrated through on-field tests on a real micro-Combined Heat and Power system (2.5 kW), thus moving these tools from Technology Readiness Level (TRL) 3 t ...
Read Project

 11

 FINISHED 
The overall objective of the QualyGridS project is the establishing of standardized tests for electrolysers performing electrical grid services. Alkaline electrolysers as well as PEM electrolysers will be considered individually in performance analysis and in an assessment of business cases for these electrolysers’ use. A variety of different grid services will be addressed as well as multiple hyd ...
Read Project

 10

 FINISHED 
The decline of freshwater fish biodiversity is proceeding at an alarming and persistent rate. Given that most fish must undertake some form of migration in order to complete their life-cycle, of particular concern is the proliferation of hydropower schemes that block migration routes, as well as a variety of other barriers such as weirs and culverts. Several locations in the southern hemisphere ar ...
Read Project

 4

 FINISHED 

REsources from URban BIo-waSte (RES URBIS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

RES URBIS aims at making it possible to convert several types of urban bio-waste into valuable bio-based products, in an integrated single biowaste biorefinery and by using one main technology chain. This goal will be pursued through: - collection and analysis of data on urban bio-waste production and present management systems in four territorial clusters that have been selected in different cou ...
Read Project

 22