Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
We envision a radical redesign of Earth observation platforms for sustained operation at significantly lower altitudes than the current state of the art, using a combination of new aerodynamic materials, aerodynamic control and air-breathing electric propulsion for drag-compensation, for a variety of observation methods with the aim of creating a new platform paradigm.This vision requires foundati ...
Read Project

 9

 FINISHED 

Building Innovation in the Extended Digital Chain (InnoChain)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

The InnoChain ETN network is a shared research training environment examining how advances in digital design tools challenge building culture enabling more sustainable, more informed and more materially smart design solutions. The network aims to train a new generation of interdisciplinary researchers with a strong industry focus that can effect real changes in the way we think, design and build o ...
Read Project

 6

 FINISHED 
Assessing individual exposure to environmental stressors and predicting health outcomes implies that both environmental exposures and epi/genetic variations are reliably measured simultaneously. HEALS (Health and Environment-wide Associations based on Large population Surveys) brings together in an innovative approach a comprehensive array of novel technologies, data analysis and modeling tools th ...
Read Project

 37

 FINISHED 
FrakRisk further develops the knowledge base for understanding, preventing and mitigating the potential impact of the exploration and exploitation of shale gas reserves found throughout Europe. This will include international experience, state of the art process understanding, state of the art modelling techniques and the further development of fully accepted risk assessment tools for site screeni ...
Read Project

 13

 FINISHED 

Rydberg Quantum Simulators (RYSQ)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

Quantum Simulators provide new levels of understanding of equilibrium and out-of-equilibrium properties of many-body quantum systems, one of the most challenging problems in physics. The main objective of the RYSQ project is to use Rydberg atoms for quantum simulations, because their outstanding versatility will allow us to perform a great variety of useful quantum simulations, by exploiting diffe ...
Read Project

 16

 FINISHED 

Semi-Autonomous 3rd Hand (3rd HAND)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Robots have been essential for keeping industrial manufacturing in Europe. Most factories have large numbers of robots in a fixed setup and few programs that produce the exact same product hundreds of thousands times. The only common interaction between the robot and the human worker has become the so-called "emergency stop button". As a result, re-programming robots for new or personalized produc ...
Read Project

 4

 FINISHED 

FLUIDGLASS

Start date: Sep 1, 2013, End date: Aug 31, 2017,

The FLUIDGLASS project develops a new and innovative concept for multifunctional solar thermal glass façades systems. The FLUIDGLASS approach turns passive glass façades into active transparent solar collectors while at the same time controlling the energy flow through the building envelope.FLUIDGLASS unites four key functionalities in one integrated system: The system firstly acts as a fully tran ...
Read Project

 11

 FINISHED 

Synthesis of systematic resources (SYNTHESYS3)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

SYNTHESYS3 will create an accessible, integrated European resource for researchers in the natural sciences in Europe and globally. Building on the success of the previous SYNTHESYS IA, the NA will focus on improving collections management of new physical and virtual collections. By focusing the JRA on extracting and enhancing data from digitised collections, SYNTHESYS3 will increase the accessibil ...
Read Project

 21

 FINISHED 
The management of crisis is one of the great challenges of the 21st century. The ever growing human, economic and environmental losses due to natural and man-made disasters evidence the need for a systematic approach to the management of crisis. A multi-disciplinary understanding and disaster risk management is required. In such situations, Collaborative Crisis Management (CCM) is usually coordina ...
Read Project

 18

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 
In the recent years due to tremendous development and integration of renewable energy resources in Europe, hydraulic turbines and pump-turbines are key technical components to contribute to renewable energy production and to compensate for the stochastic nature of the variable energy sources, preserving thus the electrical grid stability.As a result, the overarching objective of the project is the ...
Read Project

 10

 FINISHED 
NANOREM is designed to unlock the potential of nanoremediation and so support both the appropriate use of nanotechnology in restoring land and aquifer resources and the development of the knowledge-based economy at a world leading level for the benefit of a wide range of users in the EU environmental sector.NANOREM uniquely takes a holistic approach to examining how the potential for nanoremediati ...
Read Project

 30

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
CHEM21 is a project that will develop a broad based portfolio of sustainable technologies for green chemical intermediate manufacture aimed at the pharmaceutical industry. Initially working with the EFPIA members the collaborators of CHEM21 will analyse a number of projects that are in development to decide which the priorities are for technology development. This analysis will also be used to upd ...
Read Project

 19

 FINISHED 

PRACE - Third Implementation Phase Project (PRACE-3IP)

Start date: Jul 1, 2012, End date: Jun 30, 2016,

PRACE-3IP supports the accelerated implementation of the pan-European HPC Research Infrastructure (RI) created in April 2010. It continues, complements, and extends the work of the PRACE-1IP and -2IP projects.PRACE-3IP addresses the computational and simulation needs of European scientific communities and of industry to keep them at the forefront of discovery. Our vision is the formation of an int ...
Read Project

