Search for European Projects

29 European Projects Found

Searched on 125080 European Projects

 FINISHED 

ROS-Industrial quality-assured robot software components (ROSIN)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

...ated code quality testing led by IT University Copenhagen, complemented with a full palette of quality assurance measures including novel model-in-the-loop continuous integration testing with ABB robots. Simultaneously, more ROS-Industrial tools and components will be created by making 50% of the ROSIN budget available to collaborating European industrial users and developers for so-called Focused ...
Read Project

 7

 FINISHED 
Machine learning have revolutionized the way we use computers and is a key technology in the analysis of large data sets. The FUDIPO project will integrate machine learning functions on a wide scale into several critical process industries, showcasing radical improvements in energy and resource efficiency and increasing the competitiveness of European industry. The project will develop three large ...
Read Project

 11

 FINISHED 
In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Read Project

 35

 FINISHED 
The European robotics industry is moving towards a new generation of robots, based on safety in the workplace and the ability to work alongside humans. This new generation is paramount to making the factories of the future more cost-effective and restoring the competitiveness of the European manufacturing industry. However, the European manufacturing industry is facing the following challenges: (1 ...
Read Project

 18

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Smart Assembly Robot with Advanced FUNctionalities (SARAFun)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

While Industrial robots are very successful in many areas of industrial manufacturing, assembly automation still suffers from complex time consuming programming and the need of dedicated hardware. ABB has developed FRIDA (Friendly Robot for Industrial Dual Arm Assembly), a collaborative inherently safe assembly robot that is expected to reduce integration costs significantly by offering a standard ...
Read Project

 7

 FINISHED 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Read Project

 17

 FINISHED 
The DISIRE project has been inspired by the real existing needs of multiple industrial sectors, including the world leading industrial partners in the non-ferrous, ferrous, chemical and steel industries that are highly connected and already affiliated with the SPIRE PPP and its objectives. The overall clear and measurable objective of the DISIRE project is to evolve the existing industrial process ...
Read Project

 15

 FINISHED 

Security for smart Electricity GRIDs (Segrid)

Start date: Oct 1, 2014, End date: Sep 30, 2017,

SEGRID’s main objective is to enhance the protection of smart grids against cyber-attacks. We do this by applying a risk management analysis approach to a number of smart grid use cases (the SEGRID use cases), which will define security requirements and determine gaps in current security technologies, standards and regulations. The identified gaps and the analysis itself will give input to the enh ...
Read Project

 12

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Read Project

 11

 FINISHED 

From education to the labour market

Start date: Jun 1, 2014, End date: May 31, 2016,

The project's overall objective is to ensure that students, teachers and education managers achieve subject-related and intercultural competence through an individually planned and qualitative cooperation with the international partners. With this project we aim to help strengthen our VET-students' progress from being a student to enter the labour market by giving them access to practice-oriented ...
Read Project

 10

 FINISHED 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Read Project

 13

 FINISHED 
The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only these eco-efficient mines will contribute to improved access to domestic mineral resources, secure the supply of mineral raw materials for Europe and reduce the import dependency.IntelliMine will contr ...
Read Project

 27

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Read Project

 15

 FINISHED 
"HERCULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology ...
Read Project

 23

 FINISHED 
This project aims at improving the operational efficiency of large-scale dynamic plants as found in petrochemical, chemical and other process industries. Costs related with industrial implementation of current model-based operation support systems, like Model Predictive Control, Real-Time Optimization and soft-sensors for these complex processes are currently very high. Moreover it is widely recog ...
Read Project

 7

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 

Future INternet for Smart ENergY (FINSENY)

Start date: Apr 1, 2011, End date: Apr 30, 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Read Project

 41

 FINISHED 
Description Developing "human-centric" technology for industrial robots Robots for industrial production still need a lot of skilled engineering effort for installation, setup and programming. They also require closed-ended environments, with physical protection devices to separate them from human ...
Read Project

 8

 FINISHED 

Infrastructure Roadmap for Energy Networks in Europe (IRENE-40)

Start date: Sep 1, 2008, End date: Oct 31, 2012,

The IRENE-40 project will identify strategies for investors and regulators to build a more secure, ecologically sustainable and competitive European electricity system. The strategies will be presented in a roadmap, i.e. a timeline with actions and a description of development stages towards future electricity networks over the coming 40 years. It will provide investment strategies for the indivi ...
Read Project

 9

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 
"The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fa ...
Read Project

 22

 FINISHED 
"The project HERCULES-B is the Phase II of the HERCULES programme, conceived in 2002 as a 7-year strategic R&D Plan, to develop the future generation of optimally efficient and clean marine diesel powerplants. The project is the outcome of a joint vision by the two major European engine manufacturer Groups, MAN Diesel and WARTSILA, which together hold 90% of the world’s marine engine market. The r ...
Read Project

 32

 FINISHED 
Society is increasingly dependent on the proper functioning of the electric power system, which in turn supports most other critical infrastructures: water and sewage systems; telecommunications, internet and computing services; air traffic, railroads and other transportation. Many of these other infrastructures are able to operate without power for shorter periods of time, but larger power outage ...
Read Project

 10

 FINISHED 

Active distribution network (ADINE)

Start date: Oct 1, 2007, End date: Sep 30, 2010,

Considerable amount of renewable energy in Europe represents distributed generation (DG). One of the main barriers for the penetration of DG at distribution network level is the complexity of the interconnection of DG. The overall aim of the ADINE-project is to develop, demonstrate and validate a new Active Network Management (ANM) method of distribution network including DG and enabling solutions ...
Read Project

 7

 FINISHED 
Background Over the past ten years, a number of environmental tools have been developed for the purpose of monitoring and controlling the environmental impact of industrial activities and that of separate products or product groups. Examples of such tools include risk assessment, life-cycle assessment (LCA), life-cycle cost (LCC), design for environment ...
Read Project

 4