Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The EU population is increasingly exposed to new physical and chemical agents in the environment, some of which may be detrimental to public health. Of these, electromagnetic fields (EMF) are one of the most ubiquitous, with new EMF technologies and novel applications being actively developed and commercialised. To address pertinent questions on EMF and health, GERoNiMO proposes an integrated appr ...
Read Project

 27

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

FIRE LTE testbeds for open experimentation (FLEX)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

FIRE initiative targets the creation of a multidisciplinary research platform for investigation and experimental evaluation of innovative ideas in networking and services.At the infrastructure level, such a platform should embrace all major wired and wireless access technologies.FLEX aims at contributing a crucial missing piece in FIRE's infrastructure puzzle:cellular access technologies and Long- ...
Read Project

 17

 FINISHED 

Management of the Future Internet (Flamingo)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

The goals of FLAMINGO are (a) to strongly integrate the research of leading European research groups in the area of network and service management, (b) to strengthen the European and worldwide research in this area, and (c) to bridge the gap between scientific research and industrial application. To achieve these goals, FLAMINGO performs a broad range of activities, such as to develop open source ...
Read Project

 9

 FINISHED 

Forging Online Education through FIRE (FORGE)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Forging Online Education through FIRE (FORGE) is a project proposal bringing the FIRE and eLearning worlds together. FORGE will align FIRE with the ongoing education revolution for mutual benefit. In particular, this project is concerned with specifying development methodologies and best practices for offering FIRE experimentation facilities to learners and to the learning community in general, re ...
Read Project

 8

 FINISHED 

Federation for FIRE (Fed4FIRE)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Read Project

 43

 FINISHED 

Future Service Oriented Networks (FUSION)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

The Future Service Oriented Networks (FUSION) project will develop a new networking architecture designed to natively support efficient provisioning, discovery and execution of service components distributed over the network. Today's cloud computing architectures are centralised and network-agnostic. This makes them unfit for geographically distributed services with tight QoS-constraints and high ...
Read Project

 5

 FINISHED 
Description The primary objective of the FELIX project is to create a common framework in which users can request, monitor and manage a slice provisioned over distributed and distant Future Internet experimental facilities in Europe and Japan. FELIX, submitted as a joint effort of two independent consortia (i.e. FELIX-EU in Europe, FELIX-JP ...
Read Project

 6

 FINISHED 
The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Read Project

 16

 FINISHED 
The main target at which SMARTFIRE aims is the design and implementation of a shared experimental facility spanning different islands located in Europe (EU) and South Korea (KR). This large scaled facility will promote joint experimentation among EU and KR experimenters, encouraging them to conceive and implement innovative protocols, able to take advantage of the current leading network technolog ...
Read Project

 12

 FINISHED 

Cognitive Radio Experimentation World (CREW)

Start date: Oct 1, 2010, End date: Sep 30, 2015,

The main target of CREW is to establish an open federated test platform, which facilitates experimentally-driven research on advanced spectrum sensing, cognitive radio and cognitive networking strategies in view of horizontal and vertical spectrum sharing in licensed and unlicensed bands.The CREW platform incorporates 5 individual wireless testbeds (heterogeneous ISM @ iMinds-Gent, heterogeneous l ...
Read Project

 17

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

Community Networks Testbed for the Future Internet (CONFINE)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

Community networks are an emerging and successful model for the Future Internet across Europe and far beyond. The CONFINE project complements existing FIRE infrastructure by establishing a new facility built on the federation of existing community IP networks constituted by more than 20,000 nodes and 20,000 Km of links. These community networks incorporate a large and wide variety of commodity ...
Read Project

 24

 FINISHED 
The SEMAFOUR project will design and develop a unified self-management system, which enables the network operators to holistically manage and operate their complex heterogeneous mobile networks. The ultimate goal is to create a management system that enables an enhanced quality of user experience, improved network performance, improved manageability, and reduced operational costs. SEMAFOUR aims at ...
Read Project

