Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

LArge Passenger Aircraft Reliable Touch Screen. (LAPARTS)

Start date: Sep 1, 2016, End date: Dec 31, 2023,

The purpose of LAPARTS is to develop a Touch Screen Control Panel (TSCP) system that can host all functionalities currently hosted on the Overhead Control Panel (OCP). The OCP today consists of numerous electro-mechanical switches, buttons, knobs and annunciators connected with discrete wires to the aircraft systems. The current state of art of OCPs has several issues with ergonomic, economic and ...
Read Project

 1

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
...t and testing capacities. The University of Greifswald will provide plasma simulation to support the thrusters developed. These eight partners in five European member-states (Germany, France, UK, Belgium, Italy) will develop an economical and well-performing HEMPT LEO and GEO EPS to guarantee European leadership and competitiveness, as well as the non-dependence of European capabilities in electri ...
Read Project

 10

 FINISHED 
The Directive 2009/128/EC sets rules in EU for the sustainable use of pesticides to reduce the risks and impacts of pesticide use on people's health and the environment. Among the listed actions there is the promotion of low pesticide-input management including non-chemical methods. In parallel several chemical active ingredients have been banned because of toxicity concerns. The result is that gr ...
Read Project

 11

 FINISHED 
Europe is faced with the challenge of sustaining a secure supply of by-product metals, which play a fundamental role in the competitiveness of the manufacturing sector and innovations in high-tech sectors. To loosen the growth restrictions imposed by the inflexible supply from primary mining, alternative sources for these metals must be explored. At the same time a wealth of metals is entrapped wi ...
Read Project

 11

 FINISHED 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Start date: Nov 1, 2016, End date: Apr 30, 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Read Project

 14

 FINISHED 

STORY- Added value of STORage in distribution sYstems (STORY)

Start date: May 1, 2015, End date: Apr 30, 2020,

The main objective of STORY is to show the added value storage can bring for a flexible, secure and sustainable energy system. This will be achieved by showing the inter-relations between technologies and stakeholders as well as the potential and impact of policy and regulation.The future European grid has to serve a diverse and mixed landscape of users in a situation of mixed rules and responsibi ...
Read Project

 18

 FINISHED 

Integrated Surface Management (PJ03a SUMO)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Read Project

 37

 FINISHED 

Total Airport Management (PJ04 TAM)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Read Project

 30

 FINISHED 
The project targets the incorporation of advanced functional materials to deliver customised conductive inks and flexible adhesives compatible with high volume manufacturing platforms. Specifically the development of these enabling materials will support high speed roll to roll integration of hybrid and large area electronics to address internet of things opportunities.The consortium will integra ...
Read Project

 14

 FINISHED 

Common Services (PJ15 COSER)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The legacy of Air Traffic Management (ATM) evolution in Europe has resulted in today’s highly fragmented, country-based, services. A consequence of this fragmentation, there is a negative impact on the cost in the provision of ATM service in Europe. A fundamental goal of the Single European Sky initiative is to “provide ATM services to airspace users at a cost of at least 50 % less”. The notion ...
Read Project

 19

 FINISHED 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Read Project

 30

 FINISHED 

Airport Safety Nets (PJ03b SAFE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Read Project

 28

 FINISHED 

MagnetIc NOzzle thruster with elecTron cyclOtron Resonance (MINOTOR)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

MINOTOR’s strategic objective is to demonstrate the feasibility of the ECRA technology as a disruptive game-changer in electric propulsion, and to prepare roadmaps paving the way for the 2nd EPIC call, in close alignment with the overall SRC-EPIC strategy.Based on electron cyclotron resonance (ECR) as the sole ionization and acceleration process, ECRA is a cathodeless thruster with magnetic nozzle ...
Read Project

 7

 FINISHED 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Read Project

 29

 FINISHED 

4D Trajectory Management (PJ18 4DTM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

One of the main obstacles of reaching Single European Sky’s objectives is management of flight trajectories. Inaccuracies are difficult to spot and information given to stakeholders about the trajectory is limited, arriving late, and full of inconsistencies and wrong assumptions. Military Flights are currently not integrated in the ATM-system, so demanding special treatment.Additionally, there is ...
Read Project

 29

 FINISHED 
The main objective of this proposal is to develop reliable GaN-based power devices and systems for high and medium power electronics targeting industrial and automotive applications and bringing the GaN power devices another step towards the wide usability in the energy saving environment to further tap the full potential which this new material brings along.This proposal addresses two subjects, o ...
Read Project

 11

 FINISHED 

Content Integration (PJ19 CI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Read Project

 28

 FINISHED 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Read Project

 30

 FINISHED 
PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Read Project

 28

 FINISHED 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Start date: Nov 1, 2016, End date: Nov 30, 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Read Project

 31

 FINISHED 

Advanced Airspace Management (PJ08 AAM)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Read Project

 20

 FINISHED 

Advanced DCB (PJ09 DCB)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Read Project

 30

 FINISHED 

PJ07 Optimised Airspace Users Operations (PJ07 OAUO)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The SES Performance Scheme established the principles of performance-driven ATM and Network-wide Collaborative decision making including Civil and State Airspace Users. Hence, it is critical that Flight and Wings Operation Centres processes and tools be enriched for more efficient interaction with ATM Network stakeholders including Airports. Improved performance of ATM depends on a higher certaint ...
Read Project

 14

 FINISHED 
The European industry is currently a world leader in aviation and to maintain its leading position and competitiveness in the dynamic global market, Europe’s industry must develop quickly and efficiently high quality products by meeting time-critical market demands and customers’ needs. Industrial competition is becoming fiercer not only from established regions, such as the USA, but from new eme ...
Read Project

