Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Read Project

 34

 FINISHED 
A lot of cement plants all around Europe are standing before problem of by-pass kiln dust disposal. Nowadays small part of production is added in stabilizing admixture and the rest is disposed of as a waste material. In light of the fact that this material contains approximately 10–50 wt. % of KCl, free lime and dicalcium silicate, the possibility of their usage in alkali activated systems is at h ...
Read Project

 6

 FINISHED 
X-ray mammography is the mainstay of breast cancer screening programs. It is estimated that between 20 - 50% of abnormal screening mammograms will prove to be negative. The paradigm in diagnosis is to establish whether a lesion is benign or malignant. All the imaging techniques conventionally used today – diagnostic x-ray, ultrasonography and magnetic resonance imaging have many limitations, leadi ...
Read Project

 9

 FINISHED 

Rail Infrastructure Systems Engineering Network (RISEN)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

Social and economic growth, security and sustainability in Europe are at risk of being compromised due to aging and failing railway infrastructure systems. This partly reflects a recognised skill shortage in railway infrastructure engineering. This project, RISEN, aims to enhance knowledge creation and transfer using both international and intersectoral secondment mechanisms among European Advance ...
Read Project

 13

 FINISHED 
CELTA: Convergence of Electronics and Photonics Technologies for Enabling Terahertz Applications aims to produce the next generation of researchers who will enable Europe to take a leading role in the multidisciplinary area of utilizing Terahertz technology for applications involving components and complete systems for sensing, instrumentation, imaging, spectroscopy, and communications. All these ...
Read Project

 13

 FINISHED 

Switch and Crossing Optimal Design and Evaluation (S-CODE)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The overall aim of the S-CODE project is to investigate, develop, validate and initially integrate radically new concepts for switches and crossings that have the potential to lead to increases in capacity, reliability and safety while reducing investment and operating costs.The S-CODE project will identify radically different technology concepts that can be integrated together to achieve signific ...
Read Project

 9

 FINISHED 
NETCHEM Project aims at strengthening the capacities for international cooperation in Serbian and Albanian higher education institutions (HEIs) and enterprises in order to increase their education level and technical capacities regarding analytical instrumentation usage for Environmental & Food Safety Control (EFSC) through Technology Enhanced Learning and to increase benefits in health, environme ...
Read Project

 13

 FINISHED 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Start date: Jun 1, 2016, End date: May 31, 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Read Project

 25

 FINISHED 

Through Academic Cooperation Towards Innovtive Capacity

Start date: Oct 15, 2015, End date: Oct 14, 2018,

The project focused on the training and building up the capacity of management and governance in order to improve the higher education sector in the involved countries so that it can face the new challenges brought by globalization and the knowledge society. The aim is not only to increase higher education quality and accountability, but also to close the gap with developed and emerging countries. ...
Read Project

 11

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Read Project

 13

 FINISHED 

BIg Speech data analytics for cONtact centres (BISON)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

Contact centers (CC) are an important business for Europe: 35,000 contact centers generate 3.2 Million jobs (~1% of Europe’s active population). A typical CC produces a wealth of multilingual spoken data that is nowadays mined by humans (CC agents and supervisors) or by rudimentary technical means.BISON consortium plans to bring significant innovations in three areas: (1) basic speech data mining ...
Read Project

 8

 FINISHED 
For space missions, the energy density of batteries is a key factor of systems mass.A recent battery technology, based on this Lithium-Sulfur chemistry and developed by OXIS Energy, has shown promising results, particularly in terms of specific energy and cycling performances. Lithium-Sulfur batteries could become the next breakthrough technology for space batteries, with a factor of two on the sp ...
Read Project

 12

 FINISHED 

Educational Senior Network

Start date: Dec 1, 2014, End date: Oct 31, 2017,

The project EduSenNet is the project which focuses on the learning possibilities of the elderly over 50 on the chosen UTAs and countries with the aim to realise pedagogical research with the outcomes about formal, non-formal and informal learning of the elderly. The partners will focus on non-formal and informal learning possibilities of UTAs, evaluate them and describe links with formal educatio ...
Read Project

 7

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Apheleia – Integrated Cultural Landscape Management for Local and global sustainability Sustainability became a dominant key-word at the onset of the Brundtland report and, moreover, after the Eco-92 Earth Summit in Rio de Janeiro. Yet, 25 years later, the balance could not be other than to recognize our planet stands in a more unstable and less sustainable position, despite all intentions. The R ...
Read Project

 17

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
ALMARVI aims at providing cross-domain many-core platform solution, system software stack, tool chain, and adaptive algorithms that will enable massive data-rate image/video processing with high energy efficiency. ALMARVI will provide mechanisms and support for high degree of adaptivity at various system layers that will abstract the variations in the underlying platforms (e.g., due to imperfectio ...
Read Project

 19

 FINISHED 
European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Read Project

 34

 FINISHED 
MixedEmotions will develop innovative multilingual multi-modal Big Data analytics applications that will analyze a more complete emotional profile of user behavior using data from mixed input channels: multilingual text data sources, A/V signal input (multilingual speech, audio, video), social media (social network, comments), and structured data. Commercial applications (implemented as pilot proj ...
Read Project