 9

 FINISHED 

Network of Excellence in Internet Science (EINS)

Start date: Dec 1, 2011, End date: May 31, 2015,

The goal of EINS is coordinating and integrating European research aimed at achieving a deeper multidisciplinary understanding of the development of the Internet as a societal and technological artefact, whose evolution is increasingly interwined with that of human societies. Its main objective is to allow an open and productive dialogue between all the disciplines which study Internet systems und ...
Read Project

 48

 FINISHED 
The EVARILOS project addresses one of the major problems of indoor localization research: The pitfall to reproduce research results in real life scenarios suffering from uncontrolled RF interference and the weakness of numerous published solutions being evaluated under individual, not comparable and not repeatable conditions.Accurate and robust indoor localization is a key enabler for context-awar ...
Read Project

 5

 FINISHED 

SUB nanosecond Leverage In PET/MR ImAging (SUBLIMA)

Start date: Sep 1, 2010, End date: Feb 28, 2015,

The SUBLIMA project aims at truly simultaneous, fully integrated, solid-state PET/MR technology for concurrent functional and anatomical imaging with unsurpassed image quality. It will combine the extremely sensitive functional imaging possibilities provided by PET with the excellent soft-tissue contrast and complementary functional imaging capabilities of MR. For the first time, time-of-flight (T ...
Read Project

 14

 FINISHED 

Investigating RINA as an Alternative to TCP/IP (IRATI)

Start date: Jan 1, 2013, End date: Dec 31, 2014,

Driven by the requirements of the emerging applications and networks, the Internet has become an architectural patchwork of growing complexity which strains to cope with the changes. Moore's law prevented us from recognising that the problem does not hide in the high demands of today's applications but lies in the flaws of the Internet's original design. The Internet needs to move beyond TCP/IP to ...
Read Project

 6

 FINISHED 

Novel Scene representations for richer networked media (SCENE)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

SCENE will develop novel scene representations for digital media that go beyond the ability of either sample based (video) or model-based (CGI) methods to create and deliver richer media experiences. The SCENE representation and its associated tools will make it possible to capture 3D video, combine video seamlessly with CGI, manipulate and deliver it to either 2D or 3D platforms in either linear ...
Read Project

 11

 FINISHED 
This Future Internet experiment will create a multi-autonomous-system experimental signalling overlay on the OFELIA OpenFlow infrastructure. We propose to marry an existing NSIS signalling stack, along with an existing multi autonomous system Virtual Path Slice controller, to the OFELIA OpenFlow experimental facility, thereby extending OpenFlow with signalling and multi-domain interworking on a m ...
Read Project

 4

 FINISHED 

OpenLab: extending FIRE testbeds and tools (OpenLab)

Start date: Sep 1, 2011, End date: Jun 30, 2014,

Experimentally-driven research is key to success in exploring the possible futures of the Internet. An open, general-purpose, shared experimental facility, both large-scale and sustainable, is essential for European industry and academia to innovate today and assess the performance of their solutions. OpenLab brings together the essential ingredients for such a facility. We extend early prototypes ...
Read Project

 31

 FINISHED 

Experimental UpdateLess Evolutive Routing (EULER)

Start date: Oct 1, 2010, End date: Jun 30, 2014,

The main objective of the EULER exploratory research project is to investigate new routing paradigms so as to design, develop, and validate experimentally a distributed and dynamic routing scheme suitable for the future Internet and its evolution. The resulting routing scheme(s) is/are intended to address the fundamental limits of current stretch-1 shortest-path routing in terms of routing table s ...
Read Project

 9

 FINISHED 

Secure Web OS Application Delivery Environment (webinos)