 48

 FINISHED 

Neuro-Enhancement: Responsible Research and Innovation (NERRI)

Start date: Mar 1, 2013, End date: May 31, 2016,

This project aims to contribute to the introduction of Responsible Research and Innovation in neuro-enhancement (NE) in the European Research Area and to the shaping of a normative framework underpinning the governance of NE technologies. These will be achieved through mobilization and mutual learning (MML) activities engaging scientists, policy-makers, industry, civil society groups and the wider ...
Read Project

 19

 FINISHED 

Simulators and Interfaces with Quantum Systems (SIQS)

Start date: May 1, 2013, End date: Apr 30, 2016,

The overarching goal of our project is to develop systems based on direct and deterministic interactions between individual quantum entities, which by involving large-scale entanglement can outperform classical systems in a series of relevant applications.We plan to achieve that by improving technologies from atomic, molecular and optical physics as well as from solid-state physics, and by develop ...
Read Project

 32

 FINISHED 
A review of the embodied energy values of the various building materials shows that the embodied energy of the most widely used insulation materials in construction applications is characterised by very high values. This mainly results either from the energy intensive conditions applied for the manufacturing of the mineral based insulation materials or from the high embodied energies of the oil-ba ...
Read Project

 15

 FINISHED 
The objective of the P4FIFTY project is to deliver a trans-European network of industrially oriented white biotechnologists fully trained in the application of cytochrome P450 monooxygenases (P450s) for application in the chemical manufacturing and pharmaceutical industries. This willinvolve academic groups investigating P450 diversity exploration from the wild type enzymes and their genes, genome ...
Read Project

 10

 FINISHED 

Shaping the future of electronic identity (FutureID)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The FutureID project builds a comprehensive, flexible, privacy-aware and ubiquitously usable identity management infrastructure for Europe, which integrates existing eID technology and trust infrastructures, emerging federated identity management services and modern credential technologies to provide a user-centric system for the trustworthy and accountable management of identity claims.The Future ...
Read Project

 20

 FINISHED 

Sub-seabed CO2 Storage: Impact on Marine Ecosystems (ECO2) (ECO2)

Start date: May 1, 2011, End date: Apr 30, 2015,

The ECO2 project sets out to assess the risks associated with the storage of CO2 below the seabed. Carbon Capture and Storage (CCS) is regarded as a key technology for the reduction of CO2 emissions from power plants and other sources at the European and international level. The EU will hence support a selected portfolio of demonstration projects to promote, at industrial scale, the implementation ...
Read Project

 29

 FINISHED 
The FREE project aims at understanding the impact of the most popular and most widely shared of all expressions of popular culture - football - on identity dynamics in an enlarged Europe.In a truly interdisciplinary perspective FREE seeks to explore an apparently non-political, but fully existing sub-cultural European public space of communication: the European football scene in the largest sense. ...
Read Project

 9

 FINISHED 

PRACE - Second Implementation Phase Project (PRACE-2IP)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

PRACE-2IP supports the accelerated implementation of the pan-European HPC Research Infrastructure created in April 2010 as the result of the preparatory phase PRACE project. It complements and extends the work of the PRACE-1IP project that was started in July 2010.PRACE-2IP addresses the computational and simulation needs of European scientific communities to keep them at the forefront of discover ...
Read Project

 50

 FINISHED 

Efficient ENergy for EU Cultural Heritage (3ENCULT)

Start date: Oct 1, 2010, End date: Mar 31, 2014,

"The project 3ENCULT bridges the gap between conservation of historic buildings and climate protection, which is not an antagonism at all: historic buildings will only survive if maintained as living space. Energy efficient retrofit is useful for structural protection as well as for comfort reasons - comfort for users and “comfort” for heritage collections.The joint task of conservation and energy ...
Read Project

 24

 FINISHED 
VERITAS aims to develop, validate and assess an open framework for built-in accessibility support at all stages of ICT and non-ICT product development, including specification, design, development and testing. The goal is to introduce simulation-based and VR testing at all stages of product design and development into the automotive, smart living spaces, workplace, infotainment and personal health ...
Read Project

 33

 FINISHED 

PRACE - First Implementation Phase Project (PRACE-1IP)

Start date: Jul 1, 2010, End date: Dec 31, 2013,

Large scale simulations are the third pillar of science today alongside theory and experiment. They produce scientific insights, technological advances, and solve problems in many fields of society. Their tools are high-end computers and effective software. PRACE, the Partnership for Advanced Computing, has been created as a not for profit association in May 2010 as a permanent pan-European High P ...
Read Project

 46

 FINISHED 

Physics of Complex Colloids: Equilibrium and Driven (COMPLOIDS)

Start date: Nov 1, 2009, End date: Oct 31, 2013,

"With progress in nanotechnology, biophysics, and polymer synthesis, colloidal science has reached a new level of importance. A large variety of complex colloids of different shapes, with binding specificity, and variable softness has been synthesized, opening quite exciting ways for engineering materials at the nanoscale. The purpose of COMPLOIDS is to obtain a fundamental understanding of the Ph ...
Read Project