 10

 FINISHED 

Orange Lifestyle

Start date: Mar 1, 2016, End date: Feb 28, 2017,

Project organizers wants to raise awareness on our impact on environment and society by wasting too much of resources, like water, electricity, forests and polluting air and water by driving cars, motor boats, ships, consuming too much of garbage and polluting ourselves by eating unhealthy, which all combined together in long-term brings our society to degradation, children overweight and reduce o ...
Read Project

 4

 FINISHED 

Nanoelectronic COupled Problems Solutions (nanoCOPS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Designs in nanoelectronics often lead to problems that are large to simulate and that include strong feedback couplings. Industry demands to include variability to guarantee quality and yield. It also requests to incorporate higher abstraction levels to allow for system simulation in order to shorten design cycles, while preserving accuracy. The nanoCOPS project considers the simulation of two pro ...
Read Project

 13

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Read Project

 32

 FINISHED 

Applying Pilot Models for Safer Aircraft (A-PiMod)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The A-PiMod proposal addresses improved flight safety by proposing a new approach to human centred cockpit design, which expands the understanding of the human factor in joint human-machine system, taking into account increasing levels of operational complexity and new operational concepts (SESAR). The project will advance concepts for a fully adaptive and human centered automation, through the in ...
Read Project

 8

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 
The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Read Project

 16

 FINISHED 
The application of rapid prototyping techniques has become a new trend in the fabrication of customized scaffolds for tissue regeneration or repair. The aim of the proposed project is to provide novel solutions for bottle-neck problems currently faced in establishing the corresponding processing chain, which encounter, among others, the extraction of essential geometry data of the damaged tissue f ...
Read Project

 5

 FINISHED 

Advanced Wireless Technologies for Clever Engineering (ADWICE)

Start date: Jun 1, 2015, End date: May 31, 2016,

The project Advanced Wireless Technologies for Clever Engineering (ADWICE) is aimed to create a strong partnership between the research center of Sensor, Information and Communication Systems (SIX, Czech Republic) and Vienna University of Technology (TUW, Austria). QS World University Rankings sets TUW on the 91st position among engineering faculties worldwide. The partnership will result in the t ...
Read Project

 2

 FINISHED 

Devices for Neurocontrol and Neurorehabilitation (DENECOR)

Start date: Jun 1, 2013, End date: Mar 31, 2016,

The primary aim of DeNeCor is to resolve this top issue such that electronic neuromodulation therapy becomes mainstream and full market potential can be obtained. We will increase acceptance by neurologists by demonstrating designed co-existency between therapy devices and diagnostic systems. The second aim of DeNeCor is to extrapolate the ‘bilateral’ agreements between AIMD and MRI manufactures i ...
Read Project

 22

 FINISHED 

Adaptive Cooperative Control in Urban (sub) Systems (ACCUS)

Start date: Jun 1, 2013, End date: Jan 31, 2016,

Urban systems like traffic, energy, and outdoor lighting are managed by self-contained embedded systems – though the managed processes are deeply interconnected. New applications and collective optimization require integration of these systems which represents a truly “systems of systems” integration problem: these urban systems evolve independently, have their own purpose and internal policies wh ...
Read Project

 28

 FINISHED 
IMPART will research, develop and evaluate intelligent information management solutions for 'big data' problems in the field of digital cinema production. It will find new ways of managing, visualising and analysing very large multimodal data sets so that creative personnel can review three-dimensional scene representations on the set, understand the data, identify errors, evaluate the quality of ...
Read Project

 6

 FINISHED 
Modern advanced products of today use embedded computing systems with exacting requirements on execution speed, timeliness, and power consumption. It is a grand challenge to guarantee these requirements across product families and in the face of rapid technological evolution, as current development practices cannot manage performance requirements the same way they manage functional requirements.Ev ...
Read Project

 20

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

By its participation in the highly anticipated new phase of the Erasmus programme, Brno University of Technology follows up on successful realization of student and staff mobilities and support of the international cooperation within the previous LLP and Socrates programmes. The necessary renewal of all the interinstitutional (formerly and still informally known as "bilateral") agreements with par ...
Read Project

 1

 FINISHED 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Read Project

 28

 FINISHED 
The overall aim of the KhAI-ERA project is to integrate the National Aerospace University (KhAI) into ERA, by reinforcing its cooperation capacities and twinning with European research and innovation organisations in its 3 strongest aerospace and IT research topics: A) Composite Materials, B) Advanced Manufacturing for Aircraft Assembly, and C) Dependable Embedded Systems. These are topics highly ...
Read Project

 6

 FINISHED 
The overall objective of IDEAS “Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety”, - is to develop advanced packaging for power supply components and new generation memory systems having application on Electric and ICE propelled vehicles and aiming at covering complementary aspects which haven’t yet addressed into the main running ENIAC and ARTEMIS Aut ...
Read Project

 15

 FINISHED 

Universal SEM as a multi-nano-analytical tool (UnivSEM)

Start date: Apr 1, 2012, End date: Mar 31, 2015,

The current scientific interest and next generation of nanotechnology-based products is combining converging fields and dealing with a large complexity (e.g. organic electronics, nanomedicine). We can see growing needs to visualize, manipulate, modify and characterize nano-objects in a single tool.The aim of the UnivSEM project is to develop a novel multimodal tool combining- a vision capability b ...
Read Project

 10