Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

NANOSCIENCE FOUNDRIES AND FINE ANALYSIS - EUROPE (NFFA-Europe)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

NFFA-EUROPE will implement the first open-access research infrastructure as a platform supporting comprehensive projects for multidisciplinary research at the nanoscale extending form synthesis to nanocharacterization to theory and numerical simulation. The integration and the extension of scope of existing specialized infrastructures within an excellence network of knowledge and know-how will ena ...
Read Project

 21

 FINISHED 
Imagine an inherently safe reactor that produces all electricity world-wide for thousands of years, and recycles all actinides until fission.The Molten Salt Fast Reactor (MSFR) can reach this goal. The cylindrical reactor core contains actinide-fluorides mixed in lithium-fluoride. The liquid salt is at ambient pressure and can freely expand upon heating, giving a strong negative reactivity feedbac ...
Read Project

 11

 FINISHED 
Development and construction of accelerator based scientific Research Infrastructures are going through a deep paradigm change because of the need for large scale Technological Infrastructures at the forefront of technology to master the key accelerator and magnet science and technology needed for several fields. Indeed, because of the high technological level and of the increased size and time sc ...
Read Project

 12

 FINISHED 

EXTended Model of Organic Semiconductors (EXTMOS)

Start date: Jul 1, 2015, End date: Jun 30, 2019,

EXTMOS’ main objective is to create a materials model and the related user friendly code that will focus on charge transport in doped organic semiconductors. Its aims are (i) to reduce the time to market of(a) multilayer organic light emitting devices, OLEDs, with predictable efficiencies and long lifetimes (b) organic thin film transistors and circuits with fast operation.(ii) to reduce productio ...
Read Project

 14

 FINISHED 

European Circular Energy-Frontier Collider Study (EuroCirCol)

Start date: Jun 1, 2015, End date: May 31, 2019,

The award of the 2013 Nobel Prize for Physics acknowledged the leading role of Europe in particle physics, which has a global community of over 10,000 scientists. To reinforce its pole position throughout the 21st century, Europe must be ready to propose an ambitious post-LHC accelerator project by 2018/19. This is one of the main recommendations of the updated European Strategy for Particle Physi ...
Read Project

 17

 FINISHED 
The HORIZON 2020 EURATOM Collaborative Project “Cement-based materials, properties, evolution, barrier functions (Cebama)” is developed with the overall objective to support implementation of geological disposal of nuclear waste by improving the knowledge base for the Safety Case. Cement-based materials are highly relevant in this context, being used as waste forms, liners and structural component ...
Read Project

 28

 FINISHED 
Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Read Project

 38

 FINISHED 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Read Project

 28

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Read Project

 39

 FINISHED 
The interest for developing smart systems based on interconnected objects is growing fast (50 billion objects connected in 2020). The main components of “Internet of Things” (IoT) devices are autonomous battery-operated smart embedded systems comprising communication circuits, sensors, computing/processing devices and storage. The key requirements are ultra-low power, high processing capabilities, ...
Read Project

 9

 FINISHED 
StratoClim will produce more reliable projections of climate change and stratospheric ozone by a better understanding and improved representation of key processes in the Upper Troposphere and Stratosphere (UTS). This will be achieved by an integrated approach bridging observations from dedicated field activities, process modelling on all scales, and global modelling with a suite of chemistry clima ...
Read Project

 30

 FINISHED 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Read Project

 126

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

...stries, which work closely together in 15 technical work packages and five supporting work packages covering the entire value chain from materials to components and systems. As time progresses, the centre of gravity of the Flagship moves towards applications, which is reflected in the increasing importance of the higher - system - levels of the value chain. In this first core project the main focu ...
Read Project

 158

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 
ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Read Project

 29

 FINISHED 
The INDIGO-DataCloud project (INDIGO for short) aims at developing a data/computing platform targeted at scientific communities, deployable on multiple hardware, and provisioned over hybrid (private or public) e-infrastructures. This platform will be built by leading European developers, resource providers, e-infrastructures and scientific communities in order to ensure its successful exploitation ...
Read Project

 27

 FINISHED 

Open Project for the European Radiation Research Area (OPERRA)

Start date: Jun 1, 2013, End date: May 31, 2017,

"Within the OPERRA project, it is proposed that the MELODI Association, as a well-advanced network, takes the lead in establishing the necessary structures able to manage the long-term European research programmes in radiation protection, also taking advantage of the valuable experience gathered through the DoReMi network of excellence. Whilst in fields adjacent to low-dose risk research (radioeco ...
Read Project

 71

 FINISHED 
Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Read Project

 40

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Read Project

 116

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

MyrrhA Research Infrastructure Support Action (MARISA)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Read Project

