Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 
MANGO targets to achieve extreme resource efficiency in future QoS-sensitive HPC through ambitious cross-boundary architecture exploration for performance/power/predictability (PPP) based on the definition of new-generation high-performance, power-efficient, heterogeneous architectures with native mechanisms for isolation and quality-of-service, and an innovative two-phase passive cooling system. ...
Read Project

 9

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Next Generation Train Control (NGTC)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Read Project

 21

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Harnessing Performance Variability (HARPA)

Start date: Sep 1, 2013, End date: Nov 30, 2016,

Application requirements, power, and technological constraints are driving the architectural convergence of future processors towards heterogeneous many-cores. This development is confronted with variability challenges, mainly the susceptibility to time-dependent variations in silicon devices. Increasing guard-bands to battle variations is not scalable, due to the too large worst-case cost impact ...
Read Project

 8

 FINISHED 

COgnitive & Perceptive CAMeraS (COPCAMS)

Start date: Apr 1, 2013, End date: Sep 30, 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Read Project

 25

 FINISHED 
Cyber-physical networks based on embedded systems are part of our society and gain spread and importance. Next generations of aircrafts and cars will be tightly interconnected with each other, with the Internet and other infrastructures. The same holds for many industries and areas of our life. Ubiquitous, highly critical systems go online and create a domain of mixed criticalities, where security ...
Read Project

 15

 FINISHED 
A significant amount of network capacity needs to be available throughout the disaster and affected areas to support effective Public Protection and Disaster Relief (PPDR) communications where mobility is the main requirement. At the very early response stages voice communications are critical, after which non-voice communications are an important requirement dependent on the nature of the disast ...
Read Project

 11

 FINISHED 
SARABAND project aims to take advantage of the Q-band frequency (40,5 to 43,5 GHz) in a cost effective way to provide higher performing and integrated network nodes for wireless backhaul of future mobile radio and last mile access for the digital divide by developing smart antennas and front-end radio modules. The use of millimeter waves, particularly the Q-band where 3GHz bandwidth has been regul ...
Read Project

 10

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Ultra Wide Context Aware Imaging (PANORAMA)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Read Project

 17

 FINISHED 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Start date: Oct 1, 2011, End date: Oct 31, 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Read Project

 28

 FINISHED 
...savings, and memory coherency will be addressed and will influence the way the system is virtualized.The vIrtical consortium is formed by key European players in the embedded market (UNIBO,UPV,TEI,ST,THALES,ARM,SYSGO,VOSYS), so guaranteeing the right development of the different layers tackled in the virtualization-ready SoC platform
Read Project

 8

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 

CALIPSO: Connect All IP-based Smart Objects! (CALIPSO)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

Smart Objects and the Internet of Things provide unparalleled means toconnect the physical world with the digital world, enabling importantapplications such as Smart Infrastructures, Smart Cities, and SmartToys. But existing systems are typically proprietary and tailored toone specific application and sacrifice interoperability for low powerconsumption. This hinders widespread adoption.CALIPSO bu ...
Read Project

 9

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 
"The PRESTO project aims at improving test-based embedded systems development and validation, while considering the constraints of industrial development processes. This project is based on the integration of (a) test traces exploitation (generated by test execution in the software integration phase induced by the industrial development process, to validate the requirements of the system) along wi ...
Read Project

 15

 FINISHED 
NEREIDS will bring innovate capablities based on EO to make a best exploitation of available space technologies.NEREIDS capabilities will bring enhancedEO capabilities by combining different sensors with innovative data fussion tecniques.NEREIDS will bring a toolbox apporach enabling share data an capabilities and support a comon maritime piture.NEREIDS will make an analysis of maritime surveillan ...
Read Project

 20

 FINISHED 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Read Project

 41

 FINISHED 

Sea Border Surveillance (SeaBILLA)

Start date: Jun 1, 2010, End date: Feb 28, 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Read Project

 29

 FINISHED 

Secure Memories and Applications Related Technologies (SMART)

Start date: Jan 1, 2010, End date: Dec 1, 2013,

SMART Secure memories and applications-related technologies Growth in digital multimedia and in wired and wireless Internet- based services focuses attention on the need for protection of personal data and identification. Various electronic certification devices have been used – from magnetic-strip cards to increasingly sophisticated smart cards. Convergence of applications such as personal or pri ...
Read Project

 14

 FINISHED 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Read Project

 19

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15

 FINISHED 

TEstbed for Future Internet Services (TEFIS)

Start date: Jun 1, 2010, End date: Feb 28, 2013,

The flourishing of user driven demand, the heterogeneity of networks, the multiplicity of new devices, all mean that the Internet as we know it is reaching a saturation point. One of the main challenges of Future Internet research is to address the surge in complexity that service and network developers are facing.Building on top of the on-going actions to support large-scale experimentation for F ...
Read Project

 19

 FINISHED 
FIVER project proposes and develops a novel integrated access network architecture employing only OFDM signals for the provision of quintuple play services (Internet, phone/voice, HDTV, wireless -WiMAX, UWB and LTE femtocell- and home security/control). FIVER architecture is completely integrated: The optical access FTTH, the in-home optical distribution network and the final radio link become par ...
Read Project

 10

 FINISHED 
The main goal of the FARAMIR project is to research and develop techniques for increasing the radio environmental and spectral awareness of future wireless systems. The proposed holistic approach starts from the development of spectrum sensing hardware investigating how such functionality could be efficiently integrated to handheld devices. In the next step, we will combine measurements performed ...
Read Project

 10

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 

Beyond Next Generation Mobile Broadband (BuNGee)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

An IMT-Advanced key requirement for next generation systems is the support for unprecedentedly high throughputs per user.This implies an infrastructure –composed of access and backhaul network–capable of supporting the resulting high capacity densities.The current next-generation technologies LTE and WiMAX support a mere 100Mbps/Km2 in ordinary cellular deployment.This is insufficient, in particul ...
Read Project

 9

 FINISHED 
"The goal of this project is to elaborate an open architecture for the operation of unmanned air-to-ground wide area land and sea border surveillance platforms in Europe. This architecture is based on analysis of concepts and scenarios for UAV-based aerial surveillance of European borders. It takes into account the emerging legislation for insertion of UAS into controlled civil airspace. The techn ...
Read Project

 14

 FINISHED 

Foundations for Forgery-Resistant Security Hardware (UNIQUE)

Start date: Sep 1, 2009, End date: May 31, 2012,

The goal of the UNIQUE project is to tackle the problem of counterfeiting of and tampering with Integrated Circuits (ICs). Since ICs are at the core of modern and often critical electronics products and IT systems it is very important that their integrity can be guaranteed. We will develop an integrated approach to protect hardware systems against counterfeiting, cloning, reverse engineering, tamp ...
Read Project

 10

 FINISHED 
The proposed HERMES project wants to initiate a new mainstream packaging concept not bound by the existing supply chain, and by large-scale manufacturing technology. The project is aiming at further developing the concept of embedded thin chips into electronic boards, as a base for an integrated manufacturing of electronic circuits.The project consortium will develop a technology for embedding act ...
Read Project

 14

 FINISHED 
...ing a smart camera system and an outdoor broadband wireless telecom system. SATURN combines two SME tool vendors (Artisan and Extessy AG) with leading system houses (Intracom S.A. Telecom Solutions & Thales Security Systems S.A.S). The consortium also includes two major European Universities: Paderborn University & University of Cantabria. SATURN enables Artisan to build on its leading position in ...
Read Project

 9