 12

 FINISHED 
The ultimate ambition of COPIRIDE is to develop a new modular production and factory concept for the chemical industry using adaptable plants with flexible output. This concept will be superior, intellectual property (IP) protected, and enable a much wider spread of know-how and education of this skill-intensive technology. Key functional enabling units are new production-scale, mass-manufactured ...
Read Project

 19

 FINISHED 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Read Project

 67

 FINISHED 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Read Project

 19

 FINISHED 
"SAVE ME aims to develop a system that detects natural (i.e. earthquake, fire,…) and man-made (i.e. terrorist attacks) disaster events in public transport terminals / vehicles and critical infrastructures (i.e. tunnels, and bridges) and that supports quick and optimal mass evacuation guidance, to save the lives of the general public and the rescuers, giving particular emphasis to the most vulnerab ...
Read Project

 11

 FINISHED 

Controlling Chronic Diseases related to Metabolic Disorders (METABO)

Start date: Jan 1, 2008, End date: Aug 31, 2012,

The aim of METABO is to set up a comprehensive platform, running both in clinical settings and in every-day life environments, for continuous and multi-parametric monitoring of the metabolic status in patients with, or at risk of, diabetes and associated metabolic disorders.The type of parameters that will be monitored, in addition to traditional clinical and biomedical parameters, will also inc ...
Read Project

 27

 FINISHED 

Towards EXaflop applicaTions (TEXT)

Start date: Jun 1, 2010, End date: Aug 31, 2012,

With top systems reaching the PFlop barrier, the next challenge is to understand how applications have to be implemented and be prepared for the ExaFlop target. Multicore chips are already here but will grow in the next decade to several hundreds of cores. Hundreds of thousands of nodes based on them will constitute the future exascale systems.TEXT is centered on the vision that the key component ...
Read Project

 10

 FINISHED 

Water Treatment by Molecularly Imprinted Materials (WATERMIM)

Start date: May 1, 2009, End date: Apr 30, 2012,

The present “WATERMIM” proposal is focused on the advancement and optimization of the MIP technology in order to produce functional materials with well-defined morphologies with respect to pore structure and selectivity for water treatment applications. The project aims at the elimination of the random distribution and the uneven accessibility of receptor sites in the volume of the imprinted mater ...
Read Project

 10

 FINISHED 

Integrated European Industrial Risk Reduction System (IRIS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

Current practices in risk assessment and management for industrial systems are characterized by its methodical diversity and fragmented approaches. In retrospect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligatio ...
Read Project

 37

 FINISHED 

European Network on Noise And Health (ENNAH)

Start date: Sep 1, 2009, End date: Jan 31, 2012,

"This proposal puts forward plans to establish a research network of experts on noise and health in Europe. This network will establish future research directions and policy needs in Europe. The network will review the existing literature on environmental noise exposure and health focussing on the consolidation of existing state of the art knowledge and the identification of gaps in the evidence a ...
Read Project

 37

 FINISHED 

SENSITIVE TECHNOLOGIES AND EUROPEAN PUBLIC ETHICS (STEPE)

Start date: May 1, 2008, End date: Dec 31, 2011,

"This proposal is to establish a Consortium to provide academic input into the planned Eurobarometer Survey on the Life Sciences and Sensitive Technologies in 2008. It is also intended to add value to the survey and thereby enhance its impact and policy relevance with extensions of a conceptual, contextual and a methodological nature. First, we introduce the concept ‘public ethics’, moving beyond ...
Read Project

 13

 FINISHED 

Systems Biology as a Driver for Industrial Biotechnology (SYSINBIO)

Start date: Dec 1, 2008, End date: Nov 30, 2011,

"Metabolic engineering is an applied science focusing on developing new cell factories or improving existing ones. Metabolic engineering is an enabling science, and distinguishes itself from applied genetic engineering by the use of advanced analytical tools for identification of appropriate targets for genetic modifications and the use of mathematical models to perform in silico design of optimiz ...
Read Project

 21

 FINISHED 

Adaptable Pervasive Flows (Allow)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

The objective of the project is to develop a new programming paradigm for human-oriented pervasive applications. This paradigm will enable pervasive technical systems to adapt automatically and seamlessly to humans involved and embedded in them, explicitly supporting people in achieving well-defined goals in dynamically changing environments and contexts. Furthermore, it will enable the integratio ...
Read Project

 5

 FINISHED 

Intelligent Use of Buildings' Energy Information (IntUBE)

Start date: May 1, 2008, End date: Apr 30, 2011,

The energy consumption in the operational phase of buildings is one of the major contributions to energy use in Europe. The improvement of energy efficiency only in the renewed stock (new and renovated buildings) is too slow considering the ambitious goal to improve the energy efficiency by 20 % before 2020.IntUBE will lead to increased life-cycle energy efficiency of the buildings without comprom ...
Read Project

 16