 14

 FINISHED 
ELECTRIFIC will revolutionise how electric vehicles are integrated into power grid and users’ life. The fundamental premise on which the project will work that significant improvements to electromoblity can be unlocked by increasing coordination of all the actors in the electromobility ecosystem. To this end, the project will deliver novel techniques and ICT tools for enabling such coordination at ...
Read Project

 11

 FINISHED 
SELIS is aimed at delivering a ‘platform for pan-European logistics applications’ by:- Embracing a wide spectrum of logistics perspectives and creating a unifying operational and strategic business innovation agenda for pan European Green Logistics.- Establishing an exceptionally strong consortium of logistics stakeholders and ICT providers, that can leverage EU IP from over 40 projects so as to c ...
Read Project

 38

 FINISHED 

Intelligent Hybrid Thermo-Chemical District Networks (H-DisNet)

Start date: Jun 1, 2016, End date: May 31, 2019,

The innovative thermo-chemical (TC) network technology of H-DisNet will contribute to next-generation district energy networks. The technology will exploit high chemical potential of absorption processes for loss-free transport and storage of energy potential. It will be applied to form an intelligent district network with thermal, electric and gas networks. This intelligent thermo-chemical distri ...
Read Project

 7

 FINISHED 
The European lighting industry aims at reducing cost, at continuously improving product performance while reducing time to market and enlarging the product. The main challenge for the design in of LED components into lighting systems is the temperature and current dependence of their performance. In order to achieve a good design of LED systems, a modular, multi-physics based modelling approach is ...
Read Project

 15

 FINISHED 
To reduce the total cost of low enthalpy geothermal systems by 20-30 % the project will improve actual drilling/installation technologies and designs of Ground Source Heat Exchangers (GSHE’s). This will be combined with an holistic approach for optimum selection, design and implementation of complete systems across different underground and climate conditions. The proposal will focus on one hand ...
Read Project

 17

 FINISHED 

PARAGONE: vaccines for animal parasites (Paragone)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

Helminth and ectoparasitic infections of ruminants and poultry have a huge impact on the biological efficiency of these vital food sources. Indiscriminate antiparasitic use has led to drug resistance across the globe. The main alternative to the dwindling supply of antiparasitics is vaccines. Here, in the PARAGONE project, findings from previous EU and other-funded projects on parasite vaccine dev ...
Read Project

 19

 FINISHED 

Technology Advances and Key Enablers for 5 nm (TAKE5)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The TAKE5 project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 10nm technology node and the ECSEL JU project SeNaTe aiming at the 7nm technology node. The main objective of the TAKE5 project is the demonstration of 5nm patterning in line with the industry needs and the ITRS roadmap in the Advanced Patter ...
Read Project

 13

 FINISHED 

CleAnweb Gamified Energy Disaggregation (ChArGED)

Start date: Mar 1, 2016, End date: Feb 28, 2019,

ChArGED addresses the energy consumption in public buildings and proposes a framework that aims to facilitate achieving greater energy efficiency and reductions of wasted energy in public buildings. The framework leverages IoT enabled, low-cost devices (NFC or iBeacons) to improve energy disaggregation mechanisms that provide energy use and (consequently) wastages at the device, area and end user ...
Read Project

 9

 FINISHED 
The goal of this ETN is to develop advanced cryptographic techniques for the Internet of Things and the Cloud and to create implementations that offer a high level of security and increased usability, for a wide range of physical computation platforms. The ITN will equip a group of 15 early stage researchers with a set of interdisciplinary skills combining mathematics, computer science and electri ...
Read Project

 8

 FINISHED 
Europe´s electricity sector is in the midst of major transformation moving from public monopolies to competitive private companies in liberalized markets. The liberalization is expected to increase competition and thus increase cost-efficiency in energy production, transmission and distribution with the result of decreasing electricity prices. The efforts of Member State governments to create a mo ...
Read Project

 11

 FINISHED 

Metrology for future 3D-technologies (METRO4-3D)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Within the food chain of equipment delivery for the semiconductor industry, Europe has kept a very strong position in the metrology area with many companies establishing themselves as main leaders in the field. Hence in line with the objectives of the ICT25 call for innovation action to overcome the (initial) barriers for the successful commercialization of novel European products, this project a ...
Read Project

 9

 FINISHED 

RLEF Training and Education Portal

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Rugby league in Europe continues to grow rapidly. The RLEF is dealing with the fundamental need to ensure its growing network of members is equipped with knowledgeable, competent and qualified staff able to disseminate the sport’s on- and off-field values and techniques at a high level of quality, and ensuring it is administered by robust, democratic and transparent NFs.By far the largest constitu ...
Read Project

 22

 FINISHED 

Adoptive Gateways for dIverse muLtiple Environments (AGILE)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

AGILE project aims to create an open, flexible and widely usable IoT solution at disposal of industries (startups, SMEs, tech companies) and individuals (researchers, makers, entrepreneurs) as a framework that consists of:• A modular IoT gateway enabling various types of devices (wearables, home appliances, sensors, actuators, etc.) to be connected with each other and to the Internet;• Data manage ...
Read Project

 20

 FINISHED 

5G Applications and Devices Benchmarking (TRIANGLE)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The focus of TRIANGLE is the development of a framework that facilitates the evaluation of the QoE of new mobile applications, services and devices designed to operate in the future 5G mobile broadband networks. The framework will exploit existing FIRE facilities adding new facilities when necessary.The project will identify reference deployment scenarios, will define new KPIs (Key Performance Ind ...
Read Project

 7

 FINISHED 
The CloseWEEE project integrates three interlinked research and innovation areas for an improved, resource-efficient recycling of polymer materials and critical raw materials from electrical and electronics equipment (EEE):(1) Efficient and effective disassembly of EEE is key for high quality material fractions, separation of materials but also for reuse of components and parts. An information sy ...
Read Project

 13