Start date: Sep 1, 2010, End date: Dec 31, 2013,

The webinos project will define and deliver an Open Source Platform and specific components for the Future Internet, which will enable web applications and services to be used and shared consistently and securely over a broad spectrum of converged and connected devices, including mobile, PC, home media (TV) and in-car units. Promoting a "single service for every device" vision, webinos will move t ...
Read Project

 23

 FINISHED 

Building service testbeds on FIRE (BonFIRE)

Start date: Jun 1, 2010, End date: Dec 31, 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Read Project

 26

 FINISHED 

Towards Real Energy-efficient Network Design (TREND)

Start date: Sep 1, 2010, End date: Nov 30, 2013,

European research cannot ignore key questions on energy consumption of communication networks, like: "Is the current growth of energy consumption in telecom infrastructures sustainable?"; "Can we generate and transport enough electricity to provide 100 Mb/s access to all in metropolitan areas?"; "Are optical technologies more energy-friendly than electronics?"; "Is the Internet protocol suite need ...
Read Project

 12

 FINISHED 
By design, the Internet combines two opposing aspects: On one hand, it works in a highly decentralised manner, allowing easy expansion and replacement; on the other hand, it has become a central unifying force for global information exchange. This paradox yields a constant stream of new problems and solutions, easily demonstrated by the range of projects within the FIRE initiative. In the meantime ...
Read Project

 7

 FINISHED 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Start date: Sep 1, 2010, End date: Oct 31, 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Read Project

 18

 FINISHED 
FIRE STATION provides the globally known FIRE (Future Internet Research and Experimentation) Initiative with an active hub that matches, guides and co-ordinates demand for - and offering of - experimentation facilities in the context of future networks and services. The heterogeneous and modular field of Future Internet Research and Experimentation with its national and international stakeholder g ...
Read Project

 8

 FINISHED 

European Support Framework on Networked Media R&D for SMEs (SMARD)

Start date: Sep 1, 2011, End date: Mar 31, 2013,

The EU-Project SMARD - European Support Framework on networked Media R&D for SMEs - has been designed to fill the existing gap within the exploitation chain between successful Networked Media Research and the commercialisation by SMEs.The SMARD Consortium is led by MFG Baden-Württemberg and comprises European partners from Salzburg Region (Salzburg Research), Flanders (Interdisciplinary Institute ...
Read Project

 4

 FINISHED 
This project will transform the perception of, and possibilities for, the next generation Internet. It addresses the FI Content Usage Call in a number of innovative, practical and useful ways. With inputs from 5 important content areas, spanning future uses of AV, games, Web, metadata and user created content, demonstrating usage beyond current state of the art, we have assembled a consortium incl ...
Read Project

 17

 FINISHED 
Internet is going to be massively "mobile". The efficient and growing internet of services has also to take into account issues of this "mobility" as well as the mobile devices and their applications. If, at the origin, mobile internet solutions depended on the power of mobile operators, today the take-off of the iPhone and its application-platform "Appstore" upset the balance of the forces. The f ...
Read Project

 7

 FINISHED 

Split architecture carrier class future networks (SPARC)

Start date: Jul 1, 2010, End date: Sep 30, 2012,

The project SPARC "Split architecture carrier grade networks" is aimed at the investigation and implementation of a new split in the architecture of the Future Internet and its building blocks. The design of the new architecture will focus on the split of control, forwarding and data processing elements. The objective of the Split Architecture is a modularisation of logical and physical functional ...
Read Project

 6

 FINISHED 

Cooperative and Self growing Energy aware Networks (CONSERN)

Start date: Jun 1, 2010, End date: Sep 30, 2012,

CONSERN is introducing a novel paradigm for dedicated, purpose-driven small scale wireless networks characterized by a service-centric evolutionary approach, referred here as an energy-aware self-growing network and system.In the context of CONSERN, the Self-Growing network paradigm considers (i) mechanisms for energy efficient interaction of the wireless network elements and (ii) mechanisms for t ...
Read Project

 10

 FINISHED 
Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Read Project

 53