 17

 FINISHED 
"ETRERA 2020 - Empowering Trans-mediterranean Renewable Energy Research Alliance for 2020 energy targets – is a project aimed at face front the future energy needs in the Euro –Mediterranean area by reinforcing creating a collaborative research/innovation network for supporting renewable energy sources (RES) technologies development and application, in accordance with EU policy addresses.The ETRER ...
Read Project

 12

 FINISHED 

Safety of ACtinide Separation proceSSes (SACSESS)

Start date: Mar 1, 2013, End date: Jun 30, 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Read Project

 26

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
The microelectronics industry will face major challenges related to power dissipation and energy consumption in the next years. Both static and dynamic consumption will soon start to limit microprocessor performance growth. The goal of the spOt project is to modify the memory hierarchy by the integration of non-volatility (NV) as a new feature of memory cache, which would immediately minimize stat ...
Read Project

 10

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 

Integrated non-CO2 Greenhouse gas Observing System (INGOS)

Start date: Oct 1, 2011, End date: Dec 31, 2015,

InGOS will support and integrate the observing capacity of Europe for non-CO2 greenhouse gases (NCGHG: CH4, N2O, SF6, H2 and halocarbons). The emissions of these gases are very uncertain and it is unknown how future climate change will feedback into the land use coupled emissions of CH4 and N2O. The NCGHG atmospheric abundances will increase further in the future and the emissions of these gases a ...
Read Project

 39

 FINISHED 
Safety issues are of fundamental importance for the acceptance and sustainable application of nuclear energy. Actinides play a central role in the nuclear fuel cycle from mining, fuel fabrication, energy production, up to treatment of used fuel by reprocessing, partitioning and transmutation and/or finally management and disposal of radioactive waste. A fundamental understanding of actinide proper ...
Read Project

 12

 FINISHED 

Self adaptive heterogeneous manycore based on Flexible Tiles (FlexTiles)

Start date: Oct 15, 2011, End date: Apr 14, 2015,

Description To develop an energy-efficient programmable heterogeneous manycore platform with self-adaptive capabilities that apply to cognitive radio, video processing, embedded devices and ambient computingA major challenge in computing is to leverage multi-core technology to develop energy-efficient high performance systems. This is cri ...
Read Project

 12

 FINISHED 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Read Project

 39

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 

SmartGrids ERA-NET (SMARTGRIDS ERA-NET)

Start date: Sep 1, 2008, End date: Feb 28, 2014,

SmartGrids ERA-NET develops transnational research activities to speed up the development of a Smart European Electrical Infrastructure. A necessity for a successful realisation of the European Action Plan “Energy Policy for Europe”. This will change the European electricity supply with strong consumer response, large scale supplies of renewable electricity and high levels of distributed generati ...
Read Project

 26

 FINISHED 

GEn IV and Transmutation MATerials (GETMAT)

Start date: Feb 1, 2008, End date: Oct 31, 2013,

In FP5 and FP6, a number of significant projects have been launched, aimed at investigating innovative strategies for safe and optimised radioactive waste management. In particular P/T strategies based on the use of Accelerator Driven Systems are being addressed within the integrated project EUROTRANS. Moreover, during FP6, projects were also initiated to study advanced systems, as defined in the ...
Read Project

 24

 FINISHED 

Solid State Systems for Quantum Information Processing (SOLID)

Start date: Feb 1, 2010, End date: Sep 30, 2013,

...based on fixed or tunable microwave cavities and optical nanophotonic cavities. Various types of solid-state qubits will be connected to these "hubs": Josephson junction circuits, quantum dots and NV centres in diamond. The approach can immediately be extended to connecting different types of solid-state qubits in hybrid devices, opening up new avenues for processing, storage and communication. Th ...
Read Project

 15

 FINISHED 

European Coordination for Accelerator Research and Development (EuCARD)

Start date: Apr 1, 2009, End date: Jul 31, 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Read Project

 39

 FINISHED 

Empowering Tunisian Renewable Energy Research Activities (ETRERA)

Start date: Jan 1, 2010, End date: Jun 30, 2013,

...he project goal is to unlock the large knowledge potential from European research activities in the area of renewable Energy field for uptake and exploitation in scientific and technological research centres of a MPC third country. Therefore ETRERA –Empowering Tunisian Renewable Energy Research Activities- will provide a contribute to strengthen a closer cooperation between European research centr ...
Read Project

 5

 FINISHED 

ACTINET Integrated Infrastructure Initiative (ACTINET-I3)

Start date: Oct 1, 2009, End date: Jan 31, 2013,

"Actinides play a central role in the nuclear energy generation systems. In order to keep a leading position in the field of nuclear energy – both in terms of safety and efficient use of natural resources – Europe needs to reinforce its expertise and to prepare the next generation of scientists and engineers who will be able to contribute to develop actinide management strategies based on sound sc ...
Read Project

 10

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35