Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Overall objective is to support joint sustainable management of natural resources in interfluves of Tisza and Tur rivers.Specific objectives:• To improve the joint management of water resources aimed at ecologically sustainable water use and flood mitigation. • To assess ecological status of water bodies and to develop joint program of measures for improvement of water quality and water bodies pro ...
Read Project

 7

 FINISHED 
The project aims to promote decrease of floods and droughts negative impact and integrative water management introduction in Beregovo polder system, specificly a complex activities realisation on flood protection and environmental situation improvement in the basin of Charonda-Latorytsa channel of Beregovo polder system. The main activities include: Support of joint Ukrainian -Hungarian project wo ...
Read Project

 6

 FINISHED 
...urther development of planned technical solutions. 2. Developing the Hungarian-Ukrainian hydrological forecasting system. Further development of the flood forecast and information system covering the Upper-Tisza river basin above Tokaj, as the result of which data and information will be accessible on-line to every concerned party and institution. 2.1 Developing such a common IT system, which sati ...
Read Project

 3

 FINISHED 
... Achievements: On-line accessibility of operative telemetered dataIncreased flood protection in the complete Upper-Tisza region.Increased necessary time-advance for flood defense due to the conversion of the telemetric system into a process control system.Increased confidence and authenticity of data as a res ...
Read Project

 2

 FINISHED 
Meuse, Roer, Elbe, Sava, Western Bug and Tisza-Somes) represented by 15 selected partners. Overall objective of the project is identification, sharing and transfer of good practices on sustainable cross-border flood management in European river basins, using the instruments of the FRMD. Therefore, the project is divided in three phases, following the steps of the FRMD and addressing the three diff ...
Read Project

 12

 FINISHED 
Overall objective(s): Mitigate flood waves along the Hungarian-Ukrainian border section of the Tisza River, preliminary planning activities for the revitalization of the floodplains. Specific objective: Create emergency reservoirs on the Vásárosnamény – Visk section of the Tisza, and integrate the existing reservoirs. The establishments of the planned emergency reservoirs and the attached hydrolog ...
Read Project

 2

 FINISHED 

Flood Awareness and Prevention Policy in border areas (FLAPP)

Start date: Aug 31, 2004, End date: Dec 30, 2007,

The network is seeking to contribute to common European strategies for flood risk management, especially in border areas where flood-related issues are likely to arise. It intends to achieve this by enabling those responsible for European river systems and their feeders to exchange information and experience. FLAPP also expects that its work will influence a new European flood water directive. ...
Read Project

 36

 FINISHED 
Four rivers flow into the area controlled by the Upper-Tisza Regional Environmental and Water Directorate. The Tisza from the Ukraine, and the Szamos (Somes), the Kraszna (Crasna) and the Túr (Tur) from Romania. These rivers are rather special because they can produce floods very quickly in any season, leaving very little time for a flood defence response. Thus a timely, precise, reliable flood fo ...
Read Project

 1

 FINISHED 
The project aimed to assist the investigation of the section of the River Szamosdelimited by flood protection dikes between Vásárosnamény and the border. Theriver regulation concept constituted an urgent task. Design of the waterway enabledthe traffic of watercraft of small dive. The large water riverbed rearrangement concepthad a great impact on the rehabilitation of dead riverbeds valuable from ...
Read Project

 3

 FINISHED 
The primary objective was to lay the groundwork for a major project that will include the elaboration of the permit plans of a flood control overflow reservoir, an environmental impact study, and a joint Hungarian-Romanian flood control model and plan. This project is vital, as it could prove to be the thing that saves the special natural environment of the unique and wonderful Túr and Öreg-Túr ri ...
Read Project

 2

 FINISHED 
The project aimed to prepare for the availability of documentation required forthe implementation of the complex rehabilitation of the River Túr water systemso that it could be utilized, partly or entirely, for the development of the region.Therefore the funding was used for completing an environmental survey of the area,for mapping tourist attractions in connection with water flora and fauna and ...
Read Project

 6

 FINISHED 
The common Regulations on Inland Water relating to watercourses constituting andintersecting the border is outdated. Therefore it was decided on a meeting of the WaterConservancy Technical Joint Committee in 2002 that the Regulation be updated by makinguse of IT developments, and technical knowledge and working practices be shared to improveco-operation. As a result of the surveys, places which re ...
Read Project

 4